Sec. 32.215. - Individual wastewater discharge permit and general permit.

(1) Wastewater discharge permit types: (a) Individual. Issued to a SIU, except in the instance that a general permit criteria is qualified for, as listed in (b) below and issued. The director may not control an SIU through a general permit where the facility is subject to production-based categorical pretreatment standards or categorical pretreatment standards expressed as mass of pollutant discharged per day or for IUs whose limits are based on the combined wastestream formula (section 62-625.410(6) or net/gross calculations 62-625.820). (b) General permits. The option to issue general permits in lieu of individual permits is authorized under state law 62-625.500(2)(a)7. 1. The director may use general permits to control SIU discharges to the WWF if the following conditions are met. All facilities to be covered by a general permit must: a. Involve the same or substantially similar types of operations; b. Discharge the same types of wastes; c. Require the same effluent limitations; d. Require the same or similar monitoring; and e. In the opinion of the director, are more appropriately controlled under a general permit than under individual wastewater discharge permits. 2. To be covered by the general permit, the SIU must file a written request for coverage that identifies its contact information, production processes, the types of wastes generated, the location for monitoring all wastes covered by the general permit, any requests in accordance with section 62-625.600(4)(b) FAC for a monitoring waiver for a pollutant neither present, nor expected to be present, in the discharge, and any other information the WWF deems appropriate. A monitoring waiver for a pollutant neither present, nor expected to be present, in the discharge is not effective in the general permit until after the director has provided written notice to the SIU that such a waiver request has been granted. 3. The coordinator will retain a copy of the general permit, documentation to support the WWF's determination that a specific SIU meets the criteria as listed in 32.215(1)(b)1. 4. The control authority shall maintain a copy of the user's written request for coverage for three years after the expiration of the general permit. 5. The director may not control a SIU through a general permit where the facility is subject to production based categorical pretreatment standards or categorical pretreatment standards expressed as mass of pollutant discharged per day or for IUs whose limits are based on the combined wastestream formula 62-625.410(6) or net/gross calculations 62-625.820. (2) Wastewater discharge permit duration. A wastewater discharge permit shall be issued for a specified time period, not to exceed five years from the effective date of the permit. A wastewater discharge permit may be issued for a period less than five years, at the discretion of the coordinator. Each wastewater discharge permit will indicate specific dates upon which it becomes effective and will expire. (3) Wastewater discharge permit contents. A wastewater discharge permit shall include such conditions as are deemed reasonably necessary by the coordinator to prevent pass through or interference, protect the quality of the water body receiving the WRF's effluent, protect worker health and safety, protect future beneficial uses of resources such as reclaimed water and bio-solids and other residuals, facilitate sludge management and disposal, protect against damage to the WWF, and comply with state and federal permits regulating the WWF. (a) Wastewater discharge permits shall contain: 1. A statement that indicates the permit duration, which in no event shall exceed five years; 2. A statement that the permit is non-transferrable in accordance with subsection (5) of this section, and includes provisions that the new owner or operator apply for a new wastewater discharge permit; 3. A requirement that the permittee file a notice of termination when terminating facility operations, or selling or otherwise transferring ownership of the facility to a new owner or operator; 4. Effluent limits, including best management practices, based on applicable general pretreatment standards in this chapter, categorical pretreatment standards, local limits, and state and local law; 5. Self monitoring, sampling, reporting, notification, and record-keeping requirements. These requirements shall include an identification of pollutants or best management practices to be monitored, sampling location(s), sampling frequency, and sample type based on general pretreatment standards, categorical pretreatment standards, local limits, federal, state, and local law; 6. The process for seeking a waiver from monitoring for a pollutant neither present nor expected to be present in the discharge in accordance with paragraph 62-625.600(4)(b), FAC, or a specific waived pollutant in the case of an individual control mechanism; 7. A statement of applicable civil and criminal penalties for violation of pretreatment standards and requirements, and any applicable compliance schedule. Such schedule may not extend the time for compliance beyond that required by applicable federal, state, or local law; 8. Requirements to control slug discharge, if determined by the coordinator to be necessary; and 9. Any grant of the monitoring waiver and or reduction of monitoring or reporting by the director, as listed in 32.215(4) must be included as a condition in the user's permit. (b) Wastewater discharge permits or general permits may contain, but need not be limited to, the following conditions: 1. Limits on the average and/or maximum volume, average and/or maximum rate of discharge, time(s) of discharge, and/or requirements for flow regulation and equalization; 2. Requirements for the installation of pretreatment technology, pollution control, or construction of appropriate containment devices, designed to reduce, eliminate, or prevent the introduction of pollutants into the treatment works; 3. Requirements for the development and implementation of spill control plans or other special conditions including management practices necessary to adequately prevent accidental, unanticipated, or non-routine discharges; 4. Development and implementation of waste minimization plans to reduce the amount of pollutants discharged into the WWF; 5. The unit charge or schedule of user charges and fees for the management of the wastewater discharged to the WWF; 6. Requirements for installation and maintenance of inspection, flow monitoring and sampling facilities and equipment; 7. Requirements for the submittal of copies of monitoring logs and records; 8. A statement that compliance with the wastewater discharge permit does not relieve the permittee of responsibility for compliance with all applicable federal and state pretreatment standards, including those which become effective during the term of the wastewater discharge permit; and 9. Other conditions as deemed appropriate by the coordinator to ensure compliance with this division, and state and federal laws, rules, and regulations. (4) Wastewater discharge permit waivers and reduced reporting criteria. (a) The director may authorize the industrial user subject to a categorical pretreatment standard to waive sampling of a pollutant regulated by a categorical pretreatment standard if the industrial user demonstrates the following through sampling and other technical factors: 1. The pollutant is neither present nor expected to be present in the discharge, or the pollutant is present only at background levels from intake water and without any increase in the pollutant due to activities of the industrial user; 2. The pollutant is determined to be present solely due to sanitary wastewater discharged from the facility provided that the sanitary wastewater is not regulated by an applicable categorical standard and otherwise includes no process wastewater. (b) This authorization of the monitoring waiver is subject to the following conditions and does not supersede certification processes and requirements established in categorical pretreatment standards, except as specified in the categorical pretreatment standard: 1. The monitoring waiver is valid only for the duration of the effective period of the permit or other equivalent individual control mechanism, but in no case longer than five years. The user must submit a new request for the waiver before the waiver can be granted for each subsequent control mechanism. 2. In making a demonstration that a pollutant is not present, the industrial user must provide data from at least one sampling of the facility's process wastewater prior to any treatment present at the facility that is representative of all wastewater from all processes. Non-detectable sample results may only be used as a demonstration that a pollutant is not present if the department approved method from Rule 62-4.246, FAC, with the lowest method detection limit for that pollutant was used in the analysis. 3. The request for a monitoring waiver must be signed in accordance with subsection 32.214(7). 4. The authorization must be included as a condition in the industrial user's control mechanism. The reasons supporting the waiver and any information submitted by the user in its request for the waiver must be maintained by the control authority for three years after expiration of the waiver. 5. Upon approval of the monitoring waiver and revision of the industrial user's control mechanism by the control authority, the industrial user must certify each report with the following statement 62.625.600(4)(c)5: "Based on my inquiry of the person or persons directly responsible for managing compliance with the pretreatment standard for 40 CFR [specify applicable national pretreatment standard part(s)], I certify that, to the best of my knowledge and belief, there has been no increase in the level of [list pollutant(s)] in the wastewaters due to the activities at the facility since filing of the last periodic report under paragraph 62-625.600(4)(a), FAC." 6. In the event that a waived pollutant is found to be present, or is expected to be present, based on changes that occur in the industrial user's operations, the industrial user must immediately notify the control authority and comply with the monitoring requirements of paragraph (4)(a) above or other more frequent monitoring requirements imposed by the control authority (c) Waivers administration: 1. Where the control authority has authorized a categorical industrial user to waive sampling of a pollutant regulated by a categorical pretreatment standard in accordance with paragraph 62-625.600(4)(b), FAC, the control authority must sample for the waived pollutant(s) at least once during the term of the categorical industrial user's control mechanism. 2. In the event that the control authority subsequently determines that a waived pollutant is present or is expected to be present in the industrial user's wastewater based on changes that occur in the user's operations, the control authority must immediately begin at least annual inspection and effluent monitoring of the user's discharge. (d) Reduced reporting for categorical industrial user: 1. Non-significant categorical industrial user: Where the control authority has determined that an industrial user meets the criteria for classification as a non-significant categorical industrial user, the control authority may decide not to permit the designated NSCIU. The NSCIU shall be evaluate, at least once per year, whether an industrial user continues to meet the criteria in 32.211(4) definitions—significant industrial user (3) and paragraph 62-625.200(25)(c), FAC; 2. NSCIU compliance reporting requirements: Facilities shall report annually and submit an annual certification. An industrial user determined to be a non-significant categorical industrial user in accordance with paragraph 62-625.200(25)(c), FAC, must annually submit the following certification statement, signed in accordance with the signatory requirements of authorized representative of the user as defined in the definition section 32-211(4). The certification must accompany any alternative report required by the control authority; 3. Middle tier categorical industrial user: The control authority may reduce the reporting requirement to no less frequently than once a year, unless required more frequently in the pretreatment standard(s) or by the director, where the industrial user meets all of the following conditions. a. The industrial user's total categorical wastewater flow does not: i. Exceed 0.01 percent of the design dry weather hydraulic capacity of the WRF, or 5,000 gallons per day, whichever is smaller, as measured by a continuous effluent flow monitoring device unless the industrial user discharges in batches; ii. Exceed 0.01 percent of the design dry weather organic treatment capacity of the WRF; and iii. Exceed 0.01 percent of the maximum allowable headworks loading for any pollutant regulated by the applicable categorical pretreatment standard for which approved local limits were developed for a WWF in accordance with subsection 62-625.400(3), FAC. b. The industrial user has not been in significant non-compliance in the past two years; and c. The industrial user does not have daily flow rates, production levels, or pollutant levels that vary so significantly that decreasing the reporting requirement for this industrial user would result in data that are not representative of conditions occurring during the reporting period. 4. Control authority middle tier CIU compliance requirements: At the director's discretion, the control authority's obligation to inspect and sample middle tier CIU's may be reduced to not less than once every two years. (5) Wastewater discharge permit appeals. The coordinator shall provide public notice of the issuance of a wastewater discharge permit. Any person, including the user, may petition the coordinator to reconsider the terms of a wastewater discharge permit within ten working days of notice of its issuance. (a) Failure to submit a timely petition for review shall be deemed to be a waiver of the administrative appeal. (b) In its petition, the appealing party must indicate the wastewater discharge permit provisions objected to, the reasons for this objection, and the alternative condition, if any, it seeks to place in the permit. (c) The effectiveness of the wastewater discharge permit shall not be stayed pending the appeal. (d) If the coordinator fails to act within ten working days, a request for reconsideration shall be deemed to be denied. Decisions not to reconsider a permit, not to issue a permit, or not to modify a permit shall be considered final administrative actions for purposes of judicial review. (e) Aggrieved parties seeking judicial review of the final administrative wastewater discharge permit decision must do so by filing a complaint with the Circuit Court of Pinellas County. (6) Wastewater discharge permit modification. The coordinator may modify a wastewater discharge permit for good cause, including, but not limited to, the following reasons: (a) To incorporate any new or revised federal, state, or local pretreatment standards or requirements; (b) To address significant alterations or additions to the user's operation, processes, or wastewater volume or character since the time of wastewater discharge permit issuance; (c) A change in either the POTW or its federal and/or state operating permits that requires either a temporary or permanent reduction or elimination of the authorized discharge; (d) Information indicating that the permitted discharge poses a threat to the city's POTW, city personnel, or the receiving waters; (e) Violation of any terms or conditions of the wastewater discharge permit; (f) Misrepresentations or failure to fully disclose all relevant facts in the wastewater discharge permit application or in any required reporting; (g) Revision of or a grant of variance from categorical pretreatment standards pursuant to Chapter 62-625.700 FAC; (h) To correct typographical or other errors in the wastewater discharge permit. (7) Wastewater discharge permit transfer. A wastewater discharge permit may NOT be transferred to a new owner or operator of a previously permitted facility. The permit application process must be repeated by the new owner or operator. (8) Wastewater discharge permit revocation. The coordinator may revoke a wastewater discharge permit for good cause, including, but not limited to, the following reasons: (a) Failure to notify the coordinator of significant changes to the wastewater prior to the changed discharge; (b) Failure to provide prior notification to the coordinator of changed conditions pursuant to section 32.216(5) of this division; (c) Misrepresentation or failure to fully disclose all relevant facts in the wastewater discharge permit application; (d) Falsifying self-monitoring reports; (e) Tampering with monitoring equipment; (f) Refusing to allow the coordinator timely access to the facility premises and records; (g) Failure to meet effluent limitations; (h) Failure to pay fines; (i) Failure to pay sewer charges; (j) Failure to meet compliance schedules; (k) Failure to complete a wastewater survey or the wastewater discharge permit application; (l) Failure to provide advance notice of the transfer of business ownership of a permitted facility; (m) Violation of any pretreatment standard or requirement, or any terms of the wastewater discharge permit or this division; or (n) Failure to timely file self-monitoring reports. Wastewater discharge permits shall be voidable upon cessation of operations or transfer of business ownership. All wastewater discharge permits issued to a particular user for a specific facility and/or discharge are void upon the issuance of a new wastewater discharge permit to that user for that facility. (9) Wastewater discharge permit reissuance. A user with an expiring wastewater discharge permit shall apply for wastewater discharge permit reissuance by submitting a complete permit application, in accordance with section 32.214(6) of this division, a minimum of 90 calendar days prior to the expiration of the user's existing permit. (10) Regulation of waste received from other jurisdictions. (a) The City of Clearwater has entered into a multi-jurisdictional agreement with the City of Safety Harbor, which contributes wastewater to the city's Northeast Water Reclamation Facility. All industrial users in Safety Harbor which contribute wastewater to the City of Clearwater's water pollution control facilities are subjected to the provisions of this division under the agreement. (b) The multi-jurisdictional agreement contains the following conditions: 1. A requirement for Safety Harbor to adopt a sewer use ordinance which is as least as stringent as this division and local limits which are at least as stringent as those set out in 32.214(4) of this division. The requirement shall specify that such ordinance and limits must be revised as necessary to reflect changes made to the city's ordinance or local limits; 2. A requirement for Safety Harbor to annually update and submit a revised industrial user inventory; 3. A provision specifying that the city reserves the right for permit issuance, inspection and sampling and enforcement; 4. A requirement for Safety Harbor to provide the coordinator with access to all information that Safety Harbor obtains as part of its pretreatment activities; 5. Limits on the nature, quality, and volume of Safety Harbor's wastewater at the point where it discharges to the city's collection system; 6. Requirements for monitoring Safety Harbor's discharge; 7. A provision ensuring the coordinator access to the facilities of users located within Safety Harbor's jurisdictional boundaries for the purpose of inspection, sampling, and any other duties deemed necessary by the coordinator; and 8. A provision specifying remedies available for breach of the terms of the multi-jurisdictional agreement. The city reserves the right to take any necessary legal action to enforce the terms and standards of the city's pretreatment division.

(Ord. No. 6393-99, § 1, 8-5-99; Ord. No. 8322-13, § 5, 2-21-13)