For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 9-49 — Enforcement

Zoning Ordinances of the City of New Britain, Connecticut (Municode product) (Codified through Ordinance No. 36885-3, adopted October 21, 2025 (Supp. No. 6)) · New Britain Code of Ordinances § 9-49

Corpus is an independent public-information project, not the official City of New Britain website. Stable reference: corpuslaw.us/code/df0af245-ac89-4440-a817-c718830a561f

Sec. 9-49. - Enforcement.

(a) Each floodplain management permit shall authorize, as a condition of approval, the city engineer or a designated agent to make regular inspections of the subject property. The city engineer or designated agents are also authorized to inspect any property in a special flood hazard area where it appears that violations of these regulations may be taking place. (b) If the city engineer finds that any person is undertaking any construction, substantial improvement, filling, or any other activity or maintaining a condition which in violation of these regulations, the city engineer shall: (1) Issue a written order by certified mail, return receipt requested, to the subject property owner, ordering that the activity cease and ordering the property owner to either seek to obtain a floodplain management permit pursuant to subsection 9-44(c) prior to continuing with the activity or, if appropriate, ordering that all violations and/or obstructions be removed from the special flood hazard area immediately. (2) Notify the chief building inspector and request that any building permit(s) in force be revoked or suspended and that a stop work order be issued. (3) The city engineer may suspend or revoke a floodplain management permit if it is found that the applicant has not complied with the terms, conditions or limitations set forth in the permit or has exceeded the scope of the work as set forth in the application including application plans. Prior to revoking any permit, the city engineer shall issue notice to the permittee, personally or by certified mail, return receipt requested, setting forth the facts or conduct which warrants the intended action. (4) Failure to comply with any written order issued under this section shall be considered a violation of these regulations and is subject to the penalties described in section 9-50. (5) In the event violations or obstructions are not promptly removed from the special flood hazard area, the city engineer may cause such removal and remediation work to be performed utilizing bond money held in escrow pursuant to subsection 9-44(c)(4) of this article, or may direct the director of public works to cause such work to be done and to place a lien against the property. (c) Any person subjected to enforcement action pursuant to this article may appeal any requirement, decision, or determination of the city engineer to the flood and erosion control board, in accordance with subsection 9-47(a)(2) of the article. Such person shall provide such information as necessary including appropriate certifications from a registered professional engineer or architect in order to substantiate the claim that the requirement, decision, or determination of the city engineer was in error or unwarranted. (d) Nothing contained herein shall prevent the owner of a dwelling, commercial or industrial building existing at the time of the adoption of this article from repairing, replacing or restoring said building or the components thereof to substantially the same character and form as existed at the time of such adoption.

(Ord. of 1-95; Ord. of 2-4-98)

Ask a question about New Britain law

Corpus searches the New Britain sections it holds and shows the ones that match, with their citations. Free, no sign-in.