For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 33-1067.B — Additional submittal requirements in HRO district

Code of Ordinances, City of Escondido, California (Code 2026-09-30: eCode360 publication current through the 2026-09-30 codification (imported 2026-11-21)) · Escondido Zoning Code § 33-1067.B

Corpus is an independent public-information project, not the official City of Escondido website. Stable reference: corpuslaw.us/code/8ceee1f6-74c6-498a-874f-2069c9212ba3

§ 33-1067.B: Additional submittal requirements in HRO district.

In addition to other requirements of this article, applications for developments in the hillside and ridgeline protection overlay shall include the following for the subject site and any off-site improvements: (a) If any portion of a property is within the hillside and ridgeline overlay district, the following shall be submitted for the entire property: (1) Slope analysis of the natural topographic features showing the following slope categories and the acreage/square footage for each slope category: For all projects except single-family homes on existing lots: 0-15 percent 15-25 percent 25-35 percent 35 percent and over For single-family homes on existing lots: 0-35 percent 35 percent and over The slope analysis shall generally be prepared at a scale no smaller than one inch equals two hundred feet (1″ = 200′) utilizing contour intervals of no more than 10 feet. Exceptions may be granted by the director based on the size and slope of the property. Small isolated areas of slope over 35% will be reviewed by the director for their development potential. (2) An overlay of the slope analysis and the proposed development indicating the location of proposed pads, structures, streets, driveways, retaining walls, and any other site improvements, and all proposed grading including cut and fill lines and maximum slope heights and gradients. (b) The following information shall be submitted for each property or portion of a property within the hillside and ridgeline overlay district: (1) Location of significant geological features, including bluffs, ridgelines, cliffs, canyons, rock outcroppings, stream courses, and other significant natural features specified in the open space element of the general plan, including the exact location of any skyline and intermediate ridge identified on the hillside and ridgeline overlay map on file with the Escondido planning division; (2) Location of all existing mature and/or protected trees as defined in section 1052 of this article, and other significant biological features, or sensitive species or habitats, indicating retention, relocation, or removal; (3) Location, dimension, cross sections, building materials and top/bottom elevations of any proposed retaining, crib and stem walls and fences. (c) Upon initial review of the proposed project, visual analysis may be required to include panoramic photographs, cross sections, and/or any other material to demonstrate the visual impact of the development if any development or grading is proposed within 200 feet horizontal or fifty feet (50) vertical, whichever is more restrictive, of a skyline and/or intermediate ridge, and the proposed development can potentially conflict with the applicable design guidelines outlined in section 33-1067.F. (d) For all single-family homes on existing lots, building and grading plans shall be submitted at the same time. (e) Any additional or other specific information determined by the director to be relevant to the applicant's proposal.

( Ord. No. 2001-21 , § 5, 8-22-01 )

Ask a question about Escondido law

Corpus searches the Escondido sections it holds and shows the ones that match, with their citations. Free, no sign-in.