18.205.290 Grading operations – Inspection and supervision.

(a) Supervised Grading – When Required. All grading involving more than 5,000 cubic yards of material shall be performed under the supervision of a registered civil engineer and shall be designated “supervised grading.” Grading not supervised according to this section shall be designated “regular grading.” For grading involving 5,000 cubic yards of material or less, the permittee may request to have the grading performed as either supervised grading or regular grading. However, the city engineer shall make the final determination if grading less than 5,000 cubic yards is to be performed as “regular grading” or “supervised grading.” (b) Regular Grading Requirements. In cases of regular grading, the city engineer will inspect the work, and may require adequate inspection and compaction control by a soils testing agency. The soils testing agency will be approved by the city engineer. Periodic reports certifying the compaction or acceptability of all fills may be required for all grading for which a permit is required under this chapter. These reports shall include but need not be limited to statements relative to the following: inspection of cleared areas and benches prepared to receive fill, and removal of all soil and unsuitable materials; the placement and compaction of fill materials; the bearing capacity of the fill to support structures; and the inspection or review of the construction of retaining walls, subdrains, drainage devices, buttress fills, and other similar measures. The city engineer may require sufficient inspection to assure that all geologic conditions have been considered adequately. Where geologic conditions warrant, the city engineer may require periodic geologic reports. Inspection reports as aforesaid also may be required by the city engineer to include other information deemed necessary, such as statements concerning inspection of cut slopes, canyons during clearing operations for groundwater and earth material conditions; benches prior to placement of fill; and possible spring locations. (c) Supervised Grading Requirements. In supervised grading, it shall be the responsibility of the registered civil engineer to supervise and coordinate all site inspections and testing during grading operations. Soils and geology reports also shall be required as specified in subsection (b) of this section. All necessary reports, compaction data, and soils engineering and engineering geological recommendations shall be submitted to the city engineer by the supervising registered civil engineer. (d) Notification of Noncompliance. If in the course of fulfilling their responsibilities under this chapter the supervising registered civil engineers find that work is not being done in conformance with this chapter or the permit conditions and approved grading plans, or in accordance with accepted practices, they shall notify persons in charge of the grading work and the city engineer in writing, immediately, of nonconformities and of corrective measures to be taken. (Ord. 9-2014 § 29, 3-4-14.)

Ask a question about Fremont law

Corpus searches the Fremont sections it holds and shows the ones that match, with their citations. Free, no sign-in.