For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 9-44 — Administration

Zoning Ordinances of the City of New Britain, Connecticut (Municode product) (Codified through Ordinance No. 36885-3, adopted October 21, 2025 (Supp. No. 6)) · New Britain Code of Ordinances § 9-44

Corpus is an independent public-information project, not the official City of New Britain website. Stable reference: corpuslaw.us/code/032add07-3525-4b29-8dae-f6e4789f4c7a

Sec. 9-44. - Administration.

(a) Designation of the article administrator. The city engineer is hereby appointed to administer, implement and enforce the provisions of this article. (b) Certification. Where required under this article, a registered professional engineer or architect shall certify that the design and methods of construction are in accordance with accepted standards of practice for meeting the provisions of this article. Such certification must be provided to the city engineer. (c) Permit procedures. For any development activity on properties which are within or which contain a special flood hazard area, an application for a floodplain management permit shall be made to the city engineer on forms furnished by him or her prior to any development activities. Information which shall be required along with such applications shall include, but is not limited to, five (5) copies of all plans showing property boundaries, existing and proposed conditions, including all buildings and structures, grading, contours, storage of materials, drainage facilities, fences, parking and driveways, and sidewalks. Specifically, the following information is required: (1) Application stage. Where applicable, certifications by a registered surveyor, professional engineer or architect are required, and must be provided to the city engineer. The design and methods of construction must be certified to be in accordance with accepted standards of practice, and with the provisions of subsections 9-45(c), (d), and 9-46 of this article. Certifications by registered surveyors, professional engineers or architects are required for all items listed below: a. Elevation in relation to mean sea level and base flood level of the proposed lowest floor (including basement) of all structures; b. Elevation in relation to mean sea level and base flood level to which any nonresidential structure will be floodproofed; c. Description of the extent to which any watercourse will be altered or relocated as a result of proposed development; d. A statement as to whether or not the proposed alterations to an existing structure meets the criteria of the substantial improvement definition; e. A statement as to whether there will be dry access to any part of the structure during the 100-year storm event; f. That the use of floodproofing for nonresidential structures, as required by subsection 9-45(c)(1)b.(ii) of this article, has been met; g. That all provisions governing fully enclosed areas below base flood elevations, as required by section 9-45 of this article, have been met; h. That the floodway standards of subsection 9-45(c)(3) of this article have been met. (No increase in floodway heights shall be permitted.) (2) Construction stage. Upon completion of the applicable portion of construction, the applicant shall provide verification with appropriate certifications by a registered surveyor, professional engineer to the city engineer of the following: a. For structures in Zone A1-30 the elevation of the top of the lowest floor, including basement, in accordance with the standards of subsection 9-45(c)(3)a. b. For nonresidential floodproofed structures the elevation to which the floodproofing is effective and certified that construction is in conformance with the standards of subsection 9-45(c)(1)b.(i). (3) Compliance. Deficiencies detected by the review of the lowest floor elevations and/or floodproofing shall be corrected by the permit holder immediately and prior to any further work being permitted to proceed. Failure to submit the survey or failure to make said corrections required hereby, shall be cause to issue a stop-work order for the project. (4) Bond and insurance. Upon the approval of the application and prior to the issuance of a floodplain management permit, the applicant may be required to post a performance bond to ensure that all filling, grading, construction, relocation or alteration of a watercourse, placing of structures, etc., is done in accordance with the approved development plans and in compliance with the applicable provisions of subsections 9-45(a), (b) and (c). a. The bond amount shall be commensurate to the cost of removing all new fill and materials and restoring the topography of the site to predevelopment conditions and stabilizing the site through appropriate revegetation. Such cost estimate shall be calculated and certified by the applicant's engineer and subject to review and approval by the city engineer. b. The bond shall be posted in the form of a certified check, which shall be executed by the city treasurer's office and deposited into an escrow account, pending satisfactory completion of all development activities. c. Such a bond shall be required in all instances involving development activities taking place within a floodway, per subsection 9-45(c)(3) of this article, activities which alter or relocate a watercourse, and for all activities permitted by variance per section 9-47 of this article. Additionally, at the discretion of the city engineer, such a bond may also be required in instances where development or filling activities in A zones are projected to increase base flood elevations more than one-half foot, but less than one foot. (d) Duties and responsibilities of the city engineer and other city officials. In the administration of this article, the duties of the city engineer shall include, but not be limited to: (1) Application stage: All applications for building permits shall be reviewed by the city engineer to determine if the proposed activity contains, or is within, a special flood hazard area. Duties of the city engineer shall include: a. Review all floodplain management permit applications to determine whether proposed building sites will be reasonably safe from flooding. b. Review all floodplain management permit applications and permits to assure that the permit requirements of this article have been satisfied. c. Advise permittee that additional federal, state or city permits may be required, and if specific federal, state or city permit requirements are known, require that copies of such permits be provided and maintained on file with the floodplain management permit. Permits possibly required include, but are not limited to: Water Diversion, Dam Safety, Army Corps of Engineers Sections 401 and 404 and Stream Channel Encroachment Line Permits, as well as local inland/wetlands and watercourses permits. It shall be the responsibility of the permittee to seek and obtain all other necessary permits, approvals, licenses, certificates, etc., as may be required by applicable city, state or federal agencies, prior to conducting any activity regulated under this article. A permit issued pursuant to these regulations does not confer or imply approval of the activity by any other agency of the city, state or federal government. d. The city engineer shall inform the conservation commission and director of public works of the submission of an application for a floodplain management permit for any proposed relocation or alteration of any watercourse. No such relocation or alteration is to be permitted unless it is satisfactorily shown that the flood-carrying capacity of the watercourse is not diminished. e. The city engineer shall notify adjacent communities and the Department of Environmental Protection, Division of Water Resources, prior to the approval of any permit for the alteration or relocation of a watercourse and submit evidence of such notification to the Federal Emergency Management Agency (FEMA). f. The city engineer shall require and administer the performance bonds posted in accordance with subsection 9-44(c)(4) of this article. (2) Construction stage: a. The city engineer shall review all data submitted pursuant to subsection 9-44(c) and record the elevation (in relation to mean sea level) of the lowest floor (including basement) of all new or substantially improved structures, in accordance with subsection 9-45(c)(1)a. b. When floodproofing is utilized for a particular nonresidential structure the city engineer shall obtain and record the elevation (in relation to mean sea level) to which the new or substantially improved structures have been floodproofed, and the elevation certification from a registered professional engineer or architect, in accordance with subsection 9-45(c)(1)b.(ii). c. The city engineer shall notify the permit holder and the chief building inspector if deficiencies in the lowest floor elevations and/or floodproofing are identified and shall order the permit holder to correct the deficiencies prior to further progressive work being permitted to proceed. (3) Miscellaneous duties and responsibilities: a. In instances where base flood elevation and/or floodway data is not otherwise available, the city engineer shall obtain, review and reasonably utilize any base flood elevation and floodway data available from a federal, state or other sources and determine and verify the base flood elevation for the flood hazard area, in order to administer subsections 9-45(c)(1), (2), (3) and section 9-46. b. The city engineer shall notify the regional planning agency and any affected municipality at least thirty-five (35) days prior to the public hearing if any change of regulation or use of a flood zone will affect an area within five hundred (500) feet of another municipality. c. The city engineer shall maintain all records pertaining to the provisions of this article. d. The city engineer shall be responsible for taking enforcement actions as appropriate, pursuant to the guidelines of section 9-49. (4) Subdivision of land. The city plan commission is responsible for the review and approval of all subdivision or resubdivisions of land and for the enforcement of the subdivision regulations of the City of New Britain. The director of Municipal Development shall require that all subdivisions which involve special flood hazard areas provide such information and professional certifications, as required to ensure that the provisions of sections 9-45 and 9-46 are met.

(Ord. of 1-95; Ord. of 2-4-98; No. 26824-1, 2-27-02)

Ask a question about New Britain law

Corpus searches the New Britain sections it holds and shows the ones that match, with their citations. Free, no sign-in.