For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 70-91 — Reporting requirements

Code of Ordinances of the City of Jonesboro, Arkansas (Codified through Ordinance No. 25:028, enacted September 2, 2025. (Supp. No. 16)) · Jonesboro City Code § 70-91

Corpus is an independent public-information project, not the official City of Jonesboro website. Stable reference: corpuslaw.us/code/55d4c12d-436e-477a-a3ab-a188cf534ca0

Sec. 70-91. - Reporting requirements.

(1) Baseline monitoring reports. (a) Within either 180 days after the effective date of a categorical pretreatment standard or 180 days after the final administrative decision on a category determination under 40 CFR 403.6(a)(4), whichever is later, existing industrial users subject to such categorical pretreatment standards currently discharging to or scheduled to discharge to the POTW shall be required to submit to the manager a report which contains all of the information listed in subsection (1)(b) of this section. At least 90 days prior to commencement of discharge, new sources and sources that become categorical industrial users subsequent to the promulgation of an applicable categorical standard shall be required to submit to the manager a report which contains the information listed in subsection (1)(b). A new source shall also be required to report the intended method of pretreatment to meet applicable pretreatment standards and give estimates of anticipated flow and quantity of discharged pollutants. (b) The industrial user shall submit the information required by this section including: 1. Identifying information. The name and address of the facility, including the name of the operator and owners; 2. Environmental permits. A list of any environmental control permits held by or for the facility; 3. Description of operations. A brief description of the nature and average rate of production (including each product produced by type, amount, processes, and rate of production), and standard industrial classifications (SIC) of the operation(s) carried out by the industrial user. This description should include a schematic process diagram, which indicates points of discharge to the POTW from the regulated processes; 4. Flow measurement. Information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from regulated process streams and other streams, as necessary, to allow use of the combined waste stream formula, as set out in 40 CFR 403.6(e); 5. Measurement of pollutants. a. The categorical pretreatment standards applicable to each regulated process and any new categorically regulated processes for existing sources; b. The results of sampling and analysis identifying the nature and concentration and/or mass, where required by the standard or by the manager, of regulated pollutants in the discharge from each regulated process. Instantaneous, daily maximum, and long-term average concentrations or mass shall be reported where required. The sample shall be representative of daily operations and shall be analyzed in accordance with procedures set out in subsection (10) of this section; c. In cases where the standard requires compliance with a best management practice or pollution prevention alternative, the user shall submit documentation as required by the manager or the applicable standard to determine compliance with the standard; d. Sampling shall be pursuant with subsection (11) of this section; e. The user shall take a minimum of one representative sample to compile that data necessary to comply with the requirements of this section; f. Samples should be taken immediately downstream from pretreatment facilities if such exist or immediately downstream from the regulated process if no pretreatment exists. If other wastewaters are mixed with the regulated wastewater prior to pretreatment, the user should measure the appropriate flows and concentrations necessary to allow use of the combined waste stream formula set forth in 40 CFR 403.6(e) to evaluate compliance with the pretreatment standards. When an alternative concentration or mass limit has been calculated in accordance with 40 CFR 403.6(e), this adjusted limit, along with supporting data, shall be submitted to the control authority; g. The manager may allow the submission of a baseline report which utilizes only historical data, so long as the data provides information sufficient to determine the need for industrial pretreatment measures; and h. The baseline report shall indicate the time, date, and place of sampling and methods of analysis and shall certify that such sampling and analysis is representative of normal work cycles and expected pollutant discharges to the POTW. 6. Compliance certification. A statement reviewed by the authorized representative of the industrial user, as defined in section 70-85(4), and certified by a qualified professional, indicating whether pretreatment standards are being met on a consistent basis, and if not, whether additional operation and maintenance (O&M) and/or additional pretreatment is required to meet the pretreatment standards and requirements. 7. Compliance schedule. If additional O&M and/or pretreatment will be required to meet the pretreatment standards, the shortest schedule by which the industrial user will provide such additional pretreatment and/or O&M must be provided. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. A compliance schedule pursuant to this section must meet the requirements set out in subsection (2) of this section. 8. Signature and report certification. All baseline-monitoring reports must be certified in accordance with subsection (14)(a) of this section and signed by an authorized representative of the industrial user as defined in section 70-85(4). (2) Compliance schedule progress report. The following conditions shall apply to the schedule required by subsection (1)(b)7. of this section: (a) The schedule shall contain progress increments in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet the applicable pretreatment standards. Such events include hiring an engineer, completing preliminary and final plans, executing contracts for major components, commencing and completing construction, and beginning and conducting routine operation. (b) No increment referred to above shall exceed nine months. (c) The industrial user shall submit a progress report to the manager no later than 14 days following each date in the schedule and the final date of compliance including, at a minimum, whether or not it complied with the increment of progress, the reason for any delay, and the steps being taken by the industrial user to return to the established schedule. (d) In no event shall more than nine months elapse between each progress report to the manager. (3) Report on compliance with categorical pretreatment standard deadline. Within 90 days following the date for final compliance with applicable categorical pretreatment standards or in the case of a new source following commencement of the introduction of wastewater into the POTW, any industrial user subject to such pretreatment standards and requirements shall submit to the manager a report containing the information described in subsection (1)(b)4. and 5. of this section. For industrial users subject to equivalent mass or concentration limits established in accordance with the procedures in section 70-87(2) and 40 CFR 403.6(c), this report shall contain a reasonable measure of the industrial user's long-term production rate. For all other industrial users subject to categorical pretreatment standards expressed in terms of allowable pollutant discharge per unit of production (or another measure of operation), this report shall include the industrial user's actual production during the appropriate sampling period. All compliance reports must be signed and certified in accordance with subsection (14)(a) of this section. All sampling shall be done in conformance with subsection (11). (4) Periodic compliance reports. (a) All SIUs subject to a pretreatment standard must, at a frequency determined by the manager but in no case less than twice per year (in June and December at a minimum (or on dates specified), as required by 40 CFR 403.12(e)(1)), submit a report indicating the nature and concentration of pollutants in the discharge which are limited by such pretreatment standards and the measured or estimated average and maximum daily flows for the reporting period. In cases where the pretreatment standard requires compliance with a BMP (or pollution prevention alternative) the SIU shall submit documentation required by CWL or the pretreatment standard necessary to determine the SIU's compliance status. At the discretion of CWL and in consideration of such factors as local high or low flow rates, holidays, budget cycles, etc., CWL may modify the months during which the above reports are to be submitted. (b) All periodic compliance reports must be signed and certified in accordance with subsection (14)(a) of this section. (c) All wastewater samples must be representative of the SIU's discharge. Wastewater monitoring and flow measurement facilities shall be properly operated, kept clean, and maintained in good working order at all times. The failure of an industrial user to keep its monitoring facility in good working order shall not be grounds for the industrial user to claim that sample results are unrepresentative of its discharge. (d) If an Industrial User subject to the reporting requirement set forth in this section monitors any regulated pollutant at the appropriate sampling location more frequently than required by the Manager by the procedures prescribed in subsections (10) and (11) of this section, the results of this additional monitoring shall be included in the report. (5) Report of changed conditions. Each industrial user is required to notify the manager of any planned significant changes, as defined below, to the industrial user's operations or system which might alter the nature, quality, or volume of its wastewater at least 60 days before the change. (a) The manager may require the industrial user to submit such information as deemed necessary to evaluate the changed condition, including the submission of an individual or general wastewater discharge permit application under section 70-89(5). (b) The manager may issue an individual or general wastewater discharge permit under section 70-90(8) or modify an existing individual or general wastewater discharge permit under section 70-90(4). (c) No industrial user shall implement the planned changed conditions(s) until and unless the manager has responded to the industrial user's notice. (d) For purposes of this requirement, flows in excess of the limitations set forth in the SIU's individual or general industrial wastewater discharge permit and/or the discharge of any previously unreported pollutants shall be deemed significant changes. (6) Reports of potential problems. (a) In the case of any discharge including but not limited to accidental discharges; discharges of a non-routine, episodic nature; a non-customary batch discharge; or a slug load which may cause potential problems for the POTW (including a violation of the prohibited discharge standards in section 70-87(1)(a) and (b)), it is the responsibility of the industrial user to immediately telephone and notify the manager of the incident. This notification shall include the location of discharge, type of waste, concentration, and volume, if known, and corrective actions taken by the industrial user. (b) Within five days following such discharge, the industrial user shall, unless waived by the manager submit a detailed written report describing the cause(s) of the discharge and the measures to be taken by the industrial user to prevent similar future occurrences. Such notification shall not relieve the industrial user of any expense, loss, damage, or other liability which may be incurred as a result of damage to the POTW, natural resources, or any other damage to person or property; nor shall such notification relieve the industrial user of any fines, civil penalties, or other liability which may be imposed by this division. (c) Failure to notify the manager in accordance with the provisions of subsection (a) above shall be deemed a separate violation of this division. (d) SIUs are required to notify the manager immediately of any changes at its facility affecting potential for a slug discharge. (e) A notice shall be permanently posted on the industrial user's bulletin board or other prominent place, advising employees whom to call in the event of a discharge described in subsection (a) above. Employers shall ensure that all employees who may cause or suffer such a discharge to occur are advised of the emergency notification procedure. (7) Reports from unpermitted industrial users. All industrial users not required to obtain an individual or general wastewater discharge permit shall provide appropriate reports to the manager as may be required by the manager. (8) Notice of violation/repeat sampling and reporting. If sampling performed by an industrial user indicates a violation, the industrial user must notify the manager within 24 hours of becoming aware of the violation. The industrial user shall also repeat the sampling and analysis and submit the results of the repeat analysis to CWL within 30 days after becoming aware of the violation. Where CWL performs compliance monitoring in lieu of the IU, CWL will perform the repeat sampling and analysis unless CWL notifies the user of the violation and requires the user to perform the repeat analysis. Repeat sampling shall not be required if: (a) CWL performs sampling of the industrial user's wastewater discharge at least once a month; or (b) CWL performs compliance monitoring, which indicates compliance, between the time that the initial sampling was conducted and when the industrial user or CWL receives the results of the initial sampling which indicates a permit violation. (9) Notification of the discharge of hazardous waste. (a) Any industrial user who commences or causes the commencement of the discharge of hazardous waste shall notify the manager, the EPA regional waste management division director, and state hazardous waste authorities in writing of any discharge into the POTW of a substance which, if otherwise disposed of, would be classified as a hazardous waste under 40 CFR Part 261. Such notification must include the name of the hazardous waste (as set forth in 40 CFR Part 261), the EPA hazardous waste number, and the type of discharge (continuous, batch, or other). If the industrial user discharges more than 100 kilograms of such waste per calendar month to the POTW, the notification shall also contain the following information to the extent known and readily available to the industrial user: 1. An identification of the hazardous constituents contained in the wastes; 2. An estimation of the mass and concentration of such constituents in the waste stream discharged during that calendar month; and 3. An estimation of the mass of constituents in the waste stream expected to be discharged during the following 12 months. All notifications must take place no later than 180 days after the discharge commences. Any notification under this paragraph need be submitted only once for each hazardous waste discharged. However, notifications of changed discharges must be submitted pursuant to subsection (5) of this section. The notification requirement in this section does not apply to pollutants already reported under the self-monitoring requirements of subsections (1), (3) and (4) of this section. (b) Industrial users discharging or causing the discharge of hazardous waste are exempt from the requirements of paragraph (a) of this subsection (9) during any calendar month in which they discharge no more than 15 kilograms of hazardous wastes, unless the wastes are acute hazardous wastes as specified in 40 CFR 261.30(d) and 261.33(e). Discharge of more than 15 kilograms of non-acute hazardous wastes in a calendar month or of any quantity of acute hazardous wastes as specified in 40 CFR 261.30(d) and 261.33 e), requires a one-time notification. Subsequent months during which the Industrial User discharges more than such quantities of any hazardous waste do not require additional notification. (c) In the case of any new regulations under Section 3001 of RCRA identifying additional characteristics of hazardous waste or listing any additional substance as a hazardous waste, the industrial user must notify the manager, the EPA regional waste management division director, and state hazardous waste authorities of the discharge of such substance within 90 days of the effective date of such regulations. (d) In the case of any notification made under this section, the industrial user shall certify that it has a program in place to reduce the volume and toxicity of hazardous wastes generated to the degree it has determined to be economically practical. (e) This provision does not create a right to discharge any substance not otherwise permitted to be discharged by this division, a permit issued thereunder, or any applicable federal or state law. (10) Analytical requirements. All pollutant analyses, including sampling techniques, to be submitted as part of an individual or general wastewater discharge permit application or report shall be performed in accordance with the techniques prescribed in 40 CFR Part 136 and amendments thereto, unless otherwise specified in an applicable categorical pretreatment standard. If 40 CFR Part 136 does not contain sampling or analytical techniques for the pollutant in question, or where EPA determines that the Part 136 sampling and analytical techniques are inappropriate for the pollutant in question, sampling and analyses shall be performed by using validated analytical methods or any other applicable sampling and analytical procedures, including procedures approved by the manager or approved by the approval authority. (11) Sample collection. Samples collected to satisfy reporting requirements must be based on data obtained through appropriate sampling and analysis performed during the period covered by the report, based on data that is representative of conditions occurring during the reporting period. (a) Except as indicated in subsections (b) and (c) of this subsection (11), the industrial user must collect wastewater samples using 24-hour flow-proportional composite collection techniques. Where time-proportional or grab sampling is authorized by the manager, the samples must be representative of the discharge. Using protocols (including appropriate preservation) specified in 40 CFR Part 136 and appropriate EPA guidance, multiple grab samples collected during a 24-hour period may be composited prior to the analysis as follows: cyanide, total phenol, and sulfide samples may be composited in the laboratory or in the field; volatile organics and FOG samples may be composited in the laboratory. Composite samples for other parameters unaffected by the compositing procedures as documented in approved EPA methodologies may be authorized by CWL, as appropriate. In addition, grab samples may be required to show compliance with instantaneous discharge limits. (b) Samples for FOG; temperature; pH; cyanide; total phenols; sulfides; and volatile organic compounds must be obtained using grab collection techniques. (c) For sampling required in support of baseline monitoring and 90-day compliance reports required by subsections (1) and (3) of this section (40 CFR 403.12(b) and (d)), a minimum of four grab samples must be used for pH; cyanide; total phenols; FOG; sulfides; and volatile organic compounds for facilities for which historical sampling data does not exist. For facilities for which historical sampling data is available, the manager may authorize a lower minimum of grab samples. For sampling required in support of periodic or continued compliance reports and reports from IUs not subject to categorical pretreatment standards, as required by subsections (4) and (7) of this section (40 CFR 403.12(e) and (h)), the IU shall be required by the manager to collect the number of grab samples necessary to assess and assure compliance with applicable pretreatment standards and requirements. (12) Date of receipt of reports. Written reports will be deemed to have been submitted on the date post-marked. For reports that are not mailed, postage prepaid, into a mail facility serviced by the U.S. Postal Service, the date of submission shall be deemed the date of receipt of the report by the manager. (13) Recordkeeping. Industrial users subject to the reporting requirements of this division shall retain and make available for inspection and copying, all records and information required to be retained under this division, including that obtained pursuant to any monitoring activities required by this division, any additional records of information obtained pursuant to monitoring activities undertaken by the user independent of such requirements, and documentation associated with BMPs established under section 70-87(3). Records shall include the date, exact place, method, and time of sampling; the name of the person(s) taking the samples; the dates analyses were performed; the names of the person(s) performing the analyses; the analytical techniques or methods used; and the results of such analyses. These records shall remain available for a period of at least three years. This period shall be automatically extended for the duration of any enforcement action concerning compliance with this division or where the industrial user has been specifically notified of a longer retention period by the manager. (14) Certification statements. (a) Certification of permit applications and user reports. The following certification statement is required to be signed and submitted by users submitting permit applications in accordance with section 70-89(6); users submitting baseline monitoring reports under subsection (1)(b)8. of this section; users submitting reports on compliance with the categorical pretreatment standard deadlines under subsection (3) of this section; and users submitting periodic compliance reports required by subsection (4)(a)—(d) of this section. The following certification statement must be signed by an authorized representative of the industrial user as defined in section 70-85(4): "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." (15) Exceptions to reporting requirements. Where the POTW performs the required sampling and analysis in lieu of the industrial user, the user may not be required to submit the compliance certification required in subsection (1)(b)7. and subsection (3) of this section. In addition, where the POTW itself collects all the information required for the report, including flow data, the industrial user may not be required to submit the report required in subsections (1), (3) and (4) of this section.

(Ord. No. 12:009, § 2, 3-20-2012)

Ask a question about Jonesboro law

Corpus searches the Jonesboro sections it holds and shows the ones that match, with their citations. Free, no sign-in.