§ 14.21.050 — Definitions
Municipal Code of Lakewood, Colorado (Supp. No. 15: codified through Ordinance No. O-2026-16, adopted April 27, 2026) · Lakewood Municipal Code § 14.21.050
Corpus is an independent public-information project, not the official City of Lakewood website. Stable reference: corpuslaw.us/code/100385b9-40f7-4065-8f8c-e35406432201
14.21.050 - Definitions.
For the purposes of this chapter, the definitions listed hereunder shall be construed as specified in this section. Approval means the proposed work or completed work conforms to this chapter in the opinion of the Planning Director, and Public Works Director. As-graded is the extent of surface conditions on completion of grading, including the final quantities of cuts and fills that have occurred. Bedrock is in-place solid rock. Bench is a relatively level step excavated into earth material on which fill is to be placed. Borrow is earth material acquired from an off-site location for use in grading on a site. Civil engineer is a professional engineer registered in the State of Colorado to practice in the field of civil works. Civil engineering is the application of the knowledge of the forces of nature, principles of mechanics and the properties of materials to the evaluation, design and construction of civil works for the beneficial uses of mankind. Compaction is the densification of a fill by mechanical means. Director is the Planning Director, Permits Director and Public Works Director of the City of Lakewood, Colorado or designee. Earth material is any rock, natural soil or fill and/or any combination thereof. Engineering Geologist is a geologist experienced and knowledgeable in engineering geology. Engineering geology is the application of geologic knowledge and principles in the investigation and evaluation of naturally occurring rock and soil for use in the design of civil work. Erosion is the wearing away of the ground surface as a result of the movement of wind, water and/or ice. Excavation is the mechanical removal of earth material. Existing grade is the grade prior to grading. Fill is a deposit of earth material placed by artificial means. Finish grade is the final grade of the site which conforms to the approved plan. Geotechnical Engineer. See Soils Engineer. Grade is the vertical location of the ground surface. Grading is any excavation or filling, or combination thereof. Key is a designed compacted fill placed in a trench excavated in earth material beneath the toe of a proposed fill slope. Rough grade is the stage at which the grade approximately conforms to the approved plan. Site is any lot or parcel of land or contiguous combination thereof, under the same ownership, where grading is performed or permitted. Slope is an inclined ground surface the inclination of which is expressed as a ratio of horizontal distance to vertical distance. Soil is sediments or other unconsolidated accumulations of solid particles produced by the physical and chemical disintegration of rocks; may or may not contain organic matter. Soils Engineer (geotechnical engineering) is an engineer experienced and knowledgeable in the practice of soils (geotechnical) engineering. Soils engineering (geotechnical engineering) is the application of the principles of soils mechanics in the investigation, evaluation and design of civil works involving the use of earth materials and the inspection and/or testing of the construction thereof. Substantial for purposes of this chapter means the cutting or filling of a site to accomplish a two foot or greater change from natural grade. Terrace is a relatively level step constructed in the face of a graded slope surface for drainage and maintenance purposes.
(Ord. O-2019-24 § 4, 2019; Ord. O-91-59 § 5 (part), 1991; Ord. O-88-40 § 1 (part), 1988).
Ask a question about Lakewood law
Corpus searches the Lakewood sections it holds and shows the ones that match, with their citations. Free, no sign-in.
