For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 14.32.160 — Meters and other city-owned equipment

Code of Ordinances of the City of Longmont, Colorado (Codified through Ordinance No. O-2026-39, enacted June 23, 2026 (Supp. No. 9)) · Longmont Code of Ordinances § 14.32.160

Corpus is an independent public-information project, not the official City of Longmont website. Stable reference: corpuslaw.us/code/e6861fe3-e6a6-4ee8-a278-a46db00ffec2

Sec. 14.32.160. - Meters and other city-owned equipment.

A. Point of delivery and metering equipment requirements. 1. The point of delivery is that point on the consumer's premises (or other agreed point) where the city terminates its electrical service conductors, and the customer's wires are connected to the city's conductors. All equipment on the load side of the point of delivery shall belong to and be the responsibility of the customer. Notwithstanding the foregoing, meters and metering equipment and other equipment provided by the city, including instrument transformers, shall belong to and be the responsibility of the city, except for sub meters which may belong to and be the responsibility of the customer if sub meters are authorized pursuant to this chapter. If an outage occurs due to failure of the housing components, the customer is responsible for repairs. 2. It shall be the responsibility of the customer, or the customer's electrical contractor, to obtain the city's most current standards and specifications, to advise the city of the customer's requirements in advance of installing the service entrance equipment, and to ascertain that the location is acceptable to the city. The customer shall furnish and install a meter housing approved by the city for the installation of the city's metering equipment. 3. If, in the city's discretion, instrument transformers are required, refer to drawing MTR-10 and MTR-11 in section 700 of the city design and construction standards. CTs and PTs shall only be installed in approved NEMA Type 3R cabinets with a hinged door, lockable hasp and fasteners that cannot be removed from the exterior of the cabinet. The cabinet shall be of sufficient size for load and voltage conditions. Keyed door locks are not allowed. The CT cabinet and meter socket shall be installed so that the meter socket is not obstructed with the cabinet door in the fully open position. For Switchgear CT compartments, refer to drawing MTR-13, barriers shall be installed on all four sides of compartment. The compartment shall have no customer installed equipment behind hinged sealable doors. All panels providing access to unmetered conductors shall have fasteners that cannot be removed from either the exterior or the customer compartment. No conductors, other than those serving the CT compartment and the ground bus shall be installed in or routed through the compartment. 277/480 volts switchgear shall be manufactured with provisions for unobstructed mounting of PTs inside the same compartment as CTs. If switchgear is to have door fronts, there shall be no other customer equipment inside the metering section. CT cabinets and meter sockets may not be used as a pull-box or junction box. No connections shall be made in the CT compartment or meter socket to supply another meter, more than one load circuit, or customer equipment. For multiple loads a switchboard or combination CT/multi-main equipment must be used. Gutters, raceways and conduit after metering point is allowed. In the case of meter clusters, the customer shall furnish and install metering equipment that has been approved by the LPC staff. LPC staff will inspect installations at the time of service connection. LPC staff shall not install the service meter until the customer installs a meter housing approved by LPC. 4. In multiunit buildings, the line side of the meter bank shall have a fault limiting disconnect installed and shall include provisions for an LPC seal. Seals will be used by LPC to secure the enclosure from unauthorized entry. Each individual meter will have a load side disconnect located next to the meter it serves and shall be plainly marked with an engraved phenolic badge to indicate which corresponding apartment or unit it supplies. Reference detail drawing MTR-9 in section 700 of LPC's design standards and construction specifications. The badge shall be permanently riveted to the electric equipment near the breaker of disconnect. The customer shall be responsible for all electricity delivered through unmarked, illegible or incorrectly labeled meter sockets and is responsible for ensuring that mis-wiring does not occur between the tenant spaces. The city will bill all expenses incurred by the utility related to correcting improperly labeled meters to the customer, who shall pay such expenses within 30 days of receipt of said billing. B. Meter and other equipment locations. 1. Meter housings, service disconnects and associated metering equipment for all types of services shall be located on the outside of the building or structure and accessible to city staff. 2. Meters shall not be fenced in or installed in places difficult to access, such as over open pits, moving machinery, hatchways, in the path of water from eaves or rain spouts, or subject to live steam or corrosive vapors. It shall be the responsibility of the customer to maintain a clear space of at least 36 inches in front of or around the meter and associated electric equipment. No hazardous plants, shrubs or other obstructions, including HVAC line sets and condensing units, shall be placed within the 36-inch clearance area. Customers shall be given seven days to comply after written notice. After the expiration of the seven days, the city, in its discretion, may modify access to the meter in accordance with section 14.32.170.J (Right of access) at the owner's expense or discontinue service. 3. Where the meter is recessed in the wall of a building, a space of not less than 12 inches on each side of the centerline of the meter base shall be provided to permit access for city test equipment or meter changes. 4. New service entrance locations shall be approved by LPC prior to installation. 5. Meters currently located on the inside of the customer's premises shall be moved to the outside whenever the existing service is modified or there is any change of service. 6. All meter equipment must be installed in readily accessible locations for LPC personnel. C. Meter reading. 1. If, for any reason, a meter reading cannot be obtained for any particular period, the billing may be based on an estimated energy use and demand; it will be subject to later adjustment, if deemed necessary by the city. 2. The city will not be obligated to reset demand meters in the event of system disturbances, inoperable load controllers, or other reasons beyond the city's control. D. Meter tests. 1. The city will, at its own expense, make tests and inspections, as required, on its meters to ensure a high standard of accuracy. The city may, in its discretion, test a meter at any time. The city will, at its own expense, make one meter test per year upon customer's request. A meter may be considered accurate if it tests within two percent plus or minus. The city may adjust bills accordingly if a meter tests in excess of the two percent accuracy standard. 2. Additionally, more frequent tests may be made at the request of the customer. In the event the meter is found to register within two percent plus or minus, the customer will be required to pay a test fee to cover the cost of the tests. If the meter is found to exceed the two percent limit plus or minus, the bill may be adjusted accordingly for the preceding six-month period or until the previous test, if tested less than six months before, and no charge will be made for the testing. E. Separate meter for each class of service. When the customer receives service under more than one rate schedule, a separate meter must be installed for service under each rate schedule. The customer will be billed under each rate schedule based on the measurement registered by the applicable meter. A separate meter shall also be required for commercial electric vehicle (EV) charger installations and/or interconnection of a distributed energy resource (DER) that meets the thresholds outlined in the interconnection standards referenced in section 14.32.180. F. Additional meters. Should the customer desire the installation of additional meters other than those necessary to measure adequately the service taken by the customer, or should the city require a separate meter for EV charging or DER interconnection, such additional meters shall be provided, installed and maintained by the customer at the customer's sole cost and expense. G. Individual meters required; exceptions. Dwelling units must be individually metered with meters provided by the city, unless master meters are authorized pursuant to this section. A customer may apply to the director for permission to use a master meter in multifamily dwelling units, or commercial applications. In deciding whether to grant permission, the director may consider, among other relevant factors, supply closet space restraints (space limitations), or where load centers are located on multiple levels (floors) of a building where there is a need for reducing the quantity of home run wiring paths to each meter. If permission is granted, the customer must use a master meter provided by the city. All multifamily dwelling units using master meters as authorized by this section shall be subject to the applicable commercial electric rate and commercial ECIF.

(Ord. No. O-2024-83, § 2, 12-17-2024; Ord. No. O-2025-53, § 5, 10-28-2025)

Ask a question about Longmont law

Corpus searches the Longmont sections it holds and shows the ones that match, with their citations. Free, no sign-in.