§ 24-13 — Affirmative defenses to violations
Municipal Code of the City of Avondale, Arizona (Codified through Ordinance No. 2021-0726, adopted July 6, 2026 (Supp. No. 38, Update 1)) · Avondale Municipal Code § 24-13
Corpus is an independent public-information project, not the official City of Avondale website. Stable reference: corpuslaw.us/code/2da800ba-9070-417b-aafb-3cde9927edef
24-13 - Affirmative defenses to violations.
(a) Upset. (1) For the purpose of this section, "upset" means an exceptional incident in which there is unintentional and temporary noncompliance with this article because of factors beyond the reasonable control of the customer. An upset does not include noncompliance to the extent caused by operational error, lack of preventive maintenance, or careless or improper operation. (2) An upset shall constitute an affirmative defense to an action brought for noncompliance with applicable cross-connection standards if the requirements of subsection (3) below are met. (3) A customer who wishes to establish the affirmative defense of upset shall demonstrate, through properly signed, contemporaneous operating logs, or other relevant evidence that: (A) An upset occurred and the customer can identify the cause(s) of the upset; (B) The facility was at the time being operated in a prudent and workman-like manner and in accordance with applicable operation and maintenance procedures; and (C) The customer has submitted the following information to the city within twenty-four (24) hours of becoming aware of the upset (if this information is provided orally, a written submission must be provided within five (5) days): (i) A description of the indirect connection and cause of noncompliance; (ii) The period of noncompliance, including exact dates and times or, if not corrected, the anticipated time the noncompliance is expected to continue; and (iii) Steps being taken and/or planned to reduce, eliminate, and prevent recurrence of the noncompliance. (4) In any enforcement proceeding, the customer seeking to establish the occurrence of an upset shall have the burden of proof. (5) A customer shall have the opportunity for a judicial determination on any claim of upset only in an enforcement action brought for noncompliance with cross-connection standards. (6) The customer shall control connections to the extent necessary to maintain compliance with cross-connection standards upon reduction, loss, or failure of its backflow prevention method until the backflow prevention method is restored or an alternative method of protection is provided. This requirement applies in the situation where, among other things, the primary source to the potable water facility is reduced, lost, or fails. (b) Bypass. (1) For the purposes of this section, "severe property damage" means substantial physical damage to property, damage to the potable water facilities that causes them to become inoperable, or substantial and permanent loss of natural resources that can reasonably be expected to occur in the presence of a bypass. (2) Bypass is prohibited unless: (A) The bypass was unavoidable to prevent loss of life, personal injury, or severe property damage. (B) There were no feasible alternatives to the bypass, such as the use of auxiliary equipment, or maintenance during normal periods of equipment downtime. This condition is not satisfied if adequate back-up equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass which occurred during normal periods of equipment downtime or preventive maintenance. (Ord. No. 1572-315, § 2, 3-16-15)
Ask a question about Avondale law
Corpus searches the Avondale sections it holds and shows the ones that match, with their citations. Free, no sign-in.
