For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 32.216 — Reporting requirements

Code of Ordinances of the City of Clearwater, Florida (Supp. No. 90: codified through Ordinance No. 9859-26, enacted January 15, 2026) · Clearwater Code of Ordinances § 32.216

Corpus is an independent public-information project, not the official City of Clearwater website. Stable reference: corpuslaw.us/code/ccc31e39-0570-4fd9-81e7-1986c6f22b43

Sec. 32.216. - Reporting requirements.

(1) Baseline monitoring reports. (a) Within either 180 days after the effective date of a categorical pretreatment standard, or 180 days after the final administrative decision made upon a category determination request under paragraph 62-625.410(2)(d) FAC, whichever is later, existing categorical industrial users subject to such categorical pretreatment standards and currently discharging to or scheduled to discharge to the WWF shall submit to the coordinator a report which contains the information listed in paragraph (b), below. At least 90 days prior to commencement of discharge, new sources, and sources that become categorical industrial users subsequent to the promulgation of an applicable categorical standard, shall submit to the coordinator a report which contains the information listed in paragraph (b), below. New sources shall include in this report information on the method of pretreatment it intends to use to meet applicable categorical pretreatment standards. New sources shall give estimates of its anticipated flow (daily and maximum) and concentration or mass of pollutants to be discharged. 1. The industrial user may submit a baseline report which utilizes only historical data so long as the data provides information sufficient to determine the need for industrial pretreatment measures. 2. The baseline report shall indicate the time, date and place, of sampling; methods of analysis; and test results for each component and shall certify that such sampling and analysis is representative of normal work cycles and expected pollutant discharges to the WWF. (b) Industrial users shall submit the pertinent information as set forth below. 1. Identifying information. The name and address of the facility, including the name of the operator and owner. 2. Environmental permits. A list of any environmental control permits held by or for the facility. 3. Description of operations. A brief description of the nature, average rate of production, and standard industrial classifications (SIC code and/or NAICS code) of the operation(s) carried out by such user. This description should include a schematic process diagram which indicates points of discharge to the WWF from the regulated processes. 4. Flow measurement. Information showing the measured average daily and maximum daily flow, in gallons per day, to the WWF from regulated process streams and other streams, as necessary, to allow use of the combined wastestream formula set out in Chapter 62-625.410(6) FAC. 5. Measurement of pollutants. a. The categorical pretreatment standards applicable to each regulated process and any new categorically regulated processes for existing sources. b. The results of sampling and analysis identifying the nature and concentration, and/or mass, where required by the standard or by the coordinator, of regulated pollutants in the discharge from each regulated process. c. Instantaneous, daily maximum, and long-term average concentrations, or mass, where required, shall be reported. d. The sample shall be representative of daily operations and shall be analyzed in accordance with procedures set out in subsection (10) of this section. Where the standard requires compliance with a BMP or pollution prevention alternative, the user shall submit documentation as required by the coordinator or the applicable standards to determine compliance with the standard. e. Sampling must be performed in accordance with procedures set out in subsection (11) of this section. 6. Compliance certification. A statement, reviewed by the user's authorized representative and certified by a qualified professional, indicating whether pretreatment standards are being met on a consistent basis, and, if not, whether additional operation and maintenance (O&M) and/or additional pretreatment is required to meet the pretreatment standards and requirements. 7. Compliance schedule. If additional pretreatment and/or O&M will be required to meet the pretreatment standards, the shortest schedule by which the user will provide such additional pretreatment and/or O&M. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. A compliance schedule pursuant to this section must meet the requirements set out in subsection 32.216(2). 8. Signature and certification. All baseline monitoring reports must be signed and certified in accordance with section 32.214(7). (2) Compliance schedule progress reports. The following conditions shall apply to the compliance schedule required by subsection 32.216(1)(b)7 and (2): (a) The schedule shall contain progress increments in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet the applicable pretreatment standards (such events include, but are not limited to, hiring an engineer, completing preliminary and final plans, executing contracts for major components, commencing and completing construction, and beginning and conducting routine operation); (b) No increment referred to above shall exceed six months; (c) The user shall submit a progress report to the coordinator no later than 14 days following each date in the schedule and the final date of compliance including, as a minimum, whether or not it complied with the increment of progress, the reason for any delay, and, if appropriate, the steps being taken by the user to return to the established schedule; and (d) In no event shall more than six months elapse between such progress reports to the coordinator. (3) Reports on compliance with categorical pretreatment standard(s) deadline. Within 90 days following the date for final compliance with applicable categorical pretreatment standards, or in the case of a new source following commencement of the introduction of wastewater into the WWF, any user subject to such pretreatment standards and requirements shall submit to the coordinator a report containing the information described in sections 32.216(1)(b)4—6. (a) For users subject to equivalent mass or concentration limits established in accordance with the procedures in Chapter 62-625.410(4) FAC, this report shall contain a reasonable measure of the user's long-term production rate. (b) For all other users subject to categorical pretreatment standards expressed in terms of allowable pollutant discharge per unit of production (or other measure of operation), this report shall include the user's actual production during the appropriate sampling period. All compliance reports must be signed and certified in accordance with section 32.214(7) of this division. (4) Periodic compliance reports. (a) All significant industrial users (SIUs) shall at a minimum submit biannually a report indicating the nature and concentration of pollutants in the discharge which are limited by pretreatment standards and the measured or estimated average and maximum daily flows for the reporting period. All periodic compliance reports must be signed and certified in accordance with section 32.214(7). 1. SIUs with best management practices (BMPs) in lieu of numerical limits are required to submit, at a minimum, bi-annual reports. 2. Middle tier CIU as designated by the coordinator may be excluded from the biannual reporting requirement when granted by the control authority reduced submission of self monitoring reports once per year. 3. Reports submitted at reduced frequency must be representative of the conditions occurring during the entire reporting period consistent with 32.216(1). (b) All wastewater samples must be representative of the user's discharge. Wastewater monitoring and flow measurement facilities shall be properly operated, kept clean, and maintained in good working order at all times. The failure of a user to keep its monitoring facility in good working order shall not be grounds for the user to claim that sample results are unrepresentative of its discharge. (c) If a user subject to the reporting requirement in this section monitors any pollutant more frequently than required by the coordinator, using the procedures prescribed in subsection 32.216(11), the results of this monitoring shall be included in the report. (5) Reports of changed conditions. Each user must notify the coordinator of any planned significant changes to the user's operations or system, which might alter the nature, quality, or volume of its wastewater, at least 30 calendar days before the change. (a) The coordinator may require the user to submit such information as may be deemed necessary to evaluate the changed condition, including the submission of a wastewater discharge permit application under section 32.214(6). (b) The coordinator, at his discretion, may issue a wastewater discharge permit under section 32.214(8) or modify an existing wastewater discharge permit under section 32.215(4) in response to changed conditions or anticipated changed conditions. (c) For purposes of this requirement, significant changes include, but are not limited to: 1. Flow increases of 20 percent or greater; or 2. The discharge of any previously unreported pollutant(s). (6) Reports of potential problems. (a) In the case of any discharge, including, but not limited to, accidental discharges, discharges of a non-routine, episodic nature, a non-customary batch discharge, or a slug load, that may cause potential problems for the WWF, the user shall immediately telephone and notify the coordinator of the incident. This notification shall include the location of the discharge, type of waste, concentration and volume, if known, and corrective actions taken by the user. (b) Within five days following such a discharge, the user shall, unless waived by the coordinator, submit a detailed written report describing the cause(s) of the discharge and the measures to be taken by the user to prevent similar future occurrences. Such notification shall not relieve the user of any expense, loss, damage, or other liability which may be incurred as a result of damage to the WWF, natural resources, or any other damage to person or property; nor shall such notification relieve the user of any fines, penalties, or other liability which may be imposed pursuant to this division. (c) A notice shall be permanently posted on the user's bulletin board or other prominent place advising employees of whom to call in the event of a discharge described in paragraph (a), above. Employers shall ensure that all employees, who may cause such a discharge to occur, are advised of the emergency notification procedure. (7) Reports from unpermitted users. All non-domestic users not required to obtain a wastewater discharge permit shall provide timely and appropriate reports to the coordinator in the format and frequency that the coordinator may require. (8) Notice of violation/repeat sampling and reporting. If sampling performed by a user indicates a violation, the user must notify the coordinator within 24 hours of becoming aware of the violation. (a) The user shall also repeat the sampling and analysis within seven days of notifying the coordinator and submit the results of the repeat analysis to the coordinator within 15 days of the collection of the repeat sample. (b) The coordinator may, at his sole discretion, direct sampling and reporting at different frequencies with alternate reporting periods as may be necessary to protect and maintain the WWF effluent quality. (c) The user is not required to resample if the coordinator monitors at the user's facility at least once a month, or if the coordinator samples between the user's initial sampling and when the user receives the results of this sampling. (9) Notification of the discharge of hazardous waste. Discharge of hazardous waste shall NOT be allowed. Any hazardous waste that is accidentally discharged shall be reported immediately per subsection 32.216(6). (10) Analytical requirements. All pollutant analyses, including sampling techniques, to be submitted as part of a wastewater discharge permit application or report shall be performed in accordance with the techniques prescribed in Chapter 62-160 FAC and Chapter 40 CFR Part 136, unless otherwise specified in an applicable categorical pretreatment standard. If either of the above techniques does not contain sampling or analytical techniques for the pollutant in question, sampling and analyses must be performed in accordance with procedures approved by EPA. (11) Sample collection. (a) Except as indicated in subsection (b), below, the user must collect wastewater samples using flow proportional composite collection techniques. In the even flow proportional sampling is infeasible, the coordinator may authorize the use of time proportional sampling or a minimum of four grab samples where the user demonstrates that this will provide a representative sample of the effluent being discharged. In addition, grab samples may be required to show compliance with instantaneous discharge limits. (b) Samples for oil and grease, temperature, pH, cyanide, phenols, sulfides, and volatile organic compounds must be obtained using grab collection techniques. (c) Sample taking and analyses shall be performed with sufficient care to produce evidence admissible in enforcement proceedings or in judicial actions; DEP-SOP-001/01 or its successors shall be applied procedures for all samples. (12) Timing. Written reports will be deemed to have been submitted on the date postmarked. For reports which are not mailed, postage prepaid, into a mail facility serviced by the United States Postal Service, the date of receipt of the report shall govern. (13) Record keeping. Users subject to the reporting requirements of this division shall retain, and make available for inspection and copying, all records of information obtained pursuant to any monitoring activities required by this division and any additional records of information obtained pursuant to monitoring activities undertaken by the user independent of such requirements and documentation associated with best management practices established under section 32-212(4)(c). Records shall include the date, exact place, method, and time of sampling, and the name of the person(s) taking the samples; the dates analyses were performed; who performed the analyses; the analytical techniques or methods used; and the results of such analyses. These records shall remain available for a period of at least three years beyond the expiration date of the permit for which the records were created. This period shall be automatically extended for the duration of any litigation concerning the user or the city, or where the user has been specifically notified of a longer retention period by the coordinator. (a) All sampling and analysis activities shall be subject to the recordkeeping requirements specified in Chapter 62-160 FAC. (b) The control authority must retain documentation to support the control authority's determination that a specific industrial user qualifies for reduced reporting requirements under paragraph (4)(d), above, for a period of three years after the expiration of the term of the permit or control mechanism.

(Ord. No. 6393-99, § 1, 8-5-99; Ord. No. 8322-13, § 6, 2-21-13)

Ask a question about Clearwater law

Corpus searches the Clearwater sections it holds and shows the ones that match, with their citations. Free, no sign-in.