For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 33-1064 — Completion of work

Code of Ordinances, City of Escondido, California (Code 2026-09-30: eCode360 publication current through the 2026-09-30 codification (imported 2026-11-21)) · Escondido Zoning Code § 33-1064

Corpus is an independent public-information project, not the official City of Escondido website. Stable reference: corpuslaw.us/code/1cf25737-cfad-431a-b1ff-85cb744a6970

§ 33-1064: Completion of work.

(a) Final reports. Upon completion of the rough grading work, and at the final completion of the work, the city engineer may require the following reports and drawings and supplements thereto: (1) A record grading plan prepared by the civil engineer including original ground surface elevations, as-graded ground surface elevations, lot drainage patterns and locations and elevations of all surface and subsurface drainage facilities. He or she shall provide approval that the work was done in accordance with the final approved grading plan. (2) A soil grading report prepared by the soils engineer including locations and elevations of field density tests, summaries of field and laboratory tests and other substantiating data and comments on any changes made during grading and their effect on the recommendations made in the soils engineering investigation report. He or she shall provide approval as to the adequacy of the site for the intended use. (3) A geologic grading report prepared by the engineering geologist including a final description of the geology of the site including any new information disclosed during the grading and the effect of same on recommendations incorporated in the approved grading plan. He or she shall provide approval as to the adequacy of the site for the intended use as affected by geologic factors. (b) Notification of completion. The permittee or his agent shall notify the city engineer when the grading operation is ready for final inspection. Final approval shall not be given until all work including installation of all drainage facilities and their protective devices and all erosion-control measures have been completed in accordance with the final approved grading plan, the required reports, and the record grading plan have been submitted.

( Ord. No. 2001-21 , § 5, 8-22-01 )

Ask a question about Escondido law

Corpus searches the Escondido sections it holds and shows the ones that match, with their citations. Free, no sign-in.