§ 25.250 — Runoff Control
City Code, City of Fairfield, California (Fairfield City Code includes legislation through 07-21-2026 (eCode360 publication FA4438, scraped 2026-11-21)) · Fairfield City Code § 25.250
Corpus is an independent public-information project, not the official City of Fairfield website. Stable reference: corpuslaw.us/code/0a3e123b-a1f3-4b56-93fb-fa486d657da8
§ 25.250: Runoff Control.
The city engineer may require a surface water runoff control plan. The runoff control plan shall calculate runoff from the site under natural conditions, and shall estimate runoff after development using city drainage design standards. The runoff control plan shall demonstrate that such peak runoff from the site will not increase after development, and shall include all necessary measures to ensure this result to the satisfaction of the city engineer.
( Ord. No. 80-31 , § 3 )
Ask a question about Fairfield law
Corpus searches the Fairfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.
