For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 32.213 — Pretreatment of wastewater

Code of Ordinances of the City of Clearwater, Florida (Supp. No. 90: codified through Ordinance No. 9859-26, enacted January 15, 2026) · Clearwater Code of Ordinances § 32.213

Corpus is an independent public-information project, not the official City of Clearwater website. Stable reference: corpuslaw.us/code/8148e213-b6b7-49f8-b8df-7a04fb1630d2

Sec. 32.213. - Pretreatment of wastewater.

(1) Pretreatment facilities. Users shall provide wastewater treatment as necessary to comply with this division and shall achieve compliance with all categorical pretreatment standards, local limits, and the prohibitions set out in section 32.212(1) of this division within the time limitations specified by EPA, the State of Florida's Chapter 62-625 FAC, or the coordinator, whichever is more stringent. Any facilities necessary for compliance shall be provided, operated, and maintained at the user's expense. Detailed plans and specifications describing such facilities, along with operating procedures shall be prepared, signed and sealed by a professional engineer licensed by the State of Florida, submitted to the coordinator for review, and shall be acceptable to the coordinator before such facilities are constructed. The review of such plans and operating procedures shall in no way relieve the user from the responsibility of modifying such facilities as necessary to produce a discharge acceptable to the city under the provisions of this division. (2) Additional pretreatment measures. (a) Whenever deemed necessary, the coordinator may require users, at their expense, to restrict their discharge during peak flow periods, designate that certain wastewater be discharged only into specific sewers, relocate and/or consolidate points of discharge, separate sewage wastestreams from industrial wastestreams, and such other conditions as may be necessary to protect the WWF and determine the user's compliance with the requirements of this division. (b) The coordinator may require any person discharging into the WWF to install and maintain, on their property and at their expense, a suitable storage and flow-control facility to ensure equalization of flow. A wastewater discharge permit may be issued solely for flow equalization. (c) Grease, oil, and sand interceptors shall be provided by the user and at the user's expense when, in the opinion of the coordinator, they are necessary for the proper handling of wastewater containing excessive amounts of fats, grease and oil, or sand; except that such interceptors shall not be required for residential users. All interception units shall be of type and capacity approved by the coordinator shall comply with the city's fats, oil and grease management ordinance, and shall be so located to be easily accessible for cleaning and inspection. Such interceptors shall be inspected, cleaned, and repaired, as determined by the city's grease management ordinance, by the user at its expense. (d) Users with the potential to discharge flammable substances may be required to install and maintain an approved combustible gas detection meter, by the user at its expense. (e) All expenses for construction, operation, maintenance, inspection, calibration and certification of pretreatment measures required herein are incumbent upon the user. (3) Accidental discharge/slug control plans. The coordinator shall evaluate, at least once every two years, whether each significant industrial user needs a plan to control slug discharges. New significant industrial users must be evaluated within one year of being designated a significant industrial user. The results of such evaluations shall be made available to the public utilities department upon request. Significant industrial users are required to notify the control authority immediately of any changes at its facility affecting the potential for a slug discharge. If the control authority decides that a slug control plan is needed, the plan shall contain, at a minimum, the following elements: (a) Description of discharge practices, including non-routine batch discharges; (b) Description of stored chemicals; (c) Procedures for immediately notifying the, control authority and the WWF of slug discharges, including any discharge that would violate a prohibition under section 32.212, with procedures for follow-up written notification within five days, as required by subsection 32.216(6); and (d) Procedures to prevent adverse impact from any accidental or slug discharge. Such procedures include, but are not limited to, inspection and maintenance of storage areas, handling and transfer of materials, loading and unloading operations, control of plant site runoff, worker training, building of containment structures or equipment, measures for containing toxic organic pollutants, including solvents, and/or measures and equipment for emergency response. (4) Hauled wastewater. (a) Waste from liquid waste haulers such as: chemical toilets, domestic septic tanks and grease interceptors may be introduced into the WWF only at locations designated by the coordinator, and at such times as are established by the coordinator. Such waste shall not violate section 32.212 of this division or any other requirements established by the city. The coordinator may require waste haulers to obtain wastewater discharge permits. (b) No hauled industrial wastewater will be accepted.

(Ord. No. 6393-99, § 1, 8-5-99; Ord. No. 8322-13, § 3, 2-21-13)

Ask a question about Clearwater law

Corpus searches the Clearwater sections it holds and shows the ones that match, with their citations. Free, no sign-in.