Sec. 19-156. - Required inspections.

The building official, upon notification from the permit holder, shall make the following inspections and such other inspections the building official deems necessary, and shall either approve that portion of the construction or shall notify the permit holder of any violations which must be corrected in order to comply with the building code. The building official shall determine the timing and sequencing of when inspections occur and what elements are inspected at each inspection. A complete survey or special purpose survey may be required before an inspection is approved. (1) Building inspections. (a) Foundation. Such inspection shall be made after trenches are excavated and forms erected and required reinforcing steel is in place and, shall at a minimum, include the following building components: 1. Stem-wall; 2. Monolithic slab-on-grade; 3. Pilings and pile caps; and 4. Footings/grade beams. (b) Slab/floor. Concrete slab and under-floor inspections shall be made after in-slab or under-floor reinforcing steel or framing members installed and all building service equipment, conduit, piping accessories and other ancillary equipment items are in place, but before any concrete is placed or floor sheathing installed, including the subfloor. 1. Foundation/form board/stem wall survey. Prior to the slab inspection, the permit holder shall file with the building official a certified scaled drawing prepared, sealed and signed by a land surveyor registered in the state, showing all property lines; the setback distances from each property line to the foundation, stem walls or sills of the structure under construction; the location of any recorded easements within the property lines and the actual elevation of the foundation, stem walls or sills; and the final elevation of the ground floor for comparison with the required minimum ground floor elevation as shown on the approved drawings. The foundation/form board/stem wall survey shall be approved by the city and the permit holder so notified prior to the permit holder proceeding with the work. Any deviations from or violations of this chapter or other applicable codes and ordinances of the city shall be corrected by the permit holder before construction may proceed. 2. In flood hazard areas, upon placement of the lowest floor, including the basement, and prior to further vertical construction, the required elevation certification shall be submitted to the city. (c) Column/tie beam/masonry unit/lintel. Inspections shall be required after masonry units, forms, reinforcing steel, shoring, conduit, piping accessories, and other ancillary equipment items are in place, but before any concrete is placed. (d) Sheathing. Inspections shall be made after all roof and wall sheathing and fasteners are complete and shall, at a minimum, include the following building components: 1. Roof sheathing; 2. Wall sheathing; 3. Floor sheathing; 4. Sheathing fasteners (sheathing fasteners installed and found to be missing the structural member (shiners) shall be corrected prior to installation of the dry-in material); 5. Gypsum board, as required; and 6. Cladding. (e) Framing. Inspections shall be made after the roof deck or sheathing, all framing, fire blocking and bracing are in place, all concealed wiring, all pipes, chimneys, ducts and vents are complete, and shall, at a minimum, include the following building components: 1. Window/door framing and installation (verification that rough opening dimensions are within tolerances, installation of buck and attachments); 2. Lintel/tie beam installation, if applicable; 3. Framing/trusses/bracing/connectors (including truss layout drawings); 4. Draft stopping/fire blocking; 5. Curtain wall framing; 6. Fire resistant assemblies, joints and penetrations, as required; and 7. Accessibility. (f) Roofing. Inspections shall, at a minimum, include the following building components: 1. Dry-in; 2. Insulation; 3. Roof coverings (including in-progress); and 4. Flashing. (g) Energy insulation, thermal and ignition barrier. (h) Lath/drywall. Inspections shall be made after interior and exterior lathing and gypsum board is in place, but before any plastering is applied or gypsum board joints and fasteners are taped and finished. (i) Final. Inspection shall be made upon completion of the building or structure when ready for occupancy. 1. Lowest floor elevation. Prior to the final inspection, and where the work is completed in special flood hazard areas, the permit holder shall submit a final certification of the lowest floor elevation to the city. (2) Electrical inspections. (a) Underground and under concrete slab. Inspections shall be made after trenches or ditches are excavated, conduit or cable is installed, and before any backfill is put in-place. (b) Grounding electrode system. Inspections shall be made of all concrete encased electrodes, including the grounding electrode conductor connections for reinforcing steel in the building or structure foundation, and all other grounding electrodes required to be part of the grounding electrode system in accordance with Chapter 27 of the FBC, including all bonding of metal fittings, raceways, boxes, enclosures and equipment. (c) Rough-in. Inspections shall be made of all conduits, cables, feeder(s) and branch circuit wiring after the building is dried-in, framing, fire-blocking and bracing is in place, and prior to the installation of insulation (if applicable), or wall or ceiling membranes. (d) Service equipment, transformers and sub-panels. Inspections shall be made of all service equipment, transformers, electrical feeders and branch circuits, including all grounding and bonding, prior to requesting an electrical temporary testing inspection. Any electrical service, transformers, electrical feeder or electrical branch circuit exceeding 600 volts RMS shall be performance tested by a third-party testing firm approved by the building official and such report shall be made available to the building official and be approved prior to the electrical service, electrical feeder or electrical branch circuit being energized. (e) Low voltage. Inspections shall be made for security, fire alarm, elevator and special uses wiring after the building is dried-in, framing, fire-blocking and bracing is in place, and prior to the installation of insulation (if applicable), or wall or ceiling membranes. (f) Electrical temporary testing. Inspections shall be made of all electrical services, electrical feeders or branch circuits being energized by the permit holder prior to the final electrical inspection and shall be approved by the building official prior to energizing any power wiring, devices, luminaires or equipment in any building or structure. (g) Final. Inspections shall be made after the building or structure is completed, all required electrical fixtures and devices are in place and properly connected or protected, and the building or structure is ready for occupancy. (3) Plumbing inspections. (a) Underground and under concrete slab. Inspections shall be made after trenches or ditches are excavated, piping is installed, and before any backfill or concrete is put in place. (b) Pressure testing. Inspections shall be made of all potable water, waste, sewer and vent piping during underground and rough-in stage of construction to verify all pressure and performance tests are in compliance with Section 312 of the Florida Building Code, Plumbing. (c) Rough-in. Inspections shall be made after the roof, framing, fire blocking and bracing is in place and all soil, waste and vent piping is complete, and prior to the installation of insulation (if applicable), or wall or ceiling membranes. (d) Medical gas. Inspections shall be made of all storage tanks, piping and equipment of any medical gas system installed in any building or structure. (e) Final. Inspections shall be made after the building or structure is completed, all plumbing fixtures are in place and properly connected, and the building or structure is ready for occupancy. (4) Mechanical inspections. (a) Underground and under concrete slab. Inspections shall be made after trenches or ditches are excavated, underground duct and fuel piping is installed, and before any backfill is put in place. (b) Fuel oil. Inspections shall be made of all fuel oil piping in accordance with NFPA 31. (c) Rough-in. Inspections shall be made after the building is dried-in, framing, fire blocking and bracing are in place and all ducting, and other concealed components are complete, and prior to the installation of insulation (if applicable), or wall or ceiling membranes. (d) Final. Inspections shall be made after the building or structure is completed, the mechanical system is in place and properly connected, and the building or structure is ready for occupancy. Prior to the final inspection, the permit holder shall remit to the city a copy of the test and balance report. (5) Gas inspections. (a) Rough piping. Inspections shall be made after all new piping authorized by the permit has been installed, and before any such piping has been covered or concealed or any fixtures or gas appliances have been connected. (b) Final piping. Inspections shall be made after all piping authorized by the permit has been installed and after all portions which are to be concealed by plastering or otherwise have been so concealed, and before any fixtures or gas appliances have been connected. Such inspection shall include a pressure test. (c) Final. Inspections shall be made on all new gas work authorized by the permit and such portions of existing systems as may be affected by new work or any changes to ensure compliance with all the requirements of this building code and to ensure that the installation and construction of the gas system is in accordance with reviewed plans. (6) Demolition inspections. (a) Final. Inspections shall be made after all utility connections have been disconnected and secured and all demolition work is completed. (7) Manufactured building inspections. (a) The city shall inspect construction of foundations; connection of buildings to foundations; installation of parts identified on plans as site-installed items, joining the modules, including utility crossovers; utility connections from the building to utility lines on site; and any other work performed on site which requires compliance with the building code. Additional inspections may be required for public educational facilities pursuant to Section 453.27.20, Florida Building Code. (b) Where impact-resistant coverings or impact-resistant systems are installed to meet requirements of this building code, the building official shall schedule adequate inspections of impact-resistant coverings or impact-resistant systems to determine the following: 1. The system indicated on the plans is installed; and 2. The system is installed in accordance with the manufacturer's installation instructions and the product approval. (8) Swimming pool and spa inspections. (a) Initial. Inspections shall be made after excavation and installation of reinforcing steel, electrical boding and main drain, prior to placing of the concrete shell. (b) Underground piping. Inspections shall be made of circulation piping installation, including all required pressure testing, before any backfill is put into place. (c) Underground electrical. Inspections shall be made of electrical conduit, wiring, cables and underground boxes, before any backfill is put into place. (d) Underwater luminaires and audio systems. Inspections shall be made of any underwater luminaires and audio systems installed in pools and spas to verify each system is grounded and do not exceed the low voltage contact limit as defined in the National Electrical Code, Article 680.2. (e) Final electrical inspection. Inspections shall be made after the pool or spa is completed, all required electrical fixtures and devices are in place and properly connected or protected, prior to the pool or spa being fill with water in accordance with Sections 454.2.19 and R4501.19, Florida Building Code. (f) Permanent barrier. (g) Final. Inspections shall be made when the swimming pool is completed and all required enclosure requirements are in place. A residential swimming pool shall meet the requirements relating to pool safety features as described in Section 454.2.17, Florida Building Code.

(Ord. No. 5455, § 2, 5-22-18)

Ask a question about Boca Raton law

Corpus searches the Boca Raton sections it holds and shows the ones that match, with their citations. Free, no sign-in.