For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 307 — Plats

Code of the City of Miramar, Florida (Supp. No. 105: codified through Ordinance No. 26-10, adopted July 8, 2026) · Miramar Land Development Code § 307

Corpus is an independent public-information project, not the official City of Miramar website. Stable reference: corpuslaw.us/code/15c34241-564b-4073-83c4-43ca23184570

Sec. 307. - Plats.

307.1. Purpose. The purpose of this section is to ensure that all lands included within subdivisions will be suitable for the various purposes proposed in the request for subdivision approval; that all subdivisions will be served adequately and economically by public facilities and services which may be necessary in each particular case; and to establish the procedures and requirements for obtaining approval of a plat of a subdivision as defined by F.S. part 1, chapter 177, as well as procedures related to amending plats and related instruments. No plat of subdivision lying within the city shall be recorded in the public records of Broward County prior to approval by the city commission. When any subdivision of land is proposed, and before any permit for the erection of a principal structure in such proposed subdivision shall be granted, the subdivider or a duly authorized agent shall secure approval of and record in the official records such proposed subdivision in accordance with established procedures. No plat application shall be considered by the city unless the zoning district of the site is in conformance with the land use designation in the comprehensive plan future land use element. 307.2. Types of Plats Required. The city will consider two types of plats for approval: perimeter subdivision plats and full subdivision plats. The requirements for each type of plat are included below. A property owner/developer may submit either of the two types of plats provided for review and approval. A full subdivision plat or re-plat shall be approved by the city and recorded in Broward County's records for all land with residential fee-simple ownership lots. A perimeter subdivision plat satisfies the requirements for both a plat of nonresidential land and a plat of residential land without fee-simple ownership. Certificates of occupancy shall not be issued for buildings within the property until the plat has been recorded. 307.3. Plat Required. No building permit shall be issued for a principal building unless a plat, including the parcel(s) of land on which the building will be constructed has been approved by the Broward County Commission and recorded in the public records of Broward County subsequent to June 4, 1953, PB 32-15. This section shall not apply to an application for a building permit which meets the criteria for a plat waiver as provided for herein. 307.4. Plat Waivers. In those instances, and only those instances, where Broward County does not require platting or re-platting, the commission may waive any or all of the platting regulations. In granting said plat waiver, the commission may prescribe specific requirements or conditions designed to achieve the objectives of the LDC and the comprehensive plan for each individual case. 307.4.1. Application Required. In all instances when Broward County does not require platting or re-platting, a plat waiver application is required when a parcel of land requires subdivision to more than six parcels. Plat waiver application forms, along with all established and required fees, documents, and plans, shall be submitted by the applicant to the department. The petition shall identify the sections of the LDC from which the waiver is requested and shall state fully the grounds for the application and all facts relied upon by the applicant. A fee as established by the city shall be paid by the applicant. The department shall establish the information necessary to process the application. 307.4.2. Public Hearing and Notice. The public hearing and notice provisions for a plat waiver shall be the same as that for a final plat. 307.4.3. Conditions for Granting a Plat Waiver. A plat waiver shall be granted upon the commission finding that: (1) It will not be detrimental to the public health, safety, aesthetics, interest and welfare; and (2) It furthers and is consistent with the goals, objectives, and policies of the city's comprehensive plan; and (3) It will not violate any provision of the city's comprehensive plan; and (4) All land which is necessary to comply with the Broward County trafficways plan and appropriate city plans have been conveyed by deed or easement, at the option of the unit of government; and (5) That all subdivided parcels have legal access, utilities and drainage connection and required easements recorded; and (6) The subdivision has access from a publicly owned or dedicated right-of-way meeting the city's standards. 307.5. Final Plat Review. An applicant for final plat approval shall submit either a partial subdivision plat or full subdivision plat pursuant to the requirements. Final plats shall be reviewed by the DRC, and approved or denied by the commission. Plat application forms, along with all established and required fees, documents, and plans, shall be submitted by the applicant to the department. The application shall include all of the drawings required in the city's plat submittal requirements document and as required in F.S. §§177.041 through 177.061, 177.081, and 177.091, the requirements set forth in §5-189(a) through (c) in the Broward County Code of Ordinances, as amended from time to time. 307.6. Review by DRC. The DRC shall meet to determine if the proposed plat complies with the submittal requirements and all other applicable land development regulations. The DRC shall review with particular attention to such factors as: width, arrangement, access, location and type of streets; dedications; surface drainage; water supply; sewage disposal; lot sizes and arrangements; requirements for parks, open space, school sites, public building sites; common areas; lot designation, size, and dimensions; proposed stormwater treatment and drainage system; what properties are to be dedicated and to whom the properties will be dedicated; the creation or existence of any easements, the purpose of said easements, the location and size of said easements, and what person or legal entity will hold title to and maintain said easements; the location and size of common properties and what person or legal entity will hold title to and maintain said property; any security for performance or maintenance of properties to be dedicated to the public, including, but not limited to, rights-of-way and utility easements; and the adopted level of service standards. The DRC shall also review any documents relating to the creation of a property or home owners' association and covenants, conditions, easements, and restrictions, common to all or portions of the subdivision. Prior to the final DRC review of the proposed plat and subdivision-related documents, the plat and said documents will be submitted to the city attorney for review and comment. The DRC chairperson shall submit a written report incorporating the findings of the DRC to the applicant and to the city manager. 307.7. Review by City Commission. All final plats must be submitted to the city commission for action at a public hearing, which shall be duly noticed, once the plat and all required supporting documentation have been received by the staff and reviewed under the authority contained in the LDC. The director shall submit the DRC report to the city manager, for transmittal to the city commission. The city commission shall review the final plat application and the recommendations of the DRC and take one of the following actions: (1) Approve the final plat as presented if the plat is found to be in conformance with these regulations, and issue a resolution setting forth such approval; or (2) Approve the final plat with conditions, and issue a resolution setting forth such approval and conditions; or (3) Disapprove the final plat when not found to be in conformance, setting forth the reasons for such disapproval. No plat shall be approved unless: (1) It is consistent with the comprehensive plan; and (2) It meets all requirements of the LDC; and (3) It meets all requirements of the city's plat submittal requirements document; and (4) It meets, or at the time of recording it will meet, all applicable requirements of F.S. §§177.041 through 177.061, 177.081, and 177.091; and (5) The requirements set forth in §5-189(a) through (c) in the Broward County Code of Ordinances, as amended from time to time; and (6) It furthers the public health, safety, welfare, aesthetics, and interest. The approval of any plat is conditioned by the payment of: any ad valorem taxes due prior to recording as required from time to time by law, the payment of any impact fees or fair share contributions due at or prior to the time of recording of the plat; and the conveyancing of any tracts or parcels of land or interests in land that the city desires to be conveyed, as opposed to being dedicated, simultaneous with recording of the plat or as otherwise directed in any plat approval. 307.8. Endorsement of the Final Plat. Upon approval of the final plat by the commission, it shall be endorsed by the city engineer and the city manager and attested to by the city clerk. The city engineer shall forward the signed original of the final plat to the applicant for county approval. A plat containing dedications of any interest in property, when properly recorded, shall constitute a sufficient, irrevocable conveyance to vest in all legal and equitable interests in the parcels of land so dedicated, to be held by the city in trust and the approval of the final plat by the commission shall have the force and effect of an acceptance of said legal and equitable interest. However, nothing shall be construed to create any obligation on the part of the city to perform any act of construction or maintenance within a dedicated area unless or until that obligation is voluntarily planned, budgeted and implemented by the city. 307.9. Requirements for Final City Signature. Prior to plat recordation, the property owner and developer shall have satisfied all the conditions of plat approval by the commission, executed approved agreements concerning the payment of the developer's share of required public facilities, impact fees, and any other requirements of the final plat approval. The applicant shall also provide one copy of the final plat, as approved by the city, in digital format deemed acceptable by the city engineer. 307.10. Time Limitations of Final Plat Approval. The burden is on the property owner and the developer to record the plat in the public records within the time specified by Broward County. Failure to record within the time specified by Broward County shall render the approval of said plat terminated, null and void. 307.11. Enforcement Provisions. 307.11.1. Recording of Plat. No plat shall be recorded in the public records of Broward County or have any validity whatsoever until it shall have been approved in a manner prescribed herein and the final plat shall incorporate all changes or modifications required by the commission. In the event any such unapproved subdivision is recorded, it shall be considered invalid and the commission may institute court proceedings to have it stricken from the public records of Broward County, Florida at the applicant or owner's cost. The foregoing requirement is a condition of any plat application. 307.11.2. Permits. The building official shall not issue any building permit for any habitable and occupiable structure to be constructed within the city until the plat is recorded with the county, unless the property owner has entered into a tri-party agreement approved by the city pursuant to Sec. 307.13.1. 307.11.3. Public Improvements. The commission hereby determines it to be public policy that the city shall withhold all public improvements and services of whatsoever nature, including the maintenance of streets and the furnishing of sewerage facilities and water services to all subdivisions or parcels of land which public improvements and utilities along with required easements and deeds, free and clear of all mortgage or other security interests or in the event of an easement, joined in and consented to by the mortgage or other security interest holder, have not been conveyed and accepted by the commission in the manner prescribed by the code. All deed and easement deeds conveyed shall require that the property owner/grantor shall covenant with said the grantee that the property owner/grantor is lawfully seized of said land in fee simple; that the property owner/grantor has good right and lawful authority to sell and convey said land; that the property owner/grantor does hereby fully warrant the title to the said land and will defend the same against the lawful claims of all persons whomsoever; and that said land is free of all encumbrances, except as otherwise described in the conveyance. 307.11.4. Revision of Plat Subsequent to Approval. Prior to recording any plat in the public records of Broward County, the property owner shall provide to the city engineer a copy of the subject plat reflecting all corrections and/or modifications which may have been made subsequent to the plat approval by the commission. The city engineer shall then review the plat to determine if any revisions or modifications have been made that are contrary to or inconsistent with that approval. After review, the city engineer will provide the property owner with a letter which will either authorize recordation of the revised plat or require that the revised plat be returned to the city commission. Any adversely affected person may appeal the decision of the city engineer pursuant to the appeal process set forth in sections 315.10-315.13 of this Code. Any applicant shall be advised in writing at the time the written decision is rendered, how they may appeal the decision. 307.11.5. Failure to Satisfy Conditions of Approval. A failure to satisfy conditions of approval, whether conditions precedent or subsequent to plat recordation, shall be reported to the city manager by the city engineer or the director. If upon written notice by the city manager or said manager's designee, the applicant or property owner fails to correct the failures within the timeframe set by the city manager, the commission shall be notified which shall upon notice to the property owner hold a public hearing. If the commission finds that the conditions have not been satisfied, then the city shall take immediate corrective action to ensure compliance. 307.12. Plat Exemptions. Modifications to recorded plats. A property owner may petition to modify a recorded plat. Plat exemption application forms, along with all established and required fees, documents, and plans, shall be submitted by the applicant to the department, and are subject to DRC review and administrative approval. The modifications listed below may be accomplished upon a finding by both the city engineer and the DRC Chair that the subject property was platted subsequent to June 4, 1953, and that the regulations have been met. The following types of development shall be deemed to be exempt and not subject to the provisions of the mandatory platting requirements of the LDC: 307.12.1. No change to a recorded plat is created or no development is undertaken except in conformance with the recorded plat or as specifically allowed in this section. 307.12.2. The dedication of land or any interest in land to any governmental agency, entity or political subdivision. 307.12.3. The division of a multi-family residential zoned platted lot to permit individual ownership in conformance with all applicable zoning and Florida Building Code provisions. 307.12.4. The combination of lots and/or portions of lots (i.e., unity of title) in a residential zoning district to create a common building site provided that the property owner presents an instrument recordable in the public records of Broward County, Florida, identifying the boundaries of the building site and the intent to develop and convey as one site or parcel in perpetuity or so long as the proposed use exists said instrument must be presented to the DRC for acceptance or rejection. No combination shall be approved where it would allow violation of any other code provisions. The DRC may require that a bonding lot agreement in form and substance acceptable to the city attorney be executed by the property owners of all portions of the property and joined in and consented to by the holders of all mortgage or other security interests. 307.12.5. The combination of parcels and/or portions of parcels (i.e., unity of title) in a nonresidential or mixed-use zoning district to create a common building site provided that the property owner presents an instrument recordable in the public records of Broward County, Florida, identifying the boundaries of the building site and the intent to develop and convey as one site or parcel in perpetuity or so long as the proposed use. Said instrument must be presented to the DRC for acceptance or rejection. No combination shall be approved where approval would allow violation of any other code provisions. The DRC may require that a bonding lot agreement in form and substance acceptable to the city attorney be executed by the property owners of all portions of the property and joined in and consented to by the holders of all mortgage or other security interests. 307.12.6. The division of a nonresidential or mixed-use zoned platted parcel into not more than six parcels, when the city determines that a new public right-of-way or parcel access is not required. In this instance, the DRC chair and the city engineer may require that any or all of the following items be provided and approved: (1) Current property survey showing all the recorded easements, including access, alley, drainage, landscape, maintenance, and utility easements between all the parcels. The survey shall be certified to and for reliance by the city and must be prepared by a registered and licensed Florida surveyor and mapper. The survey shall be current, meaning that the survey is no older than 180 days prior to application (or brought up to date) and depicts current conditions on the subject property. Said survey shall be prepared in accordance with the minimum technical standards of F.S. § 472.027, and F.A.C. ch. 21HH-6, and attached as an exhibit to the application; and (2) Sketch plat; and/or (3) Master parking plan and shared parking agreement (as approved by the city attorney); and/or (4) Secondary access plan and cross-access agreement; and/or (5) Paving, grading and drainage plan; and/or (6) Water and sewer plans. 307.13. Building Permits Prior to Plat Recordation. Except as provided for in this section, no person or legal entity, shall be eligible for any building permit for a principal building on property located within the city for land which requires platting. 307.13.1. A building permit may be issued for a parcel of land for which plat approval has been given by the board of county commissioners and the city commission, although the plat has not yet been recorded, provided such authorization is granted in a tri-party agreement among the developer, the property owner, the city and the county. The agreement shall be joined in and consented to by any mortgagee or holder of a security interest in the parcel of land or any portion thereof. Such agreements shall, at a minimum, require compliance with the applicable provisions of plat approval and shall prohibit both the issuance of a certificate of occupancy, and the contract for sale, agreement for deed, or lease of any such lot to the ultimate consumer until the plat is recorded. The city and county shall be required to make a finding that facilities and services will be available at the adopted level of service standards concurrent with the issuance of the building permit. 307.13.2. A building permit may be issued for an essential governmental facility after preliminary plat review where the Broward County board of county commissioners and the city commission find that immediate construction of the governmental facility is essential to the health, safety, or welfare of the public and where the county and city determine that public facilities and services will be available at the adopted level of service standards concurrent with the impact of development of the governmental facility. Such a finding shall be made by agreement between the city and county. A certificate of occupancy shall not be issued until recordation in the public records of the plat. 307.14. Plat Note and Non-Vehicular Access Line Amendments Subsequent to Plat Recordation. The city or a petitioner may request approval of an application with Broward County to amend the existing, recorded plat with respect to the text of the adopted plat note or to the restrictions of the non-vehicular access line (NVAL). Such approval would be granted by the county commission and the amendments shall be recorded in the public records of the county. 307.15. Vacation of Easements and Rights-of-Way. (a) A property owner may petition to modify an easement or right-of-way on a recorded plat. Vacation of an easement and right-of-way application forms, along with all established and required fees, documents, and plans, shall be submitted to the city by the applicant to the department, and are subject to DRC review, and are subsequently approved or denied by the commission. (b) The commission may, of its own motion, or upon petition of any person, adopt a resolution vacating, abandoning, discontinuing, and closing any existing public or private street, alleyway, road, highway or easement, and renouncing and disclaiming any right of the city and the public in and to any land in connection therewith. Prior to the adoption of such resolution, the commission shall hold a public hearing and shall publish one (1) notice, in a newspaper of general circulation at least fourteen (14) days prior to the hearing date. The resolution, as adopted, and the proof of publication of the notice of the adoption of such resolution shall be recorded in the public records of the county. (c) The applicant may file an application to vacate or abandon an easement or a right-of-way or portion thereof. The application shall include: (1) Location map: a drawing which clearly and legibly identifies the location of the application site in relation to the nearest public rights-of-way, excluding the site of the right-of-way or easement to be vacated, and all affected properties; the location map may be located on the survey provided for below; and (2) Abutting property and affected property. The application shall include a map that identifies the boundaries of abutting properties and the name(s) of all property owners of property abutting the right-of-way to be vacated, as depicted on the Broward County ad valorem tax rolls as of the date of the application; and (3) Survey. A land survey certified to and for reliance by the city certified to by a State of Florida licensed mapper and surveyor. Said survey shall measure not larger than 8.5 inches by 14 inches and shall be prepared in accordance with the minimum technical standards of F.S. § 472.027, and F.A.C. ch. 21HH-6, and attached as an exhibit to the application. The survey shall be certified to and for reliance by the city and must be prepared by a registered and licensed Florida surveyor and mapper. The survey shall be current, meaning that the survey is no older than 180 days prior to the date of application (or brought up to date) and depicts current conditions on the subject property. Said survey shall be prepared in accordance with the minimum technical standards of F.S. § 472.027, and F.A.C. Ch. 21HH-6, and attached as an exhibit to the application. The survey shall also contain or depict an accurate drawing and legal description of the right-of-way or easement to be vacated, and the boundaries of abutting properties with the identifying designation of those properties; (4) In the case of a roadway easement or right-of-way, the application must include a petition executed by 75 percent of the abutting property owners by both number and land area, all as of the date of application for vacation; and (5) Completion of an application to be developed by the director and payment of required application fees. (d) An easement or right-of-way may be considered for vacation upon the following requirements being satisfied by the applicant: (1) The vacation is consistent with the comprehensive plan. Merely showing an easement or right-of-way in a comprehensive plan map shall not be interpreted as mandating that the vacation application is inconsistent with the comprehensive plan; and (2) Establishment that the easement or right-of-way is no longer needed or will not be needed in the foreseeable future, by the city, the county, the state, the federal government, the general public, or a utility. Traffic studies may be submitted as supportive evidence to satisfy this criterion; and (3) That there is convenient access of property owners on adjoining street rights-of- way and that property owners contiguous with the right-of-way will not be adversely affected.by the vacation; and (4) That the city has received written approval or consent from affected utilities to the abandonment of the right-of-way or an easement. If existing utilities or improvements are located in the application site, any provisions for the utilities or improvements to be relocated shall be defined in writing by the affected utility. Written consent of the utility if a new utility easement will be created within or over the original application site for existing or planned utility equipment located in the right-of-way that is being considered for vacation; and (5) A determination whether any geographic areas within 1,000 feet may be impacted by the proposed action and the nature and degree of impact; and (6) A determination of what other additional property, easements, utility relocations, agreements or other actions may also be required to accommodate the proposed action. The applicant may be required to provide an alternative right-of-way or easement; and (7) Identification and evaluation of the nature and degree of any impacts that the proposed action might have on the delivery and provision of service by public service vehicles. (e) No right-of-way or public easement giving access to any publicly accessible waters in the city shall be closed, vacated or abandoned except in those instances wherein the applicants offer to trade or give to the city comparable land for a right-of-way or public easement that provides access to the same body of water. Such access shall not create a hardship on the users. A determination on this, as well as the distance and comparable land being offered, shall be left to the discretion of the city commission. 307.16. Encroachment into Platted Easements. Any encroachment such as but not limited to, fences, walls, sheds, signs, landscaping shall not be allowed on a public utility easement adjacent to a roadway right-of-way (either private or public). Notwithstanding anything to the contrary, the city manager or designee may issue a revocable license agreement to encroach into easement on a platted utility easement or any other easement used for utility and/or traffic control purposes provided the following conditions are met: (1) The encroachment on the platted utility easement used for utility purposes is de minimis in nature, as determined by the city; and (2) The encroachment is a result of a permitted or approved structure or house meeting the city's setback requirements at the time the permit was issued; and (3) All utilities having the right to the affected easement consent in writing to the encroachment; and (4) The city or utility removing or destroying of any fence, walls, shed, sign, or landscaping for work within the easement, shall not be liable to the property owner or occupant and shall not be responsible for repair or replacement of any fence, walls, shed, sign, or landscaping. 307.17. Schematic Subdivision Improvements Plan. 307.17.1. Filing. Concurrent with the submission of a final subdivision plat, the applicant must submit a schematic subdivision improvements plan for all improvements necessary to bring water, sewer, roads and other required public improvements to the site including all paving, grading and storm drainage facilities required by the plat. Schematic engineering plans shall conform to the final plat and the city's subdivision improvements standards and specifications as established in the City of Miramar Land Development Process and Procedures Manual (Rev. 2016), which may be amended from time to time by resolution of the city commission and is on file with the city engineer. The plan shall be 24 inches times 36 inches size and to a scale of not more than one inch equals 100 feet. 307.17.2. Review and Approval of Schematic Improvement Plans. The city engineer shall review the schematic subdivision improvements plan and shall approve, approve with conditions, or deny said plans. Any denial shall include an explanation of why the schematic subdivision improvements plan was denied.

(Ord. No. 17-07, § 6, 11-14-16; Ord. No. 20-08, § 2(Exh. C), 3-18-20)

Ask a question about Miramar law

Corpus searches the Miramar sections it holds and shows the ones that match, with their citations. Free, no sign-in.