For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 18-124 — IBC - Section 1803.5.3, Expansive soils

Code of Ordinances of the City of Arvada, Colorado (Supp. No. 67: codified through Ordinance No. 4932, enacted May 5, 2026) · Arvada Code of Ordinances § 18-124

Corpus is an independent public-information project, not the official City of Arvada website. Stable reference: corpuslaw.us/code/4829951c-b26e-4d88-a07b-63a7e9f4d48f

Sec. 18-124. - IBC - Section 1803.5.3, Expansive soils.

Section 1803.5.3. Expansive soils, is hereby amended in its entirety to read as follows: "R401.4. Expansive soils. Expansive soils are deemed present throughout most of the city. A soils report and registered design professional stamped foundation plans are required for all new construction. Soils reports shall be prepared by a state registered geotechnical engineer and foundation plans shall be prepared by a state registered professional engineer. The documents must specifically include design computations for pier diameter and length, describe methods to provide restraint from lateral soil pressures, provide a slab performance risk evaluation, compaction, and soil preparation requirements for slab on grade, and other information deemed necessary to the engineer of record. Exceptions: 1. If the existing foundation of an R-3 residential building or an IRC compliant residential building is performing adequately, foundations for additions to such existing buildings are allowed to match the existing foundation type without the need for a soils report as long as one or more of the following exceptions is met: a. An open hole soils investigation by a state licensed geotechnical engineer is provided prior to pouring concrete foundation elements and is evaluated by the design professional of record. b. The Engineer of record may use of the worst case scenario soil bearing capacity is used in the design of the foundation. 2. Decks, patio covers and pergola projections attached to an existing R-3 residential building need not provide a soils report or engineered foundation plans, unless deemed necessary by the code official. 3. Detached accessory structures for R-3 residential Buildings or IRC compliant residential buildings under 600 sf and under 10' eave height that are non-habitable, need not provide a soils report or engineered foundation plans unless deemed necessary by the code official."

(Ord. No. 4921, § 6, 3-24-2026)

Ask a question about Arvada law

Corpus searches the Arvada sections it holds and shows the ones that match, with their citations. Free, no sign-in.