14.21.170 - Grading inspection.
A. General. All grading operations for which a permit is required shall be subject to inspection by the Director, if on private property. engineering division personnel shall inspect grading within public right-of-way. When required by the Director, special inspection and testing of grading operations shall be performed in accordance with the provisions of subsection C of this section. B. Grading Designation. All grading in excess of 5,000 cubic yards shall be performed in accordance with the approved grading plan prepared by a civil engineer, and shall be designated as "engineered grading." Grading involving less than 5,000 cubic yards shall be designated "regular grading" unless the permittee, with the approval of the Director, chooses to have the grading performed as "engineering grading." C. Engineering Grading Requirements. For engineered grading, it shall be the responsibility of the civil engineer who prepares the approved grading plan to incorporate all recommendations from the soils engineering and engineering geology reports into the grading plan. He also shall be responsible for the professional inspection and approval of the grading. If required by the Director, a special inspection must be conducted to verify the engineering grading was properly administered. This responsibility shall include, but need not be limited to, inspection and approval as to the establishment or line, grade and drainage of the development area. The civil engineer shall act as the coordinating agent in the event the need arises for liaison between the other professionals, the contractor and the Director. The civil engineer shall also be responsible for the preparation of revised plans and the submission of as-graded grading plans upon completion of the work. The grading contractor shall submit in a form prescribed by the Director a statement of compliance to the as-built plan. Soils engineering and engineering geology reports shall be required as specified in Section 14.21.060. During grading, all necessary reports, compaction data and soil engineering and engineering geology recommendations shall be submitted to the civil engineer and the Director by the soils engineer and the engineering geologist. The soil engineer's area of responsibility shall include, but need not be limited to, the professional inspection and approval of the adequacy of natural ground for receiving fills and the stability of cut slopes with respect to geological matters and the need for subdrains or other groundwater drainage devices. He shall report his findings to the soils engineer and the civil engineer for engineering analysis. The Director shall inspect the project at the various stages of the work to determine that adequate control is being exercised by the professional consultants. D. Regular Grading Requirements. The Director may require inspection and testing by an approved testing agency. The testing agency's responsibility shall include, but need not be limited to, approval concerning the inspection of cleared areas and benches to receive fill, and the compaction of fills. When the Director has cause to believe that geologic factors may be involved, the grading operation will be required to conform to the "engineering grading" requirement. E. Notification of Noncompliance. If, in the course of fulfilling his responsibility under this chapter, the civil engineer, the soils engineer, the engineering geologist or the testing agency finds that the work is not being done in conformance with this chapter or the approved grading plans, the discrepancies shall be reported immediately in writing to the person in charge of the grading work and to the Director. Recommendations for corrective measures, if necessary, shall be submitted by the civil engineer, soils engineer or the engineering geologist. F. Transfer of Responsibility for Approval. If the civil engineer, the soils engineer, the engineering geologist or the testing agency of record is changed during the course of the work, the work shall be stopped until the replacement has agreed to accept the responsibility within the area of his technical competence for approval upon completion of the work.
(Ord. O-2011-11 § 4, 2011; Ord. O-88-40 § 1 (part), 1988).
Ask a question about Lakewood law
Corpus searches the Lakewood sections it holds and shows the ones that match, with their citations. Free, no sign-in.