§ 25.240: Permits required.
No person shall do any grading without first having obtained a grading permit from the city engineer except for the following: 1. An excavation below finished grade for basements and footing of a building, retaining wall or other structure authorized by a valid building permit. This shall not exempt any fill made with the material from such excavation nor exempt any excavation having an unsupported height greater than 5 feet after the completion of such structure. 2. Cemetery graves. 3. Refuse disposal sites controlled by other regulations. 4. Excavations for wells or tunnels or utilities. 5. Mining, quarrying, excavating, processing, stockpiling of rock, sand, gravel, aggregate or clay where established and provided for by law provided such operations do not affect the lateral support or increase the stresses in or pressure upon any adjacent or continguous property. 6. Exploratory excavations under the direction of soil engineers or engineering geologists. 7. An excavation which (a) is less than two (2) feet in depth, or (b) which does not create a cut slope greater than five (5) feet in height and steeper than one and one-half horizontal to one vertical. 8. A fill less than one (1) foot in depth, and placed on natural terrain with a slope flatter than five horizontal to one vertical, or less than three (3) in depth, not intended to support structures and does not obstruct a drainage course. 9. For excavation and removal of any earth material to an off site location which involves the hauling of earth material in excess of 50,000 cubic yards, the grading permit process shall include review by the Fairfield planning commission for compliance with the general plan, specific plan, or area wide plan, before issuance by the city engineer.
( Ord. No. 86-14 , § 1 )
Ask a question about Fairfield law
Corpus searches the Fairfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.