§ 33-1062 — Best management practice (BMP) implementation
Code of Ordinances, City of Escondido, California (Code 2026-09-30: eCode360 publication current through the 2026-09-30 codification (imported 2026-11-21)) · Escondido Zoning Code § 33-1062
Corpus is an independent public-information project, not the official City of Escondido website. Stable reference: corpuslaw.us/code/cd6b27e7-8196-4608-a47c-2939d8bc4a0b
§ 33-1062: Best management practice (BMP) implementation.
All construction projects are subject to implementation of best management practices as stated in the City of Escondido stormwater management requirements and the following: (a) Temporary Erosion Control System. (1) All construction projects involving site grading shall include erosion control plans prepared by a registered civil engineer and approved by the city engineer. (2) Prior to issuance of grading permit, or issuance of building permit for projects that do not require grading permit, a refundable cash security shall be posted to pay for the costs incurred by the city for cleanup or damage caused by erosion resulting from project construction. Amount of cash security shall be 10% of the total estimated cost of grading work, a minimum $5,000 and maximum $30,000. However, for the development of a single-family residence that does not require a grading permit, this cash security shall be in the amount of $2,000. (3) Temporary and permanent erosion control devices, in accordance with the stormwater management requirements, shall be provided to control erosion at all times. (4) All public rights-of-way, including, but not limited to, paved streets, sidewalks, and parkway areas shall be maintained free of loose soil, mud, construction debris, and trash at all times. (5) Graded building pads shall be provided with on-site erosion control system designed by a registered civil engineer and approved by the city engineer. (6) The project owner shall provide sufficient equipment and qualified personnel to conduct emergency erosion control methods at all times. A 24 hour emergency contact person and telephone number shall be provided to the city engineer or his authorized representative. (b) Temporary erosion control system maintenance. (1) The project owner shall be responsible for continual maintenance and inspection of the erosion control system. In the event of failure or refusal by the project owner to properly maintain the system, the city engineer may cause emergency maintenance work to be done to protect public and private property. The cost shall be charged to the property owner. (2) In the event that the city engineer must authorize emergency maintenance work to be done, he may revoke the grading permit by written notice to the property owner. The permit shall not be reissued until the erosion control system is reviewed and any necessary revisions as approved by the city engineer. Also, if the cash security for grading, cleanup and emergency work is drawn upon, the amount used for the emergency work by the city contractor shall be replaced prior to re-issuance of the grading permit. (c) Permanent erosion protection. The following requirements shall be installed prior to final inspection: (1) All manufactured slopes less than three feet in vertical height, or existing slopes stripped of vegetation shall be landscaped with suitable ground cover or installed with an erosion control system to the satisfaction of the director. (2) All manufactured slopes over three feet in vertical height shall be landscaped with ground covers, shrubs and trees and shall be provided, with permanent irrigation system, to the satisfaction of the director. (3) Failure to maintain slope planting in a satisfactory condition may cause the slopes to be replanted by the city or its contractor and the cost assessed to the owner. (d) All construction projects shall employ the following general site best management practices (BMPs) to the maximum extent practicable: (1) Minimizing areas that are cleared and graded to only the portion of the site that is necessary for construction; (2) Minimizing exposure time of disturbed soil areas; (3) Minimizing grading during the wet season and correlation of grading with seasonal dry weather to the extent feasible; (4) Limiting grading to a maximum disturbed area as specified in the storm water management plan before either temporary or permanent erosion controls are implemented to prevent storm water pollution; (5) Temporarily stabilizing and reseeding disturbed soil areas as rapidly as feasible; (6) Preserving natural hydrologic features where feasible; (7) Preserving riparian buffers and corridors where feasible; (8) Maintaining all BMPs, until removed; and (9) Retaining, reducing and properly managing all pollutant discharges on site to the maximum extent practical. (e) All construction sites shall employ the following erosion and sediment controls to the maximum extend practicable: (1) Installing erosion prevention BMPs as the most important measure for keeping sediment on site during construction, but never as the single method; (2) Installing sediment controls as a supplement to erosion prevention for keeping sediment on site during construction; (3) Stabilizing all inactive slopes during the rainy season and during rain events in the dry season; (4) Stabilizing all active slopes during rain events regardless of the season; and (5) Permanently revegetating or landscaping as early as feasible. (f) Advanced treatment for sediment (e.g., flocculation, chemical treatment) shall be used at construction sites determined to be a high threat to water quality based on the following factors and specifications: (1) Soil erosion potential or soil type; (2) The site's slopes; (3) Project size and type; (4) Proximity to receiving water bodies; (5) Non-storm water discharges; (6) Ineffectiveness of other BMPs; and (7) Any other relevant factors.
( Ord. No. 2001-21 , § 5, 8-22-01 ; Ord. No. 2008-08 , § 4, 2-27-08 )
Ask a question about Escondido law
Corpus searches the Escondido sections it holds and shows the ones that match, with their citations. Free, no sign-in.
