Sec. 14.32.190. - Line extension policy.

A. Residential service extensions. 1. Service standards. a. LPC is responsible for the standards, electrical engineering and design associated with the city-owned and -maintained electric utility. b. All electric distribution systems will comply with the requirements outlined in this chapter and in the city design standards and construction specifications. c. Unless approved by the LPC engineering division, residential subdivision developments within the city will incorporate front of lot underground facilities. Individual building lots within areas with established overhead facilities and rural subdivision developments may incorporate either overhead or underground facilities at LPC's discretion. Underground installations will utilize pad mounted transformers. The available single phase voltage will be 120/240 volts. d. Public roadways will be lighted in accordance with LPC street lighting guidelines. Street lighting systems will be designed and constructed by the city. Customers are responsible for the costs of design and installation. e. Line extensions will begin at the closest suitable point of the electric distribution system, as determined by the city. f. The extension will end at the customer's point of delivery and the responsibility for service facilities is: i. Underground. The city will own, install, and maintain the primary voltage system, including transformers, and the secondary voltage system, to and including the metering pedestal or the secondary ground vault/junction box. (A) Pedestals. The customer will install, own, and maintain the service facilities from the pedestal. These facilities shall be in accordance with the requirements of the NEC and the city building inspection department or the Boulder or Weld county inspection department. (B) Secondary ground vaults/junction boxes. Where secondary ground vaults/junction boxes have been installed in residential subdivisions in lieu of pedestals, the customer will install, own, and maintain the secondary facilities to the home, including the meter housing as set forth in the LPC's metering specifications and the city's design standards and construction specifications. The installation shall meet the requirements of the NEC and the governing inspection agency. ii. Overhead. The city will own, install, and maintain the primary voltage system, transformers, and service wiring up to the service mast. The customer will own, install, and maintain the service facilities including the mast, an attachment point for the secondary service wire drop that is secure and provides proper clearance, and associated wiring (and meter pole, if required). These facilities will be in accordance with NEC requirements and be inspected and approved by the governing agency. g. Connections. i. All connections to city-owned facilities must be made by city personnel. ii. If any meter/metering equipment or city requirement is found to be compromised by changes to existing building installation without the documented approval of the city, the customer will pay the cost to correct the deficiencies. 2. Procedures. a. To initiate the design and cost estimating process for residential development, the following procedures will apply: i. For new development, refer to the city design standards and construction specifications. ii. Construction on a lot not served by meter pedestal or secondary junction vault: the customer shall submit the applicable request for electric service and shall schedule a project coordination meeting with the LPC engineering division. iii. Construction on a lot served by an existing secondary junction vault or metering pedestal: no coordination with the LPC engineering division is required. The customer shall comply with LPC's metering specifications and the city's design standards and construction specifications. b. All project design and cost estimates will be determined by LPC. Refer to the city design standards. c. For current transformer (CT) and potential transformer (PT) requirements refer to metering requirements in the city design standards and construction specifications. d. The customer must provide written easements to the city for all properties which the line extension will cross. The city will furnish the standard form for these easements and will designate width of easements and acceptable line routes. e. All required procedures must be satisfied before the project work order will be scheduled for construction. f. Site preparation must be completed prior to construction start: i. Refer to the city design standards for specific development requirements. ii. Lot corners or other requested references must be marked by the customer. This may include locating associated electric easement granted for access to and construction within the project site. iii. If the city determines that the extension passes through a rocky area, the customer must provide a six-foot deep hole for each pole and a seven-foot deep hole for each anchor for overhead construction or a 42-inch deep trench for underground construction. LPC personnel, or the customer if required in the city's sole discretion, will stake the required location of each pole and anchor or the route of each trench. iv. Streets or access routes and construction areas must be open for safe equipment passage and operation. 3. Fees. a. The on-site cost will be paid by the customer. The term "on-site" refers to facilities directly associated with service to the development or building and/or facilities physically located on the development or building site. The cost will be the total of material, labor, equipment, city subcontracted work associated with the project, and engineering/administration costs, based on standard estimating procedures established by the LPC engineering division. b. The customer is responsible for paying all costs required for street lighting systems within the development, and the appropriate portion of costs required for street lighting along public roadways adjacent to development. c. Payment will be made as required to LPC. d. Charges for changes during construction or after initial installation of the system will be borne by the customer. Changes in installation techniques due to unforeseen conditions will also result in charges to be borne by the customer. e. An electric community investment fee (ECIF) for all new electric services and upgrades is required. Specific details of the ECIF are provided in section 14.32.150. B. Commercial/industrial service extensions. 1. Service standards. a. LPC is responsible for the standards, electrical engineering and design associated with the city-owned and -maintained electric utility. b. All electric distribution systems will comply with the requirements outlined in this chapter and the city design standards and construction specifications for electric distribution systems and service line construction. c. New commercial or industrial areas within the city will be constructed using underground electric facilities. Individual building lots within areas with established overhead facilities and areas outside the city limits may incorporate overhead or underground facilities at LPC's discretion. Underground installations will utilize pad mounted transformers. Overhead installations are limited to a maximum transformer size of 300 kVA. d. Line extensions will begin at the closest suitable point of the electric distribution system, as determined by LPC. e. Public roadways will be lighted in accordance with LPC street lighting design guidelines. Street lighting systems will be designed and constructed by the city. Customers are responsible for the costs of design and installation. f. Under standard practice, commercial/industrial subdivision designs will incorporate a three phase primary voltage system with associated tap points. Individual service installations may be either single or three-phase at the customer's option. Available three-phase voltages will be 120/208 volts or 277/480 volts. Available single-phase voltage will be 120/240 volts. If supplied by a three-phase installation, 120/208 volts single-phase will be the service standard. g. All installations will have the meter located on the exterior of the customer's building. 2. Installation and ownership of facilities. a. Standard services. i. Underground. The city will own, install, and maintain the primary voltage system including transformers. The customer will own, install, and maintain the service facilities from the transformer secondary spades in accordance with the NEC requirements. Additionally, the customer must furnish the concrete pad for the transformer per the LPC engineering division specifications. This pad remains the ownership and maintenance responsibility of the customer. ii. Overhead. The city will own, install, and maintain the primary voltage system, transformers, and service wiring up to the service mast. The customer will own, install, and maintain the service facilities including the mast, an attachment point for the secondary service wire that is secure and provides proper clearance, and associated wiring; these facilities shall be in accordance with NEC requirements. b. Primary meter services. The city will own, install, and maintain all primary voltage facilities up to and including the customer's metering point. The customer will own, install, and maintain all facilities on the load side of the metering point unless determined otherwise by individual contract. All customer facilities will be in accordance with NEC requirements. 3. Connections of service facilities. Customer-owned facilities must be inspected and approved by the appropriate governing agency prior to final connection to the city-owned facilities and/or system. a. Underground service. All connections to city-owned facilities will be made by city personnel. i. The total number of connections within a single-phase transformer is limited to four with a maximum cable size of 500 kcmil. ii. The total number of connections per phase within a 25 kva-225 kva three-phase transformer will be limited to six with a maximum cable size of 500 kcmil. iii. The total number of connections per phase within a 300-2500 kva three-phase transformer will be limited to ten with a maximum cable size of 750 kcmil. iv. The customer will install cable of sufficient length for termination. v. In the event that more than the allowed number of conductors are required, a secondary cabinet must be installed at the customer's expense. This cabinet will be owned, installed, and maintained by the customer and will become the point of attachment for the service. For additional details refer to the city's design standards and construction specifications. b. Overhead service. Under standard practice, city personnel will connect the city-owned service drop to the customer-owned mast wiring. 4. Procedures. a. To initiate the design and cost estimating process, refer to the city design standards and construction specifications. b. The customer shall furnish and install a meter housing approved by the city for the installation of the city's metering equipment. If, in the city's discretion, instrument transformers are required, an approved location and mounting bracket shall be provided for outdoor type instrument transformers, or if an outdoor installation is not desirable, the customer shall furnish and install an approved suitable metal enclosure for the installation of instrument transformers and the metering sockets for which the city will furnish and install the meters. In the case of meter clusters the customer shall furnish and install metering equipment that has been approved by LPC. LPC staff will inspect installations at the time of service connection. LPC staff shall not install the service meter until the customer installs a meter housing approved by LPC. The governing inspection agency will be notified and an additional inspection may be required. c. The customer may be required to provide easements in addition to previously recorded plats to the city for all properties which the line extension will cross. Surveying costs required to provide such easements are at the customer's expense. The city will furnish the standard form for these easements and will designate width of easements and acceptable line routes. d. All required procedures must be satisfied before the project work order will be scheduled for construction. e. The following site preparation must be completed prior to construction start: i. Refer to the city design standards for specific development requirements. ii. If the city determines that the extension passes through a rocky area, the customer must provide a six-foot deep hole for each pole and a seven-foot deep hole for each anchor for overhead construction or a three-foot deep trench for underground construction. LPC engineering division personnel, or the customer if so required in LPC's sole discretion, will stake the required location of each pole and anchor or the route of each trench. 5. Fees. a. The on-site electric facilities cost will be paid by the customer. The term "on-site" refers to facilities directly associated with service to the development or building and/or facilities physically located on the development or building site. These costs may include the relocation or alteration of existing electric facilities necessitated by the project. The cost will be the total of material, labor, equipment, city subcontracted work associated with the project, and engineering/administration costs, based on standard estimating procedures established by LPC. b. The responsible party will pay all costs required for street lighting systems along public roadways within the development, and the appropriate portion of costs required for street lighting systems along public roadways contiguous to the development. c. Charges for changes during construction or after initial installation of the system will be borne by the responsible party in accordance with subsection B.5.a of this section. Changes in installation techniques due to unforeseen conditions will also result in charges to the responsible party. d. Payments will be made as required by LPC. e. An electric community investment fee (ECIF) for all new electric services and upgrades is required. Specific details of the ECIF are provided in section 14.32.150.

(Ord. No. O-2024-83, § 2, 12-17-2024; Ord. No. O-2025-53, § 6, 10-28-2025)