For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 14.21.030 — Permits required

Municipal Code of Lakewood, Colorado (Supp. No. 15: codified through Ordinance No. O-2026-16, adopted April 27, 2026) · Lakewood Municipal Code § 14.21.030

Corpus is an independent public-information project, not the official City of Lakewood website. Stable reference: corpuslaw.us/code/76182ad1-5941-4389-be43-34d69c55d6ff

14.21.030 - Permits required.

A. No person shall do any grading without first having obtained a grading permit from the Planning Director, and Public Works Director except for the following: 1. An excavation below finished grade for basements and footings of a building, retaining wall or other structure authorized by a valid building permit. This shall not except any fill made with the material from such excavation nor exempt any excavation having an unsupported height greater than two feet after the completion of such structure; 2. Cemetery graves; 3. Refuse disposal sites controlled by other regulations; 4. Excavations for wells or tunnels or utilities; 5. Mining, quarrying, excavating, processing, stockpiling of rock, sand, gravel, aggregate or clay where established and provided for by law, providing such operations do not affect the lateral support or increase the stresses in or pressure upon any adjacent or contiguous property; 6. Exploratory excavations under the direction of soils engineers or engineering geologists; 7. An excavation which is (a) less than two feet in depth, or (b) which does not create a cut slope greater than two feet in height and steeper than three horizontal to one vertical; 8. A fill less than one foot in depth and placed on natural terrain with a slope flatter than five horizontal to one vertical; 9. A fill less than three feet in depth, which does not exceed 50 cubic yards on any one lot and does not obstruct a drainage course, and which is not intended to support structures; 10. Street right-of-way construction. B. No person shall do any grading without first having obtained a grading permit from the Planning Director, and Public Works Director. No grading permit will be issued until such time as the Planning Director, and Public Works Director has approved a grading plan which is accompanied by a final site plan for an impending development. Additionally, the Director has the authority to require, prior to issuance of a grading permit, a haul route to be approved by the Director for transporting any excess dirt material. Further, the Director may require that he approve any site within Lakewood where the excess material is to be dumped. A grading plan shall be valid for a period not to exceed six months from the date of approval. An exception to the site plan requirement may be authorized by the Planning Director, and Public Works Director based upon the following circumstances: 1. The proposed grading is in direct response to a drainage problem; or 2. It is clear that the proposed grading is appropriate for the property, and that no adverse impact on adjacent properties will result; or 3. The proposed grading is done to achieve a subgrade or an anticipated street right-of-way and/or drainage structures or outfalls; or 4. The proposed grading is overlot grading of a large single-family or PD zoned area, being done prior to approval of a final plat and final site plan, and only in instances where it is clear that such grading will not impact surrounding areas. In instances where a grading permit is issued prior to approval of a site plan, no building permit will be issued until a site plan (or plot plan in the case of a single-family home or duplex) and final grading plan have been approved by the Director. A grading permit shall be required for an entire filing or each site, and may cover both excavations and fills. Existing excavations or embankments in place prior to the adoption of this ordinance will be exempt from the standards outlined herein. This exception is granted only if the grading was done in accordance with chapter 70 of the Uniform Building Code in effect at the time of grading of the excavation or embankment, and if a grading permit has been issued, and the work performed according to an approved grading plan.

(Ord. O-2019-24 § 4, 2019; Ord. O-94-40 §§ 8, 9, 1994; Ord. O-91-59 § 5 (part), 1991; Ord. O-88-40 § 1 (part), 1988).

Ask a question about Lakewood law

Corpus searches the Lakewood sections it holds and shows the ones that match, with their citations. Free, no sign-in.