§ 2-276 — Minimizing the impacts of work in the ROW
Code of the City of Thornton, Colorado (Supp. No. 65: codified through Ordinance No. 3773, adopted June 9, 2026) · Thornton City Code § 2-276
Corpus is an independent public-information project, not the official City of Thornton website. Stable reference: corpuslaw.us/code/18bbade5-d20f-4739-a189-2ab1f607710f
Sec. 2-276. - Minimizing the impacts of work in the ROW.
(a) Notification association. Before placing any facilities or structures in the ROW, any provider shall become a member of the Utility Notification Center of Colorado (UNCC), and shall comply with all requirements provided in C.R.S. § 9-1.5 et seq. In addition, all persons moving, maintaining, construction, repairing or otherwise working on facilities in the ROW are responsible for making inquiries of all ditch companies, utility companies, districts, local government, and all other agencies that might have facilities in the area where construction is to occur to determine possible conflicts. (b) Field locates. All providers shall contact the UNCC and request field locations of all facilities in the area pursuant to UNCC requirements. Field locations shall be marked prior to commencing work and users shall support and protect all pipes, conduits, poles, wires, or other apparatus which may be affected by the work from damage during construction. (c) Noise, dust, debris, hours of work. Any person conducting work in the ROW shall do so in such a manner as to avoid unnecessary inconvenience and annoyance to the general public and occupants of neighboring property. In the performance of the work, all providers shall take appropriate measures to reduce noise, dust, and unsightly debris. No work shall be done between the hours of 9:00 p.m. and 6:00 a.m., except as authorized by the city with the written permission of the director or his/her designee, or in case of an emergency. Any entity with facilities in the ROW may undertake routine maintenance on existing facilities without obtaining written permission of the director providing: (1) The routine maintenance work does not involve any material disturbance of any public way infrastructure improvements. (2) The routine maintenance work does not involve any activities that generate noise levels that constitute a public nuisance as defined in the noise control provisions of the City Code. (d) Trash and construction materials. All providers shall maintain the work site so that: (1) Trash and construction materials are contained so that they are not blown off of the construction-site. (2) Trash is removed from a construction-site often enough so that it does not become a health, fire, or safety hazard. (3) Trash dumpsters and storage or construction trailers are not placed in the street without specific approval of the director. (e) Deposit of dirt and material on roadways. All providers shall utilize their best efforts to eliminate the tracking of mud or debris upon any street or sidewalk during the course of any construction activity. The requirements for tracking dirt or debris under the grading permit issued pursuant to Chapter 22, or as required by the Standards and Specifications shall remain in effect throughout all construction activity. (f) Protection of trees and landscaping. All providers shall use their best efforts to protect trees, landscape, and landscape features as required by the city. All protective measures shall be provided at the expense of the providers. If any providers cause damage to trees and other landscape features, then the providers shall be responsible for repairs and depending upon the extent of damage, the replacement of the landscape improvements. (g) Protection of paved surfaces from equipment damage. Backhoe equipment outriggers shall be fitted with rubber pads whenever outriggers are placed on any paved surface. Tracked vehicles that will damage pavement surfaces are not permitted on paved surfaces unless specific precautions are taken to protect the surface. All providers will be responsible for any damage caused to the pavement by the operation of such equipment and, shall repair such surfaces. Failure to do so will result in the use of the provider's performance/warranty guaranty by the city to repair any damage, and, possibly, the requirement of additional warrantee(s). (h) Protection of property. All users shall preserve private and public property and protect it from damage. All users shall, at its own expense, shore up and protect all buildings, walls, fences or other property likely to be damaged during the work, and shall be responsible for all damage to public or private property resulting from failure to properly protect and carry out work in the ROW. (i) Sanitary facilities. All providers shall provide necessary sanitary facilities for workers while operating in the ROW. (j) Clean up. As the work progresses, all ROW and private property shall be thoroughly cleaned of all gas and oil spills, rubbish, excess dirt, rock, and other debris resulting from permittee's work. All clean up operations shall be done at the expense of the providers. (k) Preservation of monuments. Providers shall not disturb or move any land monuments, property marks, or survey hubs and points that may interfere or be impacted by the proposed work, until their location has been witnessed or referenced in accordance with standard survey practices, or unless approval is obtained from the director. Any monuments, hubs, and points disturbed will be replaced by a Colorado Registered Land Surveyor at the provider's expense. (l) Construction vehicle parking. All providers shall make provisions for employee and construction vehicle parking so that neighborhood and business parking adjacent to a work site is not impacted. (m) Maintaining safe walkways. All providers shall maintain an adequate and safe unobstructed walkway around a construction-site in accordance with applicable city ordinances. In cases where the sidewalk must be blocked and pedestrian traffic must be routed around the work area, the providers shall provide adequate barricading and detour signing to protect and serve the pedestrians. Once a provider has occupied the ROW, it shall be the provider's responsibility to clear all snow and ice hazards from public sidewalks at the work site following a snowfall in conformance with applicable city ordinances.
(Ord. No. 2804, § 1, 10-28-03; Ord. No. 3257, § 6, 8-27-13)
Ask a question about Thornton law
Corpus searches the Thornton sections it holds and shows the ones that match, with their citations. Free, no sign-in.
