§ 25.249 — Completion of work
City Code, City of Fairfield, California (Fairfield City Code includes legislation through 07-21-2026 (eCode360 publication FA4438, scraped 2026-11-21)) · Fairfield City Code § 25.249
Corpus is an independent public-information project, not the official City of Fairfield website. Stable reference: corpuslaw.us/code/e6b535c9-aa66-4d0a-a71d-c29418b4cc70
§ 25.249: Completion of work.
(a) Final reports. Upon completion of the rough grading work and at the final completion of the work, the city engineer may require the following reports and drawings and supplements thereto: (1) An as-graded grading plan prepared by the civil engineer, including original ground surface elevations, as-graded ground surface elevations, lot drainage patterns and locations and elevations of all surface and subsurface drainage facilities. The civil engineer shall provide certification that the work was done in accordance with the final approved grading plan. (2) A soil grading report prepared by the soil engineer including locations and elevations of field density tests, summaries of field and laboratory tests and other substantiating data and comments on any changes made during grading, and their effect on the recommendations made in the soil engineering investigation report. The soil engineer shall provide certification as to the adequacy of the site for the intended use. (3) A geologic grading report prepared by the engineering geologist including a final description of the geology of the site, including any new information disclosed during the grading and the effect of same on recommendations incorporated in the approved grading plan. The engineering geologist shall provide certification as to the adequacy of the site for the intended use as affected by geologic factors. (b) Notification of completion. The permittee or the permittee’s agent shall notify the city engineer when the grading operation is ready for final inspection. Final approval shall not be given until all work including installation of all drainage facilities and their protective devices and all erosion control measures have been completed in accordance with the final approved grading plan and the required reports have been submitted.
Ask a question about Fairfield law
Corpus searches the Fairfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.