For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 9-45 — Provisions for flood hazard reduction

Zoning Ordinances of the City of New Britain, Connecticut (Municode product) (Codified through Ordinance No. 36885-3, adopted October 21, 2025 (Supp. No. 6)) · New Britain Code of Ordinances § 9-45

Corpus is an independent public-information project, not the official City of New Britain website. Stable reference: corpuslaw.us/code/2b24752a-c3cb-40cb-868c-1e260ee56e3c

Sec. 9-45. - Provisions for flood hazard reduction.

(a) General standards. In all special flood hazard areas, the following provisions are required: (1) New construction and substantial improvements shall be anchored to prevent flotation, collapse or lateral movement of the structure resulting from hydrodynamic and hydrostatic loads, including the effects of buoyancy; (2) New construction and substantial improvements shall be constructed with materials resistant to flood damage; (3) New construction or substantial improvements shall be constructed using methods and practices that minimize flood damage; (4) Electrical, heating, ventilation, plumbing, air conditioning equipment, and other service facilities shall be designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding; (5) New and replacement water supply systems shall be designed to minimize or eliminate infiltration of floodwaters into the system; (6) New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of floodwaters into the system and discharges from the system into floodwaters; (7) On-site waste disposal systems shall be located and constructed to avoid impairment to them or contamination from them during flooding; (8) In any portion of a watercourse which is altered or relocated the flood-carrying capacity shall be maintained; (9) Accessory structures shall be subject to all the standards in subsections (a), (b) and such standards of subsection (c) as deemed necessary by the city engineer. For the purpose of determining "substantial improvement" the value of each accessory building shall be considered individually; (10) Manufactured homes shall be prohibited in all special flood hazard areas; (11) Parking or storage of recreational vehicles shall be prohibited in all special flood hazard areas; (12) A structure already in compliance with the provisions of this article shall not be made noncompliant by any alteration, repair, reconstruction or improvement to the structure. (b) General standards for streams without established base flood elevations, floodways and/or mapping: (1) The city engineer shall obtain, review and reasonably utilize any base flood elevation and floodway data available from a federal, state or other source, including data developed pursuant to subsection 9-44(d)(3)a. of this article, as criteria for requiring that new construction, substantial improvements, or other development in a special flood hazard area on the community's FIRM meet the standards in subsection (c) and section 9-46. (2) Base flood elevation data shall be provided with any application for activity in a special flood hazard area. (3) In special flood hazard areas where base flood elevations have been determined, but before a floodway is designated, no new construction, substantial improvement, or other development (including fill) which will increase base flood elevations more than one foot at any point along the watercourse shall be permitted. All anticipated development within a special flood hazard area is to be considered cumulatively with the proposed development in estimating the impact of the action on the base flood elevation. (4) The city engineer may request floodway data of any applicant for activities within watercourses without FEMA-published floodways. When such data is provided by an applicant or when additional data becomes available allowing the establishment of floodways along watercourses on which no floodways are currently delineated, new floodways shall be adopted. Then development affecting such floodways shall be regulated on the principle that the floodway must be able to convey the waters of the base flood without increasing the water surface elevation more than one foot at any point along the watercourse. (5) The city engineer shall obtain, review and reasonably utilize any base flood elevation and floodway data available from a federal, state or other source as criteria of requiring that new construction, substantial improvements or other development in any area of potential demonstrable or historic flooding within New Britain meet the standards of subsection (c). (c) Specific standards: (1) Construction standards. In all special flood hazard areas A1-30, AH, and AO, where base flood elevation data has been provided, as set forth in subsections 9-43(b), 9-44(d)(2), 9-45(b)(5), the following provisions are required: a. Residential construction: New construction or substantial improvement of any residential structure shall have the lowest floor, including basement, elevated at least two (2) feet above the base flood elevation. b. Nonresidential construction: (i) New construction or substantial improvement of any commercial, industrial, or nonresidential structure shall have the lowest floor, including basement, elevated at least to two (2) feet above the level of the base flood elevation. (ii) Nonresidential structures may be floodproofed in lieu of being elevated, provided that, together with all attendant utilities and sanitary facilities, the areas of the structure below the required elevation are watertight, with walls substantially impermeable to the passage of water, and provided that such structures are composed of structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A registered professional engineer or architect shall review and/or develop structural design, specifications, and plans for the construction, and shall certify that the design and methods of construction are in accordance with acceptable standards of practice for meeting the provisions of this subsection. Such certification shall be provided to the city engineer. (iii) On-site drainage for all proposed structures in zones AO and AH located on slopes shall provide adequate drainage paths to guide floodwaters around and away from such structures. (2) Fully enclosed areas below base flood elevation. New construction or substantial improvements of buildings that include fully enclosed areas formed by foundation and other exterior walls below the base flood elevation shall have at least one side at or above grade and shall be designed to preclude finished living space and designed to allow for the entry and exit of floodwaters to automatically equalize hydrostatic flood forces on exterior walls. a. Designs for complying with this requirement must be certified by a registered professional engineer or architect to meet the following minimum criteria: (i) Provide a minimum of two (2) openings having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding; (ii) The bottom of all openings shall be no higher than one foot above grade; and (iii) Openings may be equipped with screens, louvers, valves or other coverings or devices provided they permit the automatic flow of floodwaters in both directions. b. Electrical, plumbing, and other utility connections are prohibited below the base flood elevation. c. Use of the enclosed area shall be restricted to the parking of vehicles or limited storage of maintenance equipment used solely in connection with the premises or entry to the living area via stairway or elevator. (3) Floodways. Located within special flood hazard areas established in subsection 9-43(b) are areas designated as floodways on the community's flood boundary and floodway map. Since the floodway is an extremely hazardous area due to the velocity of floodwaters which carry debris and potential projectiles, and have erosion potential, the following provisions shall apply: a. All encroachments are prohibited including fill, new construction, substantial improvements and other developments unless certification (with supporting technical data) by a registered professional engineer is provided demonstrating that encroachments shall not result in any increase in flood levels during occurrence of the base flood discharge; b. Fences are prohibited in the floodway unless aligned in the direction of the flow and constructed of an open design; c. A permit may be issued which allows encroachments resulting in increases in base flood elevations, provided the community first obtains a conditional floodway revision by meeting the requirements of C.F.R. 44, chapter 1, subsection 65.12.

(Ord. of 1-95; Ord. of 2-4-98; No. 26824-1, 2-27-02)

Ask a question about New Britain law

Corpus searches the New Britain sections it holds and shows the ones that match, with their citations. Free, no sign-in.