Sec. 14.32.170. - Miscellaneous.

A. Service entrance facilities and additional load. 1. In the event a customer desires to substantially change the service entrance facilities and load, the customer shall adhere to all applicable LPC request for service and city permitting and inspection requirements and shall provide LPC all necessary information in sufficient time to comply with the line extension policies. 2. In the event that the customer fails to notify the city, or follow the provisions of the line extension policy, and as a result the city's equipment is damaged, the customer shall be liable for the cost of such damage. The city will not be responsible for providing adequate service in the event that it is not properly notified. B. Attachments to utility property. 1. No posters, banners, placards, radio or television aerials, or other objects will be attached to the poles or other utility property of the city. Any attachment to the city's poles or other utility property must have the express prior written authorization of the director or the director's designated representative. 2. Attachment to the pole by others under the 1996 Federal Telecommunications Act for providing services must be made pursuant to a pole attachment agreement provided by the city. C. Curtailment. 1. In the event that a serious power shortage should develop, and should it become mandatory that the city place into effect a curtailment program, the city or Platte River Power Authority acting on behalf of the city reserves the right to limit or interrupt the use of electrical energy during such hours as may become necessary. 2. In the case of emergency, the city shall have the right to grant a preference to the electric service, which, in the city's sole discretion, is most essential to the public health, safety and welfare. D. Customer power outage. 1. If a customer's service fails, the customer shall endeavor to determine if there are blown fuses, tripped breakers, or if there has been an equipment failure before calling the city. 2. If a service person is sent out at the customer's request and it is determined that the customer's equipment is at fault, a charge may be made for the call. The charge may include the actual cost of labor and transportation. E. Easements. 1. A contract for electric service, or receipt of service by the customer, will be construed as an agreement granting to the city an easement on the customer's property for electric lines, wires, conduits, and other equipment of the city necessary to render service to the customer. 2. If requested by the city, before service is connected, the customer will execute an easement on a form provided by the city, granting to the city, at no expense therefore, satisfactory easements for a suitable location of the city's wires, conduits, poles, transformers, metering equipment, telecommunication equipment, and other appurtenances on or across lands owned or controlled by customer, and will furnish space and shelter satisfactory to the city for all apparatus of the city located on the customer's premises. 3. In the event that customer shall divide its premises by sale in such manner that one part shall be isolated from the point where the city's electric or telecommunication lines are accessible, customer shall grant or reserve an easement for electric or telecommunication service over the part having access to electric or telecommunication lines for the benefit of the isolated part. F. Diversion of electric energy. 1. Definitions. The following words, terms and phrases, when used in this chapter shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning: Bypassing means the act of attaching, connecting, or in any manner affixing any wire, cord, socket, motor or other instrument, device or contrivance to the electric supply system or any part thereof in such a manner as to transmit, supply or use any electricity without passing through an authorized meter for measuring, registering or determining the amount of such electricity consumed. Energy diversion means bypassing, tampering or unauthorized metering. Tampering means the act of tampering, altering, adjusting or in any manner interfering with or obstructing the action or operation of any meter provided for measuring, registering or determining the amount of electricity passing through such meter. Unauthorized metering means the act of removing, moving, installing, connecting, reconnecting or disconnecting of any meter or metering device for electric service by a person other than an authorized employee of the city. 2. Prohibited activity. Energy diversion is unlawful and prohibited, and is punishable in accordance with chapter 1.12. Energy diversion constitutes a safety hazard. Due to its hazardous nature, and in addition to all other remedies provided by law, discovery by the city that energy diversion has occurred shall be grounds for immediate disconnection of service without prior notice to the customer or user at such premises, and service shall not be reconnected until any and all deficiencies in wiring, connections, meters and/or electric facilities at the premises have been repaired, corrected or otherwise altered to conform with city requirements. In any case where energy diversion has occurred and immediate disconnection is effected, the city will give notice concurrent with the disconnection or as soon as practicable thereafter and provide an opportunity for hearing regarding possible resolution of the dispute. 3. Estimated bill. In all cases where the city discovers that energy diversion has occurred, the city may bill the customer for estimated energy consumed but not properly registered. 4. Additional charges. Where the city discovers that energy diversion has occurred, the city, in its discretion, may charge the customer or property owner for the costs of investigation, the costs resulting from the installation of protective devices by the city, and may take whatever other steps are reasonably necessary to protect the interests of the city, including, but not limited to, billing the customer or property owner an estimated charge for energy lost. 5. Waiver. Payment by the customer of any charges under this section does not limit or waive the city's rights to pursue any and all remedies provided under applicable law. 6. Criminal offense. Meter tampering is a criminal offense under C.R.S. §§ 18-4-505—18-4-506.5. G. Interruption of service or fluctuation in voltage. 1. The city will use reasonable diligence to provide an adequate and uninterrupted supply of electrical energy at normal voltage. But, if the supply shall be interrupted or fluctuate in voltage for any cause, the city shall not be liable for personal injuries, loss or damages resulting therefrom, nor will such failure constitute breach of an agreement for electric service. The customer shall be responsible for taking whatever precautions the customer deems appropriate to protect against interruptions of service or fluctuations in voltage, so long as the precautions do not conflict with these regulations. 2. The city shall have the right to temporarily suspend service for the purpose of making repairs or improvements to the system, but in such cases, where practicable, public notice shall be given and every effort will be made to make such interruptions as short as possible. H. Notice of trouble. In the event that service is interrupted or not satisfactory, or any hazardous condition is known to exist, it shall be the obligation of the customer to notify the city of such condition. I. Resale of electric energy. 1. Electric energy supplied by the city is for the exclusive use of the customer. Therefore, the customer may not, by submetering, determine a quantity of electric energy and resell said electric energy to any other person on the customer's premises or for use on any other premises. 2. A master meter customer may, however, check meter tenants, lessees, or other persons to whom ultimately the electricity is distributed for the purpose of reimbursing the master meter customer through an appropriate allocation procedure. 3. The city reserves the right to refuse to furnish electric service to any customer where the purchase of such service is for the purpose of resale by the customer to others. In the event electric energy is sold in conflict with this section, the city shall have the right to discontinue service to the customer. J. Right of access. 1. The customer will provide access to their premises at all reasonable times for authorized employees of the city for any proper purpose incidental to the supplying of electric or telecommunication service. This would include, but is not limited to, reading meters and testing, inspecting, repairing or replacing any equipment which is the property of the city. For the purposes of maintaining or repairing the city's equipment, if access to the property or any equipment is limited in any fashion, the customer shall take all steps, including the provision of keys where necessary, to provide access. If access to city equipment on the property is limited in any fashion, the customer will be required to pay a charge to have remote read, connect/disconnect capable equipment installed on the site. Failure to grant the city access to upgrade the meter or other equipment to current city standards shall result in disconnection of service after a seven-day written notice. 2. All easement areas shall be maintained for adequate access to city equipment. The city shall have the right to correct the access problem at the customer's expense or discontinue service if the customer does not correct the access problem within seven days after written notification of the problem. In the case of an emergency, the city may discontinue service or correct the issue without notice. 3. The city shall not be responsible for replacing trees, shrubs, plants, or ground covers which have been damaged and are in the right-of-way or easements, or within required equipment clearances, during emergency outages, maintenance of equipment or while obtaining monthly meter reads. K. Cogeneration and small power production. 1. The city is contractually obligated to purchase all of its requirements for electric power and energy from the Platte River Power Authority. In order to meet its contractual obligations, Platte River Power Authority has agreed to purchase any power and energy offered to the city by a qualifying facility, which exceeds the net metering capacity thresholds in subsections 14.32.020.C, 14.32.020.D, 14.32.040.B, 14.32.040.C., 14.32.040.E, 14.32.040.F, 14.32.040.H, and 14.32.040.I, located in the city's service territory. The city will fulfill all of its obligations under this agreement and may, in its discretion, exercise any rights provided by the agreement or applicable Platte River Power Authority tariffs. 2. The city will provide electric service to all qualifying facilities located in its service territory pursuant to applicable rate schedules and this chapter. Supplementary, back-up, maintenance, and interruptible power may be provided to qualifying facilities, upon request, at a rate determined on a case-by-case basis. 3. The city must be consulted in advance of any construction by the qualifying facility. The qualifying facility shall provide to the city all information requested by the city relevant to the proposed construction. The city will evaluate each proposal on a case-by-case basis and may prescribe reasonable terms and conditions governing operations, including interconnection standards pursuant to section 14.32.180. 4. The city shall require the execution of a written agreement prior to interconnection in accordance with the standards set forth in section 14.32.180. 5. The qualifying facility shall indemnify and hold the city harmless from any and all liability arising from the operation or interconnection of the qualifying facility. All facilities constituting the qualifying facility are subject to the inspection and approval of the city at any time after construction has begun. The qualifying facility is required to procure and maintain such insurance as is deemed necessary by the city, solely at the expense of the qualifying facility. The city may require disconnection of the qualifying facility from the city's system for reasons of safety, interference, reliability, or at the request of Platte River. 6. Any and all costs of interconnection, including those incurred by the city, shall be the sole responsibility of the qualifying facility. The city may require any costs that the city may incur to be estimated and paid in advance. 7. Based on mutual agreement between the city, the qualifying facility and Platte River, the city may transmit energy or power and energy supplied by the qualifying facility to another utility other than Platte River, pursuant to an appropriate contract, to the extent that transmission capacity is available. The city may make an appropriate charge to the qualifying facility for such transmission. L. Customer access to utility property. Customers will not be allowed access to any utility-owned facility, including, but not limited to, vaults, transformer cabinets and meter pedestals. All service connections within these facilities will be made by city personnel or authorized contractors. M. Emergency or supplemental generators. 1. Requirements. In order to avoid metering and safety-related back feed problems, the city shall review for approval all customer-owned emergency or supplemental generation equipment installations that incorporate a permanent attachment point with LPC. Customers shall not attach any generation equipment to the city electrical system without prior written approval of the city's building inspection department and LPC. 2. Procedures. The installation of generation equipment with a fixed or switched attachment to LPC will require the following: a. Any customer proposing to install generation equipment shall incorporate a switch to prevent the equipment from operating in parallel with the city electrical system. The customer shall have the switch installation inspected and approved by the city's inspection division and by LPC as a condition of approval for a certificate of occupancy. 3. Emergency generation operation. Any customer proposing to connect and operate generation equipment on the customer's side of the electric service entrance during any utility outage must disconnect the customer's system from the LPC utility system at the service entrance main disconnect during generator operation and disconnect the generator prior to reconnection with the LPC system. N. Special services requested by customer. 1. Upon request from the customer, a variety of special services are available such as backup transformers, enhanced reliability service configurations, automatic transfer, harmonic filtering, and undergrounding or relocation of facilities. 2. When requested by the customer, and where determined feasible by LPC, the estimated cost for installation and operation and maintenance will be determined. The customer will be responsible for paying the full cost of installation prior to installation. The customer will also be required to pay for the ongoing operation and maintenance costs. 3. LPC reserves the right to refuse to provide a specific special service if it will have negative impacts on the operation of LPC or its customers. O. Excavations. Any person wanting to excavate in LPC's service area must first comply with C.R.S. §§ 9-1.5-101—9-1.5-106. P. Trees near power lines. 1. For safety and reliability reasons, LPC or its agents must trim any tree or other vegetation on the customer's premises that is near or adjacent to power lines. The trimming shall be done according to section 700 of the city design standards and construction specifications. 2. Tree houses, antennas or other overhead installations near power lines must adhere to clearance requirements in accordance with NESC standards. Removal of such installations not in compliance with these standards shall be the responsibility of the customer at the customer's sole cost and expense. 3. It is the customer's responsibility to make sure all items in, on, under and over the customer's property maintains current clearance requirements from LPC's infrastructure. Any damages to LPC's infrastructure by a customer owned item, including, but not limited to, any tree or other vegetation, will be the responsibility of the customer at the customer's sole cost and expense.

(Ord. No. O-2024-83, § 2, 12-17-2024; Ord. No. O-2025-53, § 5, 10-28-2025)