§ 33-1063: Grading inspection.

(a) General. All grading operations for which a permit is required shall be subject to inspection by the city engineer. When required by the city engineer, special inspection of grading operations and special testing shall be performed in accordance with the provisions of Section 108 of the Uniform Building Code and subsection (b) of this section. (b) Grading requirements. It shall be the responsibility of the project civil engineer to incorporate all recommendations from the soils engineering and engineering geology reports and applicable state issued stormwater discharge permit requirements into the grading plan. The project civil engineer shall act as the coordinating agent in the event the need arises for liaison between the other professionals, the contractor and the city engineer. The civil engineer also shall be responsible for the preparation of revised plans and the submission of record grading plans upon completion of the work. The grading contractor shall submit, in a form prescribed by the city engineer, a statement of compliance to said record plan. Soils engineering and engineering geology reports shall be required as specified in section 33-1055 of this article. During grading all necessary reports, compaction data and soil engineering and engineering geology recommendations shall be submitted to the civil engineer and the city engineer by the soils engineer and the engineering geologist. The soils engineer's area of responsibility shall include, but need not be limited to, the professional inspection and approval concerning the preparation of ground to receive fills, testing for required compaction, stability of all finish slopes and the design of buttress fills, where required, incorporating data supplied by the engineering geologist. The engineering geologist's area of responsibility shall include, but need not be limited to, professional inspection and approval of the adequacy of natural ground for receiving fills and the stability of cut slopes with respect to geological matters and the need for subdrains or other groundwater drainage devices. He shall report his findings to the soils engineer and the civil engineer for engineering analysis. The city engineer shall inspect the project at the various stages of the work requiring approval and at any more frequent intervals necessary to determine that adequate control is being exercised by the professional consultants. (c) Notification of noncompliance. If, in the course of fulfilling his responsibility under this chapter, the civil engineer, the soils engineer, the engineering geologist or the testing agency finds that the work is not being done in conformance with this chapter or the approved grading plans, the discrepancies shall be reported immediately in writing to the person in charge of the grading work and to the city engineer. Recommendations for corrective measures, if necessary, shall be submitted. (d) Transfer of responsibility for approval. If the civil engineer, the soils engineer, the engineering geologist or the testing agency of record is changed during the course of the work, the work shall be stopped until the replacement has agreed to accept the responsibility within the area of his technical competence for approval upon completion of the work.

( Ord. No. 2001-21 , § 5, 8-22-01 )

Ask a question about Escondido law

Corpus searches the Escondido sections it holds and shows the ones that match, with their citations. Free, no sign-in.