§ 811.1.5 — General requirements
Municipal Code, City of Torrance, California · Torrance Municipal Code § 811.1.5
Corpus is an independent public-information project, not the official City of Torrance website. Stable reference: corpuslaw.us/code/45d4033b-6839-42ae-a5d2-ee06969033a5
§ 811.1.5: General requirements.
The owner of each building within the scope of this chapter shall cause a structural analysis to be made of the building by a civil or structural engineer or architect licensed by the State of California, and if the building does not meet the minimum earthquake standards specified in this chapter, the owner shall cause it to be structurally altered to conform to such standards or cause the building to be demolished. The owner of a building within the scope of this chapter shall comply with the requirements set forth above by submitting to the city for review within the stated time limits: a) | Within two hundred seventy (270) days after the service of the order, a structural analysis. Such analysis, which is subject to approval by the city, shall demonstrate that the building meets the minimum requirements of this chapter, or b) | Within two hundred seventy (270) days after the service of the order, a structural analysis and plans for the proposed structural alterations of the building necessary to comply to the minimum requirements of this chapter, or c) | Within one hundred twenty (120) days after service of the order, plans for the installation of wall anchors in accordance with the requirements specified in Section 811.1.8, or, d) | Within two hundred seventy (270) days after the service of the order, plans for the demolition of the building. After plans are submitted and approved by the city, the owner shall obtain a building permit, commence and complete the required construction or demolition within the time limits set forth in Table No. 11-B below. These time limits shall begin to run from the date the order is served in accordance with Section 811.1.6. Owners electing to comply with Subsection (c) of this section are also required to comply with Subsection (b) or (d) of this section, provided, however, that the two hundred seventy (270) day period provided for in such Subsections (b) and (d) and the time limits for obtaining a building permit, commencing construction and completing construction for complete structural alterations or building demolition set forth in Table No. 11-B below shall be extended in accordance with Table No. 11-C below. Each such extended time limit, except the time limit for commencing construction, shall begin to run from the date the order is served in accordance with Section 811.1.6. The time limit for commencing construction shall run from the date the building permit is issued.
[Amended by Ord. 3279 ]
Ask a question about Torrance law
Corpus searches the Torrance sections it holds and shows the ones that match, with their citations. Free, no sign-in.
