For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 19-162 — Building recertification inspection program

Code of Ordinances, City of Boca Raton, Florida (Supp. 72 Update 2: codified through Ordinance of June 9, 2026 (online updated October 20, 2026)) · Boca Raton Code of Ordinances § 19-162

Corpus is an independent public-information project, not the official City of Boca Raton website. Stable reference: corpuslaw.us/code/66cff6ba-bb69-42ff-ae78-1a43dbc8347f

Sec. 19-162. - Building recertification inspection program.

(1) In general. (a) The following words, terms and phrases, when used in this section, shall have the meanings ascribed to them in this subsection (a), except where the context clearly indicates a different meaning: "Building age" shall mean the time period since the issuance of a certificate of occupancy or, where adequate records are not available to determine when a certificate of occupancy was issued, shall be determined by the building official based on the best available evidence. "Owner" shall mean the fee simple title holder of the land on which a building subject to recertification is situated or, in the case of condominium or cooperative type of ownership, shall mean the person or entity responsible for the structure and common systems of a building subject to recertification. "Threshold building" shall mean any building which is greater than 3 stories or 50 feet in height, or which has an assembly occupancy classification as defined in the Florida Building Code which exceeds 5,000 square feet in area and an occupant content of greater than 500 persons. (b) Any building, that meets the following criteria shall be subject to recertification as provided in this section. 1. Is either (i) a threshold building (excluding detached 1-family and 2-family dwellings), or (ii) is a condominium property (as defined in F.S. § 718.103) or cooperative property (as defined in F.S. § 719.103) that is 3 stories or more in height; and 2. Has a building age of 30 years or more or, in the case of a condominium or cooperative property, is located within 3 miles of a coastline (as defined in F.S. § 376.031) and has a building age of 25 years or more. Subsequent recertification shall be required at intervals of 10 years beginning on the date the first such recertification was required. (c) In addition to the requirements set forth in this section, the building official shall issue specific guidelines and criteria for the building recertification inspection program and the program's applicable inspections and report(s), which shall be mandatory. (d) Beginning on August 24, 2021 (effective date of Ordinance No. 5589), due to the initial backlog of buildings required to be recertified, the building official shall establish a completion schedule for recertification, which shall be based upon factors that may include, but shall not be limited to, the age, location, construction materials, occupancy load, and function of a building. This completion schedule so established shall include a recertification deadline for each building for which recertification is required. (e) Nothing in this section shall be construed to prevent or limit the building official's authority to inspect, order inspections or reports, or abate unsafe conditions at existing buildings outside of the requirements of this section, including, but not limited to, the building official's authority pursuant to section 19-155, article VII of this chapter, and any provision in the Code of Ordinances. (f) Reports and other information received by the city in connection with the building recertification inspection program shall be available to the public consistent with the requirements of the Public Records Act (F.S. ch. 119). (2) Procedure. (a) The building official shall issue a notice of required inspection, via certified mail, to the owner of each building required to be recertified pursuant to subsection (1) above, not less than 365 days prior to the scheduled deadline for recertification, and may provide such additional notice as the building official deems appropriate and useful. In the event that the notice of required inspection is returned unclaimed, said notice shall be posted by the building official at the building. (b) The owner of a building or structure subject to recertification shall submit, or cause to be submitted, to the building official, no later than the recertification deadline, a written recertification inspection report ("report"), which shall include: 1. A report prepared by a professional engineer registered in the State of Florida and qualified by training and experience as a structural engineer (hereinafter "structural engineer"). Such report shall bear the name, business address, State of Florida registration number, and impressed seal and signature of the responsible structural engineer who has performed the inspection, and shall be in conformance with the standards for such report otherwise set forth in this section and any additional requirements established by the building official pursuant to subsection (1)(c) of this section. 2. A report prepared by a professional engineer registered in the State of Florida and qualified by training and experience as an electrical engineer (hereinafter "electrical engineer"). Such report shall bear the name, business address, State of Florida registration number, and impressed seal and signature of the responsible electrical engineer who has performed the inspection, and shall be in conformance with the standards for such report otherwise set forth in this section and any additional requirements established by the building official pursuant to subsection (1)(c) of this section. (c) The report shall note the location address and property control number of the building, describe the type of construction and general characteristics of the building (including, but not limited to, total floor area, height and number of stories, building footprint and similar characteristics), the existence of drawings and location thereof, history of the building to the extent reasonably known, and describe the type and manner of the inspection, noting areas any issues of concern. The report shall affirmatively identify the inspection methods used (e.g., visual examination, laboratory study/testing, load testing and manual/forensic), the inspection methods that were not used, the reason(s) each inspection method was used or was not used, any limitations associated with the inspection method(s) used, and any structural systems or components that were not inspected and the reason why such inspection did not take place. Generally, the inspection shall begin with less disruptive/destructive methods, with more disruptive/destructive methods being employed progressively based on the findings of each method. The use of each structural inspection method used shall be documented by photographic or other similar documentation that visually demonstrates the method, which shall be included in the report. Additionally, the city may, at its option, have 1 or more inspectors present to observe any or all such inspection(s), as set forth in subsection (4). (d) The report shall attest and certify that the structural engineer performed 1 or more inspections of the subject building in accordance with the requirements set forth in this section, and that the structural engineer made reasonable efforts to identify any and all conditions that indicate the structural reliability of the building has been compromised. The report shall either (i) state that no conditions were identified that indicate that the structural reliability of the building has been compromised; or (ii) state that 1 or more conditions were identified that would indicate that the structural reliability of the building has been compromised If any such conditions are found, the report shall set forth appropriate actions to address and correct each such conditions (based on the nature, seriousness and foreseeable imminent danger), and the appropriate actions to bring the building into compliance with applicable provisions of this building code, which actions may include, but are not necessarily limited to, repairs, alterations and/or continued monitoring. The report shall also include the structural engineer's evaluation of distress and deterioration of materials, movement of structural components with respect to each other, and any effect on the structural integrity and structural reliability of the building. The report shall include the manner in which the inspection occurred of the following structural elements, as applicable: foundation, masonry bearing walls, steel framing system, floor systems, roof systems, concrete framing systems, windows, window and door anchors, outside equipment support or stands, wood framing, and loading. For major structure elements such as foundations, masonry bearing walls, steel framing systems, roof systems, and concrete framing systems, manual/forensic inspection methods, such as chipping small areas of concrete and surface finishes for closer examinations, shall be required where possible. (e) The report shall attest and certify that the electrical engineer performed 1 or more inspections of the subject building in accordance with the requirements set forth in this section, and that the electrical engineer made reasonable efforts to identify any and all conditions that would indicate that the building's electrical system does not comply with the applicable requirements of this building code. The report shall either (i) state that no conditions were identified that indicate that the building's electrical system does not comply with the applicable requirements of this building code; or (ii) state that 1 or more conditions were identified that would indicate that the building's electrical system does not comply with the applicable requirements of this building code. If any such conditions are found, the report shall set forth appropriate actions to address such conditions, (based on the nature, seriousness and foreseeable imminent danger), which actions may include, but are not necessarily limited to, repairs, alterations and/or continued monitoring. At a minimum, the following electrical components/equipment, where present, shall be evaluated: electrical service, branch circuits, conduit raceways, electrical apparatus (such as, but not limited to, circuit breaker panels and disconnect switches) and emergency lighting. (f) Any and all drafts/versions of the report, or portions of the report, that are provided to the owner shall also be simultaneously provided to the city, but shall not constitute submittal of the report as required by subsection (b) of this section. (3) Building official review of recertification inspection report. Once the report has been submitted to the building official, the building official will review the report to determine whether it satisfied the requirements of subsections (2)(b), (c), (d) and (e) of this section. If the building official determines that the report does not satisfy the requirements of this section, the owner shall make any changes to the report as needed and resubmit it no later than 30 days after the building official's determination. The report may be resubmitted in this manner up to three times until the report is determined to have satisfied the requirements of this section. If the building official determines after a third resubmittal that the report does not satisfy the requirements of this section, the matter shall be referred to the permitting and construction review board for final determination as to whether the report satisfied the requirements of this section. If the permitting and construction review board determines the report does not satisfy the requirements of subsections (2)(b), (c), (d) and (e) of this section, this shall be deemed a failure to submit the require recertification inspection report, and shall subject the owner to the remedies prescribed in subsection (6) of this section. (4) Recertification inspections. The structural engineer and the electrical engineer shall notify the building official at least 3 business days prior to performing each inspection. The city may, at its option, have 1 or more city inspectors present at an inspection to observe the inspection. Additionally, the city, at its option, may verify whether the structural engineer and/or electrical engineer have used the methods described above for both structural elements and electrical components/equipment. (5) Repair plan and schedule. In the event that repairs or modifications are found by the engineers retained by the building owner to be necessary as documented by the report or recertification inspection(s), the owner shall have 30 days from the date the report is determined by the city to satisfy the requirements of this section, pursuant to subsection (3), to submit a plan to correct the deficiencies ("repair plan"), which repair plan shall include a detailed proposed schedule to complete said repairs, including a schedule for submittal of application(s) for any required permit(s). The repair plan, including the schedule for completion of repairs, shall be subject to review and approval by the building official, whose determination may include consideration of the reasonableness of the proposed timeframe for repairs, and the nature, seriousness and any imminent danger posed by the deficiencies requiring correction, as stated in the report. Provided, however, that necessary repairs shall be commenced no later than 365 days after receipt by the building official of the report required by subsection (2)(b), which shall be reflected in the repair plan and schedule. If the building official determines the repair plan, or any part of the repair plan, is disapproved, such determination may be appealed to the permitting and construction review board; provided, however, if the building official determines that structural and/or electrical deficiencies exist that present an imminent danger to human life or safety, the building official may take any such actions determined necessary pursuant to article VII of this chapter, regardless of an appeal to the permitting and construction review board specified in this section. Correction of the structural and/or electrical deficiencies and completion of indicated repairs or modifications shall be executed in conformance with all applicable sections of the Building Code, subject to all required permits. Once the repairs or modifications have been completed, a structural and/or electrical engineer (as applicable) shall reinspect the areas noted on the original report and shall provide the owner a signed and sealed letter stating that the repairs or modifications have all been completed. The owner shall submit that letter to the building official prior to the issuance of a certificate of occupancy or completion. (6) Order of enforcement. The building official may seek an order of enforcement in the event any of the following occurs: (a) The owner fails to submit the report by the required deadline; (b) Upon a determination by the building official that the report does not satisfy the requirements of this section, the owner fails to make required changes and resubmit the report within the required timeframes; (c) The owner fails to submit a repair plan or have said repair plan approved; or (d) The owner fails to complete (subject to all required permits) any required repairs or modifications within the schedule set forth in the approved repair plan. (7) Upon a failure of a building owner to submit a required recertification inspection report or to make timely repairs or modifications, the building official shall review all available documentation and make, or cause to be made, any inspections as needed to determine if the building is unsafe for human occupancy and, upon determining that the building is unsafe for human occupancy, shall take any necessary actions including, but not necessarily limited to, those pursuant to section 19-155, article VII of this chapter.

(Ord. No. 5589, § 1, 8-24-21; Ord. No. 5639, § 1, 1-10-23)

Ask a question about Boca Raton law

Corpus searches the Boca Raton sections it holds and shows the ones that match, with their citations. Free, no sign-in.