Sec. 2-272. - Construction permits.
(a) Application/generally. (1) Under this Code generally, an application for any type of construction permit is required to allow work within the city, including work within the ROW. An applicant shall file an application for a construction permit on a form supplied by the city development department; provided, however, landscaping work outside the ROW is excluded unless required by a development plan issued by the city. The application shall include the following: a. The name of the person or entity to whom the construction permit is to be granted, the address and the date a request for a construction permit is filed; b. The name and address of the developer and/or all contractors licensed to operate in the city, and the name who expects to do work or engage in construction activity or excavation pursuant to the construction permit; c. Detailed description of the construction activity, excavation, work or other activity proposed as applicable; d. A statement describing in detail the nature and purpose of the project including specifications as to the variety, type, and quantity of facilities expected to be placed in the rights-of-way; e. The location including mapping for the proposed construction activity, excavation, work, or other related activity in as accurate detail as possible, hereafter referred to as "the project," including engineering construction drawings and/or a site plan for the project including interface with the permittee's existing structures and/or facilities. All such information shall be provided in AutoCad Compatible format when available and that is compatible with the city's GIS software program; f. The type of existing public improvements (street pavement, curb and gutter, sidewalks, utilities or otherwise) impacted by the project; g. The proposed dates for beginning and ending the project; or, if an ongoing project, the estimated length of the project; h. Proposed hours for each day of the project; i. A plan for storage of equipment and materials for the duration of the project; and j. Itemization of the estimated total cost of the project including restoration costs anticipated to be needed for the project, as required to establish a performance bond, letter of credit, or other form of performance guaranty required to obtain a construction permit. k. To the extent the information required in this subsection (a)(1) is for a person or entity which is also a franchisee, or the information required by this subsection (a)(1) is required to be regularly provided by another agreement or arrangement with the city, this subsection (a)(1), shall not apply. (2) The applicant may be required to include evidence that all orders issued by the city to the applicant, requiring the applicant to correct deficiencies under previous permits issued under city ordinance have been satisfied and the applicant is in compliance with all city rules regarding rights-of-way. Failure to provide this information may result in the issuance of a permit being delayed or denied. (3) Attach copies of all other permits or licenses (including required insurance, deposits, bonding, and warranties) required for the proposed project in the city including any required document or agreement evidencing permission to use the city's ROW, unless permission has already been granted by a franchise or other form of agreement, if licenses or permits are required under the laws of the United States, the state of Colorado, or the ordinances or regulations of the city. (4) Include a statement indicating any proposed joint use or ownership of the facility, any existing facility or permit of the applicant at this location; any known existing facility of others with which the proposed installations might conflict; and the name, address and telephone number of a representative of the applicant available to review proposed locations at the site. (5) Pay the construction permit fees prescribed by this article. Permittee may request the city allow the establishment of an escrow account to cover charges for permits, which request will not be unreasonably withheld. (6) Applicants shall update any new information on construction permit applications within ten days after any material change occurs. (7) Any person submitting any type of application for a construction permit, as provided by this article, shall meet all additional requirements set forth in the city standards and specifications. Development projects that do not involve construction activity in or related to the ROW or public improvements shall be governed by the Development Code and the Standards and Specifications, as applicable. (b) Applications and Permits for Work within ROW. In addition to a construction permit, any person desiring to perform any work within the city ROW will be required to satisfy additional requirements, as described in this subsection (b). (1) Prior to performing any work within the city ROW, such person shall obtain from the city infrastructure department a ROW use agreement which shall, at minimum, meet the requirements of this article for issuance of a construction permit, and which shall be signed by the responsible party or agent thereof. (2) As a condition of performing work or excavation within the city ROW, the director may require the concurrent installation of empty shadow conduit with tracer wire and associated infrastructure. The size of the shadow conduit with tracer wire and associated infrastructure shall be determined by the city. The conduit and associated infrastructure shall be owned by the city and the direct cost of installing the city's conduit will be paid by the city. The director has the discretion to require the installation of such conduit when a permit is issued for the following: a. A pit, trench, hole, opening, digging or excavation across the entire paved width of a roadway; b. A pit, trench, hole, opening, digging or excavation of 100 feet or more parallel to a roadway; or c. Any other pit, trench, hole, opening, digging or excavation that provides a similar opportunity to install shadow conduit. (3) As a condition of performing any excavation or utility installation work in the ROW, the director may require that utility installations be coordinated with city street improvement projects or other public improvements or utility installations planned by the city, another telecommunications service provider, or other persons providing utility service within the city. The director may require that conduit be installed in the same or an adjacent location that the permittee proposes for excavation and, if so required, the permittee shall coordinate with the city and facilitate the installation of the city's conduit. The direct cost of installing the city's conduit will be paid by the city. (c) Joint applications. (1) Applicants for a construction permit may apply jointly for such permit that is to occur at the same time and place. Applicants who apply jointly for construction permits may share in the payment of the permit fee. Provided however, each applicant shall be jointly and severally responsible for performance pursuant to any type of performance guaranty. Applicants must agree among themselves as to the portion each shall pay. The fee for individual and joint permits shall be the same for one application. (2) Applicants who submit joint applications must each establish permission to place and use structures and facilities in the ROW. (d) Construction permit fees. (1) Amount of fee. Before a construction permit is issued pursuant to this article, a construction permit fee shall be paid, which shall be determined in accordance with a fee schedule adopted by resolution of the city council. Construction permit fees will be reasonably related to the costs inherent in managing the ROW or affecting any public improvements. These costs include, but are not necessarily limited to, administering the requirements of this article, the costs of permitting, verifying, and mapping ROW occupations and public improvement projects, inspecting job sites and ROW and public improvement restorations, and costs relating to the degradation of the ROW; i.e., the cost to achieve a level of restoration as determined by the city at the time the permit is issued to the extent authorized by law. (2) Reduction in degradation costs. The portion of the construction permit fee relating to degradation costs shall be reduced in cases where the applicant demonstrates to the satisfaction of the director that the excavation proposed will be used by three or more entities, legally and financially unrelated, for the installation, maintenance or repair of structures or facilities. The degradation cost portion of the construction permit fee shall be further reduced in cases where the applicant demonstrates to the satisfaction of the director that the excavation to be made will be commenced and completed during the 24-month period immediately prior to the scheduled repaving or resurfacing of a street, as indicated in the most recent edition of the city's repaving plan. There are no degradation costs for construction activity which excludes excavation and that does not involve material disturbance of public improvements in the right-of-way. (3) Requirements for permits, applicable fees, deposits, or bonds herein described shall not apply to city departments performing any construction activity or public improvements within city-owned property, ROW, or public easements. (e) Permit restrictions. (1) Construction, excavation or work area. No construction activity, excavation, or work shall be performed in an area larger or at a location different, or for a longer period of time than specified in the construction permit. If, after a project is commenced under an approved construction permit, it becomes necessary to perform construction activity, excavation or work in a larger or different area than originally requested or for a longer period of time, the permittee shall notify the director immediately, and within 24 hours (excluding holidays and weekends) shall file a request for a supplementary construction permit for an expanded project, and the permittee shall be billed for the additional amount owed. (2) Permit transferability or assignability. Any permittee may subcontract a project or portion thereof under a construction permit provided that the permittee shall be and remain responsible for the full performance under the construction permit and all insurance and financial security as required. Construction permits are transferable and assignable if the transferee or assignee posts all required security pursuant to this article and agrees to be bound by all requirements of the construction permit assigned or transferred. (3) Developer ownership of public improvements. In the city, the physical construction of public improvements in new developments is the responsibility of the developer of the land. Ownership of the public improvements remains with the developer of the land until initial acceptance by the city. Any developer of land where the project includes construction of or affects existing public improvements that are within the ROW, but prior to acceptance by the city, shall obtain a construction permit pursuant to this article. The city will not initially accept public improvements, where such public improvements are not in accordance with applicable Standards and Specifications and applicable provisions of this article. (4) Operating without a permit. Any person found to be conducting any construction activity, work, or excavation activity without having first obtained any type of construction permit or other required permit(s), except for service connections or service lateral connections for new or existing subscribers, and/or unless otherwise specified by the conditions set forth in Section 2-281 shall immediately cease all activity (exclusive of actions required to stabilize the area), and be required to obtain all applicable permits before the project may be restarted. An additional surcharge shall be required in addition to all applicable permit fees. The amount of the surcharge shall be set by resolution of the city council. Any entity with facilities in the ROW may undertake routine maintenance on existing facilities without obtaining written permission of the director if it meets the conditions set forth in Section 2-276(c). (5) Time of completion. All activity covered by the construction permit shall be completed by the date stated on the construction permit application. Permits shall be void if activity has not commenced as required by the construction permit, unless an extension has been granted by the director. Performance bonds, letters of credit or letters of responsibility deposited as a performance/warranty guarantee for individual construction permits will be returned if voided, with administrative and any other city costs deducted. (6) Public safety. The permittee shall maintain a safe environment for the project, free of safety hazards. The city may make any repairs necessary to eliminate any safety hazards not performed as directed after permittee has been given an opportunity, upon at least 24 hours written or verbal notice, to repair the hazard. Any such repairs performed by the city shall be completed and billed to the permittee at applicable rates. The permittee shall pay all such charges within 30 days of the statement date. If the permittee fails to pay such charges within the prescribed time period, the city may, in addition to taking other collection remedies, seek reimbursement through the warranty guarantee. Furthermore, the permittee may be barred from performing any further work and, under no circumstances will the city issue any further permits of any kind to said permittee, until all outstanding charges have been paid in full. (f) Revocation of construction permits and stop work orders. (1) Permit revocation or suspension. Any type of construction permit may be revoked or suspended by the director or designee or as prescribed by the Standards and Specifications, upon at least 24-hour written notice of the basis for the city's action and after the permittee has had a reasonable opportunity to cure, for: a. Violation of any material condition of the construction permit or of any provision of this article or any violation of the Standards and Specifications; b. Violation of any provision of any other ordinance, rule, or regulation of the city or state law relating to the activity or project authorized by the construction permit; and c. The existence of any condition or the performance of any act which the city determines constitutes or causes a condition that may endanger persons or may constitute a threat of damage to the public health or property. (2) Stop work orders. A stop work order is hereby authorized to be issued by the director and/or as prescribed by the Standards and Specifications to any permittee under circumstances set forth in this subsection: a. Criteria for issuance of stop work orders are: 1. Operations without a permit, except for routine maintenance or emergency repairs to existing structures or facilities as provided for in this article. 2. Operating in violation of any provision or requirement of this section, or any other ordinance, rule or regulation of the city, or state law relating to the activity authorized by the construction permit, after having been given a reasonable opportunity to cure the violation; and 3. Performing any act, which city determines constitutes or causes a condition that endangers either life or property. b. Effective immediately. Stop work orders issued by the director shall take effect immediately upon written notice to the permittee by mail and upon service of the stop work order to any person employed by or under contract with the permittee at the job site, for issuance by mail the permittee's last known address is sufficient. Upon receipt of the stop work order, all activity is to cease except for those activities that are necessary to make the work area safe, or to end the disruption to traffic, or to protect people or property and upon request of the permittee, if approved by the director. Provided however, the permittee may continue to work so long as such work is in an effort to immediately cure the violation or conditions that caused the stop work order. If the condition that precipitated the stop work order is cured to the satisfaction of the city, the stop work order will be immediately lifted. c. Appealing a suspension, revocation, or stop work order. Any suspension or revocation or stop work order may be appealed by the permittee to the city building code advisory board by filing a written notice of appeal within 30 days of the action. (3) Performance bond/letter of credit. a. Performance guaranty. 1. No construction permit shall be issued for excavation, construction activity, or work within the city ROW until the applicant therefore shall first deposit, unless otherwise agreed upon between the city and the permittee by agreement or contract, with the city a cash escrow or letter of credit acceptable to the city in an amount determined by the city engineer utilizing the cost data manual as published by the state department of transportation, latest revision or other generally accepted engineering methodology to establish estimated costs, to be sufficient to cover the entire value of the project as specified under the conditions of the ROW construction permit. 2. No construction permit shall be issued for construction activity, excavation or work activity within the city in connection with a commercial or residential development project unless the applicant shall first deposit, unless otherwise agreed upon between the city and the permittee by agreement or contract, with the city a cash escrow or other form of performance guaranty acceptable to the city in an amount determined by the development engineering manager utilizing the cost data manual as published by the state department of transportation, latest revision, or other generally accepted engineering methodology to establish estimated costs to be sufficient to cover the entire expense of replacing any materials removed or damaged during construction as specified under the conditions of the site construction permit. 3. The performance guaranty provided for in either subsection 1. or 2. of this section shall be conditioned upon the permittee's faithful performance of the duties prescribed in this section, all provisions of city ordinances, rules and regulations, and upon payment of all judgments and costs rendered against the applicant for any material violation of city ordinances or state statutes that may be recovered against the applicant by any person for damages arising out of any negligent or wrongful acts of the applicant in the performance of activity authorized by the construction permit. If the performance guaranty is in the form of a performance bond, the city may bring an action on the performance bond or letter of credit on its own behalf or on behalf of any person so aggrieved as beneficiary. The performance bond or letter of credit must be approved by the city as to form and as to the responsibility of the surety thereon prior to the issuance of the construction permit. 4. If the security deposited with the permit application is at any time deemed to be insufficient, the permittee shall, within ten days after receiving notice of such deficiency from the city, deposit with the city such additional security as the city engineer or development engineering manager considers necessary to correct the deficiency. Failure to deposit such funds within the prescribed time allotted shall result in the revocation of any applicable permits until at such time as all security deposit conditions have been satisfied. 5. The city shall refund to the permittee 85 percent of any applicable deposits or guarantees within 60 days of the initial acceptance of any construction activity, with the exception of any such activity relating to a specific street cut into an existing street, in which case 100 percent of any applicable deposit or guaranty shall be retained until the final acceptance, as defined in this chapter. 6. Any remaining deposit or type of performance guaranty which has not been refunded by the city, as specified in subsection 3. of this section, shall be held in escrow until at such time as the conditions of any warranty periods have been satisfied. The development engineering manager shall then cause the remainder of any such deposit or other form of guaranty to be released. In the event the permittee fails to perform any replacement/repair work within 60 days following written notification of work deficiencies, the director shall utilize the proceeds of the deposit or other guaranty to cause the replacement/repair work to be completed. 7. Any deposit, escrow, or other means of performance guaranty which has been retained by the city until the satisfactory completion of the final acceptance or warranty period which has been deemed refundable to the permittee, shall be returned within 60 days following the end of the one-year warranty period. In the event that such funds remain unclaimed, provisions pursuant to Article II of Chapter 26 shall apply, unless as otherwise stated in this chapter. b. Letter of responsibility. A letter of responsibility in a form acceptable to the city, which may include a letter of credit, will be accepted in lieu of a performance guaranty from all public utilities, all franchised entities or telecommunications service providers owning and operating facilities in the ROW within the city. (g) Inspections of activity authorized by construction permits. The city shall have the right to make inspections at any time, to reject any work or materials which are defective or do not materially conform to the requirements of this Code, the approved plans, or Standards and Specifications. (1) Upon review of the application for a construction permit, the director shall determine how many inspections, if any, may be required. For most construction permits, the inspection procedure will entail the following: a. The city may conduct a pre-construction inspection, to determine any necessary conditions for the construction permit; however, issuance of a construction permit is not conditioned upon a pre-construction inspection. b. The permittee shall notify the city before the project begins and the city shall conduct periodic inspections as operations are completed. c. The city shall inspect the completed project within 21 days of the city's receipt of the permittee's written and dated request for initial acceptance. Initial acceptance will be given if activity authorized meets city and construction permit standards. d. Approximately 30 days prior to the expiration of the two-year guaranty, the city shall conduct a final acceptance inspection of the completed work. If the work is still satisfactory the bond or letter of credit shall be returned or allowed to expire, with a letter of final acceptance, less any amounts needed to complete specified activity not completed by permittee. (2) For any activity that does not involve material disturbance in the ROW, the director may waive the final acceptance inspection and any type of performance guaranty. (h) Traffic control. (1) Traffic control plan. When it is necessary to obstruct traffic, a traffic control plan shall be submitted to the city prior to starting any installation, repair, construction or excavation, except as provided in applicable provisions of the Manual on Uniform Traffic Control Devices or any successor publication thereto shall be used as a guide for all maintenance and construction signing. The permittee shall illustrate on the construction permit the warning and control devices proposed for use. At the direction of the director, such warning and control devices shall be modified. No construction permit will be issued until the plan is approved by the city which approval shall not be unreasonably withheld or denied. The permittee shall use extra care so as to minimize disruption to adjacent property and drives and to provide access to parking areas during the project. If access to private property must be blocked, then the permittee shall develop an access maintenance plan in coordination with and based on all reasonable requirements of the affected property owners and tenants, and submit it to the city. No permittee shall block access to and from side streets, alleys, maintenance roads, walkways, driveways, sidewalks, bike paths, fire hydrants, fire stations, fire escapes, mail boxes, dumpsters, parked vehicles, water valves, underground vaults, valve housing structures, or any other vital equipment unless the permittee demonstrates to the city that he/she has worked with the owner or occupant of the facility to minimize potential impacts. (2) Street closures. If a street closing is desired, the permittee will request the assistance and obtain the approval of the city. It shall be the responsibility of the permittee to develop a detour and signing plan, provide advance warning signs to advise drivers of the street closure and deliver notices to the affected properties a minimum of 48 hours prior to any street closure. The city may also require and the permittee shall agree to attend a public hearing regarding the street closure. It shall be the responsibility of the permittee to notify and coordinate all activity in the public way with police, fire, ambulance, other governmental entities, and transit organizations. (3) Flag persons. When necessary for public safety, the permittee shall employ flag persons whose duties shall be to control traffic around or through the construction site. The use of flag persons may be required by the director. (4) Acceptable hours of construction. Hours for all construction activity shall be performed in compliance with the traffic control permit for the flow of traffic on local, arterial or collector streets upon applicable conditions and restrictions. No construction activity shall be performed in the public way that involves activities that generate noise levels that constitute a public nuisance as defined in the noise control provisions of Section 38-441 without the approval of the director unless otherwise authorized by the city. (5) Traffic control devices. Effective work area traffic control must be provided for all street installation, repair, construction, excavation and maintenance in order to provide for the safety of the workers, vehicular users, and pedestrians. The type of traffic control should be selected based upon the type of roadway, traffic conditions, duration of operation, physical constraints, and the proximity of the activity to traffic. All traffic control devices and advance warning signs used shall conform to the applicable specifications in Part VI of the Manual on Uniform Traffic Control Devices. Traffic control devices are to be supplied by the permittee. If used at night, they must be reflectorized and must be illuminated or have barricade warning lights. (6) Prohibited methods of illumination. Oil flares or kerosene lanterns are not allowed as means of illumination. Nighttime work area flood lighting shall not be allowed to spill out of the construction area in such a way as to disturb, annoy, or endanger the comfort, health or peace of others. (7) Maintenance and construction signing. The contractor shall be responsible for maintaining all area signing and barricading during construction operations as well as any signs and barricades that are needed to protect roadway users and pedestrians during non-work hours. During non-work hours, all construction area signs that are not appropriate shall be removed, covered, or turned around so that they do not face traffic. Any deficiencies noted by the city shall be corrected immediately by the contractor. If contractor is not available or cannot be found, the city may make such corrections and the contractor shall pay the actual costs plus a penalty of 50 percent of the amount thereof. (8) Traffic control costs and responsibilities. All costs related to developing a project area traffic control plan, and implementing the traffic control plan, as well as maintaining the traffic control elements are the responsibility of the permittee.
(Ord. No. 2804, § 1, 10-28-03; Ord. No. 2935, § 1, 1-10-06; Ord. No. 3210, § 1, 9-11-12; Ord. No. 3257, § 3, 8-27-13; Ord. No. 3655, §§ 3, 4, 7-12-23; Ord. No. 3745, § 3, 8-26-25)
Ask a question about Thornton law
Corpus searches the Thornton sections it holds and shows the ones that match, with their citations. Free, no sign-in.