§ 18.205.020 — Definitions
Fremont Municipal Code (Fremont Municipal Code current through Ordinance 02-2026 passed May 5, 2026 (Code Publishing Company, codepublishing.com, scraped 2026-11-18)) · Fremont Municipal Code § 18.205.020
Corpus is an independent public-information project, not the official City of Fremont website. Stable reference: corpuslaw.us/code/7bddf070-7e49-400d-9826-eea415a10d65
18.205.020 Definitions.
(a) For the purposes of this chapter, unless it is plainly evident from the context that a different meaning is intended, certain terms used herein are defined as follows: “Agricultural grading” shall mean cultivation of the soil for producing crops and raising livestock, including the discing or furrowing of soil. “Best management practice (BMP)” shall mean a technique or series of techniques which, when utilized in a designated manner, is proven to be effective in controlling construction-related runoff erosion and sedimentation. “City engineer” shall mean the city engineer of the city of Fremont. “Clearing” shall mean any human activity involving removal of one or more of the following: natural vegetation, including trees, stumps, shrubs and grasses; topsoil or top six inches of soil, whichever is shallower. “Drainageway” shall mean a natural or manmade channel which collects and intermittently or continuously conveys storm water runoff. “Enforcement officer” shall mean the city manager, the officer named in Section 1.15.050(b)(8)(B) (power of arrest), Chapter 1.15 (Penalty Provisions) and/or any other persons designated by the city manager to administer and enforce the provisions of this chapter. “Engineering geologist” shall mean a registered geologist certified as an engineering geologist by the state of California. “Engineering geology” shall mean the application of geological data and principles to engineering problems dealing with naturally occurring rock and soil to assure that geological factors are recognized and adequately interpreted in engineering practice. “Erosion” shall mean the wearing away and transporting of earth material as a result of the movement of wind or water. “Excavation” shall mean any act by which earth, sand, gravel, rock or any similar material is cut into, dug, quarried, uncovered, removed, displaced, relocated or bulldozed; and shall include the conditions resulting therefrom. “Fill” shall mean any human act by which earth, sand, gravel, rock or any other similar material is deposited, placed, pushed, pulled or transported; and shall include the conditions resulting therefrom. “Final erosion and sediment control plan (final plan)” shall mean a set of best management practices or equivalent measures designed to control surface runoff and erosion, and to retain sediment on a particular site after all other planned final structures and permanent improvements have been erected or installed. “Finished grade” shall mean the final grade or elevation of a site or portion thereof after grading. “Grading” shall mean excavation, fill or any combination thereof; and shall include the conditions resulting from any excavation or fill. “Interim erosion and sediment control plan (interim plan)” shall mean a set of best management practices or equivalent measures designed to control surface runoff and erosion, and to retain sediment on a particular site(s) during the period in which preconstruction and construction-related land disturbances, fills and soil storage occur, but before final improvements are completed. “Licensed landscape architect” shall mean a person licensed to practice landscape architecture by the state of California. “Natural slope” shall mean the predominant slope or slopes of land in their natural condition, disregarding minor surface humps or hollows. “Natural terrain” shall mean the natural contour of a site before manmade development. “Permittee” shall mean any person or group of persons acquiring a permit for grading. “Quarry” shall mean any site or parcel of land used for obtaining, extracting or producing earth, rock, crushed stone, building stone, slate, limestone or similar material products for any commercial purpose. “Rainy season” shall mean the period of the year during which there is a substantial risk of rainfall. For the purpose of this chapter, the rainy season is defined as from October 15th to April 15th, inclusive. “Registered civil engineer” shall mean a person licensed by the state of California to practice engineering. “Sediment” shall mean earth material deposited by water or wind. “Site” shall mean a lot, parcel of land or contiguous combination thereof where grading is being or will be performed or permitted. “Slope” shall mean an inclined ground surface, the inclination of which is expressed as a ratio of horizontal distance to vertical distance. “Slope control area” shall mean an area established to achieve the continuous stabilization of slopes, which otherwise might seriously affect properties. The area is to be defined on plans and specifications and in agreements running with the land. The continuous stabilization is to be achieved by slope control drainageways, slope control planting and other necessary initial work, and by continuing land use limitations and maintenance provisions designed to preserve and maintain the slope control measures taken for the benefit of the properties. “Slope control easement” shall mean a legally established easement granting to the land developer or builder, a local public authority, or a property owners’ association, the right of access to and over a slope control area for slope control purposes. “Soil” shall mean earth material of whatever origin that overlies bedrock. “Soil engineer” shall mean a registered civil engineer licensed by the state of California who is experienced and knowledgeable in the practice of soils engineering. “Soils engineering” shall mean the application of the principles of soil mechanics in the investigation, evaluation and design of civil works involving the use of earth materials and the inspection and testing of the construction thereof. “Storm runoff contributing slope” shall mean any natural or manufactured slope from which storm waters run off in such a manner that water may drain against a building or structure unless otherwise intercepted. “Watercourse” shall mean any channel, either flowing continuously or intermittently, in a consistent, definite direction and location; or one used for the holding, delay or storage of waters that functions at any time to convey or store storm water runoff. “Wetlands” shall mean lands conforming to the definition of wetlands as prescribed by the federal government and so designated by the Corps of Engineers. (b) Certain other terms used in this chapter are specifically defined in Title 17 and the remainder of Title 18; and unless it is plainly evident from the context of any provisions of this chapter that a different meaning is intended, the definitions of terms contained in such Titles 17 and 18 are incorporated herein by reference. (Ord. 9-2014 § 29, 3-4-14.)
Ask a question about Fremont law
Corpus searches the Fremont sections it holds and shows the ones that match, with their citations. Free, no sign-in.
