Chapter 18.205 — GRADING, EROSION AND SEDIMENT CONTROL
Fremont Municipal Code (Fremont Municipal Code current through Ordinance 02-2026 passed May 5, 2026 (Code Publishing Company, codepublishing.com, scraped 2026-11-18)), Fremont, CA · 41 sections. Independent public-information project, not the official City of Fremont website.
- § 18.205.010 — Purpose and intent of chapter
- § 18.205.020 — Definitions
- § 18.205.030 — Permits – When required – Exceptions
- § 18.205.040 — Permits – Application, generally
- § 18.205.050 — Permit applications – Plans and specifications
- § 18.205.060 — Additional engineering reports may be required
- § 18.205.070 — Fees
- § 18.205.080 — Permit applications – Referral to other public agencies and public utilities
- § 18.205.090 — Reserved
- § 18.205.100 — Findings
- § 18.205.110 — Landscape plan – When required – Content
- § 18.205.120 — Permits – Issuance or denial
- § 18.205.130 — Permits – Issuance with conditions
- § 18.205.140 — Permits – Designation of routes
- § 18.205.150 — Permits – Time limits and conformance to terms
- § 18.205.160 — Permits – Include conditions as to safety and drainage precautions
- § 18.205.170 — Permits – Effective date – Waiver of appeal rights
- § 18.205.180 — Permit issuance – Effect in general
- § 18.205.190 — Performance bonds
- § 18.205.200 — Liability insurance
- § 18.205.210 — Transferability
- § 18.205.220 — Permits – Modification after issuance
- § 18.205.230 — Revocation or suspension of permits
- § 18.205.240 — Variation of existing conditions – Stop orders
- § 18.205.250 — Additional safety precautions may be required
- § 18.205.260 — Notice to correct condition constituting hazard – Summary abatement
- § 18.205.270 — Inspections by city engineer
- § 18.205.280 — Conduct of operations – Protection of adjacent and other property
- § 18.205.290 — Grading operations – Inspection and supervision
- § 18.205.300 — Deposits of material – Where prohibited – Action by city
- § 18.205.310 — Design standards – Excavations
- § 18.205.320 — Design standards – Fills
- § 18.205.330 — Design standards – Slope control
- § 18.205.340 — Design standard – Setbacks
- § 18.205.350 — Design standards – Drainage
- § 18.205.360 — Completion of grading – Report
- § 18.205.370 — Maintenance of protective measures
- § 18.205.380 — Destruction of natural ground cover
- § 18.205.390 — Exceptions from provisions of chapter
- § 18.205.400 — Effective date – Appeals
- § 18.205.410 — Time limits, expiration and revocation of grading permits
