§ 9-43 — General provisions
Zoning Ordinances of the City of New Britain, Connecticut (Municode product) (Codified through Ordinance No. 36885-3, adopted October 21, 2025 (Supp. No. 6)) · New Britain Code of Ordinances § 9-43
Corpus is an independent public-information project, not the official City of New Britain website. Stable reference: corpuslaw.us/code/1f2c68bf-93ec-4846-87bf-eb615543a65f
Sec. 9-43. - General provisions.
(a) Lands to which this article applies. This article shall apply to all special flood hazard areas within the jurisdiction of City of New Britain. (b) Basis for establishing the special flood hazard areas. The areas of special flood hazard identified by the Federal Emergency Management Agency (FEMA) in its Flood Insurance Study (FIS) for Hartford County, Connecticut, dated May 16, 2017, and accompanying Flood Insurance Rate Maps (FIRM), dated May 16, 2017 (Panel 09003C0487G), and September 26, 2008 (Panels 09003C0479F, 09003C0483F, 09003C0484F, 09003C0489F, 09003C0491F, 09003C0492F, 09003C0493F, 09003C0494F) and other supporting data applicable to the City of New Britain, and any subsequent revisions thereto, are adopted by reference and declared to be part of this regulation. Since mapping is legally adopted by reference into this regulation, it must take precedence until such time as a map amendment or map revision is obtained from FEMA. The area of special flood hazard includes any area shown on the FIRM as zones A and AE, including areas designated as a floodway on the FIRM. Areas of special flood hazard are determined utilizing the base flood elevations (BFE) provided on the flood profiles in the flood insurance study (FIS) for a community. BFEs provided on a flood insurance rate map (FIRM) are approximate (rounded up or down) and should be verified with the BFEs published in the FIS for a specific location. The FIS and FIRM are on file at the office of Public Works, City Hall, 27 West Main Street, New Britain, Connecticut. (c) Establishment of floodplain management permit. A floodplain management permit shall be required in conformance with the provisions of this article prior to the beginning of any development activities on any property within or containing any areas designated as special flood hazard areas. (1) Permit expiration. Permits issued under this article shall expire if the permitted activity does not begin within ninety (90) days of the permit approval date. (d) Compliance. No structure or land within a special flood hazard area shall hereafter be located, developed, constructed, extended, converted, modified, or structurally altered without full compliance with the terms of this article and other applicable regulations. (e) Abrogation and greater restrictions. This article is not intended to repeal, abrogate, or impair any existing easements, covenants, or deed restrictions. However, where this article and another conflict or overlap, whichever imposes the more stringent restrictions shall prevail. (f) Interpretation. In the interpretation and application of this article all provisions shall be: (1) Considered as minimum requirements; (2) Liberally construed in favor of the governing body; and (3) Deemed neither to limit nor repeal any other powers granted under state statutes. (g) Warning and disclaimer of liability. The degree of flood protection required by this article is considered the minimum reasonable for regulatory purposes and is based on scientific and engineering consideration. Larger floods can and will occur on rare occasions. Flood heights may be increased by man-made or natural causes. This article does not imply that land outside the special flood hazard areas or uses permitted within such areas will be free from flooding or flood damages. This article shall not create liability on the part of City of New Britain or by any officer or employee thereof for any flood damages that result from reliance on this article or any administrative decision lawfully made thereunder. The City of New Britain, its officers and employees shall assume no liability for another persons reliance on any maps, data, or information provided by the city. Notwithstanding the preceding disclaimer, the city shall assume normal responsibilities in indemnifying its public officials and citizen board members for "good faith" decisions made on their part in carrying out the duties of their positions. (h) Aboveground oil tanks. Aboveground storage tanks (oil, propane, etc.) which are located outside or inside of the structure must either be elevated above the base flood elevation (BFE) on a concrete pad, or be securely anchored with tie-down straps to prevent flotation or lateral movement, have the top of the fill pipe extended above the BFE, and have a screw fill cap that does not allow for the infiltration of flood water. (i) Compensatory storage. The water holding capacity of the floodplain, except those areas that are tidally influenced, shall not be reduced. Any reduction caused by filling, new construction, or substantial improvements involving an increase in footprint to the structure shall be compensated for by deepening and/or widening of the floodplain. Storage shall be provided on-site, unless easements have been gained from adjacent property owners; it shall be provided within the same hydraulic reach and a volume not previously used for flood storage; it shall be hydraulically comparable and incrementally equal to the theoretical volume of flood water at each elevation, up to and including the 100-year flood elevation, which would be displaced by the proposed project. Such compensatory volume shall have an unrestricted hydraulic connection to the same waterway or water body. Compensatory storage can be provided off-site if approved by the municipality. (j) Equal conveyance. Within the floodplain, except those areas which are tidally influenced, as designated on the Flood Insurance Rate Map (FIRM) for the community, encroachments resulting from filling, new construction or substantial improvements involving an increase in footprint of the structure, are prohibited unless the applicant provides certification by a registered professional engineer demonstrating, with supporting hydrologic and hydraulic analyses performed in accordance with standard engineering practice, that such encroachments shall not result in any (0.00 feet) increase in flood levels (base flood elevation). Work within the floodplain and the land adjacent to the floodplain, including work to provide compensatory storage shall not be constructed in such a way so as to cause an increase in flood stage or flood velocity. (k) No structures entirely or partially over water. New construction, substantial improvements and repair to structures that have sustained substantial damage cannot be constructed or located entirely or partially over water. (l) Portion of structure in flood zone. If any portion of a structure lies within the Special Flood Hazard Area (SFHA), the entire structure is considered to be in the SFHA. The entire structure must meet the construction requirements of the flood zone. The structure includes any attached additions, garages, decks, sunrooms, or any other structure attached to the main structure. Decks or porches that extend into a more restrictive flood zone will require the entire structure to meet the standards of the more restrictive zone. (m) Structures in two flood zones. If a structure lies within two (2) or more flood zones, the construction standards of the most restrictive zone apply to the entire structure (i.e., V zone is more restrictive than A zone; structure must be built to the highest BFE). The structure includes any attached additions, garages, decks, sunrooms, or any other structure attached to the main structure. (Decks or porches that extend into a more restrictive zone will require the entire structure to meet the requirements of the more restrictive zone.) (n) Severability. If any section, subsection, paragraph, sentence, clause, or phrase of this article should be declared invalid for any reason whatsoever, such decision shall not affect the remaining portions of this article, which shall remain in full force and effect; and to this end the provisions of this article are hereby declared to be severable.
(Ord. of 1-95; Ord. of 2-4-98; No. 26824-1, 2-27-02; Res. No. 30107-2, 5-28-08; Res. No. 33843-2, 5-15-17)
Ask a question about New Britain law
Corpus searches the New Britain sections it holds and shows the ones that match, with their citations. Free, no sign-in.
