For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 25.242 — Definitions

City Code, City of Fairfield, California (Fairfield City Code includes legislation through 07-21-2026 (eCode360 publication FA4438, scraped 2026-11-21)) · Fairfield City Code § 25.242

Corpus is an independent public-information project, not the official City of Fairfield website. Stable reference: corpuslaw.us/code/9893ff11-d80c-433d-8403-7f28893bd40b

§ 25.242: Definitions.

For the purpose of this section, the definitions listed hereunder shall be construed as specified as follows: AS-GRADED is the surface conditions extent on completion of grading. BEDROCK is in-place, solid rock. BENCH is a relatively level step excavated into earth material on which fill is to be placed. BORROW is earth material acquired from an off-site location for use in grading on a site. CERTIFICATION shall mean a written engineering or geological opinion concerning the progress and completion of the work. CITY ENGINEER shall mean the city engineer of the City of Fairfield. CIVIL ENGINEER shall mean a professional engineer registered in the state to practice in the field of civil works. CIVIL ENGINEERING shall mean the application of the knowledge of forces of nature, principles of mechanics and the properties of materials to the evaluation, design and construction of civil works for the beneficial uses of mankind. COMPACTION is the densification of a fill by mechanical means. EARTH MATERIAL is any rock, natural soil or fill and/or any combination thereof. ENGINEERING GEOLOGIST shall mean a geologist experienced and knowledgeable in engineering geology. ENGINEERING GEOLOGY shall mean the application of geologic knowledge and principles in the investigation and evaluation of naturally occurring rock and soil for use in the design of civil works. EROSION is the wearing away of the ground surface as a result of the movement of wind, water and/or ice. EXCAVATION is the mechanical removal of earth material. FILL is a deposit of earth material placed by artificial means. GRADE shall mean the vertical location of the ground surface. EXISTING GRADE is the grade prior to grading. ROUGH GRADE is the stage at which the grade approximately conforms to the approved plan. FINISH GRADE is the final grade of the site which conforms to the approved plan. GRADING is any excavating or filling or combination thereof. KEY is a designed compacted fill placed in a trench excavated in earth material beneath the toe of a proposed fill slope. SITE is any lot or parcel of land or contiguous combination thereof, under the same ownership, where grading is performed or permitted. SLOPE is an inclined ground surface the inclination of which is expressed as a ratio of horizontal distance to vertical distance. SOIL is naturally occurring surficial deposits, overlaying bedrock. SOIL ENGINEER shall mean a civil engineer experienced and knowledgeable in the practice of soil engineering. SOIL ENGINEERING shall mean the application of the principles of soil mechanics in the investigation, evaluation and design of civil works involving the use of earth materials and the inspection and testing of the construction thereof. TERRACE is a relatively level step constructed in the face of a graded slope surface for drainage and maintenance purposes.

Ask a question about Fairfield law

Corpus searches the Fairfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.