§ 2-277 — Standards for repairs and restoration
Code of the City of Thornton, Colorado (Supp. No. 65: codified through Ordinance No. 3773, adopted June 9, 2026) · Thornton City Code § 2-277
Corpus is an independent public-information project, not the official City of Thornton website. Stable reference: corpuslaw.us/code/05d3a947-ed36-42ac-b38d-8b7a83686ebe
Sec. 2-277. - Standards for repairs and restoration.
(a) Repairs and restoration. (1) Responsibility for work in ROW. Any provider shall be fully responsible for the cost and actual performance of all work in the ROW including but not limited to the costs associated with compaction testing. The providers shall do all work in conformance with the approved plans, any generally applicable engineering standards and the city's standards and specifications. These standards shall apply to all work in the ROW unless otherwise indicated in a construction permit. (2) Restoration of work site condition. All restoration shall result in a work site condition equal to or better than that which existed prior to construction. In addition to the regulations, specifications and standards concerning restoration, the following provisions shall apply to work in the ROW. a. Pavement cuts shall be back-filled with controlled density flow fill, either concrete or asphalt patches will be placed to match the existing street cross section. b. The new asphalt will be placed by the provider contracting with a reputable paving firm to complete the work to city standard. c. Concrete meeting the Standards and Specifications shall be used to replace concrete pavement wherever it occurs. d. Natural gas and electrical utilities when constructing gas or electrical line trenches may utilize alternative backfill material in lieu of flowable fill backfill material, provided that all of the following conditions are satisfied. 1. Prior to the issuance of a construction permit or any work in the ROW, permittee must request and receive approval for the use of alternative backfill material. 2. The type, gradation, placement, compaction, and testing of the alternative backfill material shall meet or exceed all requirements specified in design and Standards and Specifications. The costs associated with compaction testing shall be borne by the users. 3. Once the compacted backfill has been placed, an asphalt cutback shall be made. The cutback will extend six inches minimum on each side of the opening and will be over undisturbed pavement material (one and one-half inch deep minimum). All edges of the opening shall be neatly cut with an asphalt saw at 90 degrees to the roadway and uniformly tacked. (b) Construction and restoration standards for newly constructed or overlaid streets. No provider shall cause an open trench excavation or potholing of utilities in the pavement of any ROW for a period of at least one year from the completion of construction or resurfacing, unless authorized by the city. (1) Criteria for construction in new streets. No construction permit for excavation in the ROW of new streets shall be approved unless the director finds that all of the following criteria have been met: a. Boring or jacking without disturbing the pavement is not practical due to physical characteristics of the street or alley or other utility conflicts. b. Alternative utility alignments that do not involve excavating the street or alley are found to be impracticable. c. The proposed excavation cannot reasonably be delayed until after the two-year deferment period has lapsed. (2) Exemptions for emergency operations. For purposes of this section, Emergency repair operations shall be limited to circumstances involving the preservation of life, property, or conditions that result in an interruption in the provision of services to multiple customers. Persons with prior authorization from the city to perform emergency maintenance operations within the ROW shall be exempted from this section. Any user commencing operations under the laws of this section shall submit detailed engineering plans, construction methods and remediation plans no later than three working days after initiating the emergency maintenance operation. (3) Construction and restoration standards for newly constructed or overlaid streets and alleys. The streets shall be restored and repaired in accordance with the Standards and Specifications. (4) Exemptions for non-emergency operations. Any user may apply to the director for an exemption under this section when the construction is necessary in the public interest or to provide a public service. By way of example, but not by limitation, an exemption could be requested in order to provide services to a part of the city where no service would be available without construction. If a non-emergency exemption is granted to disturb a ROW within the two-year period, the director may, in his sole discretion, impose additional restoration requirements, including but not necessarily limited to, roto-milling and repaving of a larger area, such as an entire block in which the construction occurs.
(Ord. No. 2804, § 1, 10-28-03; Ord. No. 3257, § 7, 8-27-13; Ord. No. 3655, § 7, 7-12-23)
Ask a question about Thornton law
Corpus searches the Thornton sections it holds and shows the ones that match, with their citations. Free, no sign-in.