Sec. 317. - Lake Excavation and Resource Extraction Improvements.

317.05. Blasting prohibited. Blasting, in connection with lake excavation or resource extraction, is prohibited anywhere within the city. 317.1. Conditional use approval required. Resource extraction, mining, or the removal of fill from a parcel shall not be permitted without obtaining a conditional use approval from the commission. An application shall be submitted and processed in conformance with this Code. The application shall be processed in conformance with the procedures for a conditional use, except it shall be exempt from planning and zoning board review. 317.2. Conditional use approval is not required for excavations for the purposes set forth in this section. Notwithstanding the exemption from conditional use review, all activity listed in subsections (c) and (d) shall conform to the design specifications in sections 317.6 through 317.15. (1) Excavations for structural components such as building footers and pads, swimming pools and accessory structures which have been permitted by the building division. (2) Canal rehabilitation activities of the South Broward Drainage District (SBDD) or the South Florida Water Management District (SFWMD). (3) Excavation of lakes on residential or nonresidential parcels for the purpose of providing building pads or raising the grade of the site. However, no such activity will be exempted if there is any removal of fill from the site. The excavator is required to show compliance with all other permitting agencies prior to the commencement of lake excavation. (4) Excavation to create water hazards on a bona fide 18-hole golf course. However, no such activity will be exempted if there is any removal of fill from the site. 317.3. Submission requirements. Applicants for conditional use approval to permit resource extraction, mining, or the removal of fill from a parcel shall submit to the department, along with the application for conditional use approval, engineering and other data, as set forth below, in sufficient detail to permit the city to evaluate the potential effect of the operation on existing and planned development in the vicinity, to anticipate any adverse effects which might arise from the operational characteristics of the project, the duration of the project, and the finished conditions which will exist at the time the project is terminated. Applicants shall be required to submit the additional information set forth below. A site development and reclamation plan which shall show the proposed use of the property upon completion of the mining or quarrying and shall also include the following: (1) A plot plan to show the property owned and controlled by the applicant with reference to streets, highways and contiguous platted areas; (2) Cross-sections to show approximate elevation and grades at the final outside boundaries of the mining or quarrying operation. The estimated cubic yards to be removed, and the depths and slopes of voids created, cut and fill calculations must be provided. The plan shall show the ratio of the slope depth to distance from the final lake boundary as specified in section 317.6; (3) A final grading plan to show the ground elevations of the land immediately adjacent to the site of the mining or quarrying and all adjacent and contiguous streets and roads; (4) The physical layout, with linear dimensions of all proposed lakes, canals or other excavations, arterial and collector roads and development parcel boundaries; (5) The plans, maps, elevations and cross sections required by this section shall be made and sealed by a surveyor or engineer registered as such by the state of Florida; (6) Proposed and required wetland mitigation areas as provided for in a Florida Department of Environmental Protection (FDEP) dredge and fill permit. A stormwater management plan shall be designed to prevent contamination of the Biscayne Aquifer and control erosion caused by wind and rain. 317.4. Prior to the granting of conditional use approval, the commission shall attach such conditions and stipulations to ensure that the following standards have been met. The burden of proof shall be upon the applicant to establish that each of the foregoing standards has been met. (1) The proposed conditional use approval is appropriate in the area in which it is proposed; (2) The proposed conditional use approval will be reasonably compatible with surrounding uses; (3) The proposed conditional use will not contaminate the Biscayne Aquifer; (4) Any nuisance or hazardous feature involved is suitably separated and buffered from adjacent uses; (5) The proposed conditional use approval will not hinder development of the site or nearby vacant property; (6) Traffic will not be generated on local streets; (7) The land or building which is involved is adequate; (8) The proposed conditional use complies with the comprehensive plan; (9) The proposed conditional use is consistent with applicable mitigation plans approved by the Army Corps of Engineers and Department of Environmental Protection; and (10) The slope to the lake shall have a safe vertical to horizontal ratio. 317.5. In granting a conditional use approval the commission may prescribe any reasonable conditions, restrictions or limitations it deems necessary or desirable in addition to those set forth herein, in order to maintain and be consistent with the city's comprehensive plan for the area. The city commission may revoke, modify or change any resolution adopted granting a conditional use approval, if the city finds that there has been a variation or violation of any imposed conditions, restrictions or limits in any such resolution. 317.6. Lake bank slopes or inclines from the design finished grade shall not be steeper than one foot vertical to four feet horizontal and shall extend downward from the design finished grade into the water to an elevation of three feet below the SBDD's basin control elevation. The slopes below this point may be excavated as vertical downward to the steepest safest slope the soil will bear upon the recommendation of a certified soils engineer. These sloping requirements may be modified in accordance with a wetland mitigation cross-section approved by the U.S. Army Corps of Engineers. However, in no case shall the deep cut line be closer than 18 feet to the water's edge at low water elevation. 317.7. Canal bank slopes or inclines from the design finished grade which are part of a canal system to be dedicated to the SBDD shall not be steeper than one foot vertical to two feet horizontal and shall extend downward from the design finished grade into the water to an elevation of two feet below the average annual low water table elevation established on the SBDD Basin Map, as amended or replaced from time to time. At depths lower than two feet below the low water table, the slope may be increased to the steepest safe slope the soil will bear upon recommendation of a certified soils engineer. Canal banks or inclines from the design finished grade which are not dedicated to the SBDD shall be required to provide and maintain a slope in accordance with this Code. 317.8. The city shall require the dedication of all rights-of-way within or adjacent to the project as shown on the Broward County trafficways plan prior to the granting of a conditional use approval and additional rights-of-way as shown in the city's comprehensive plan. 317.9. The grading, leveling and sloping of the banks shall be on a progressive basis, and the perimeter around the excavation shall be backfilled and graded to meet with the approval of the city engineer and to conform to the accepted site development plan. 317.10. The boundaries and the top of bank slope line in the portion of the final perimeter to which the mining, quarrying or excavation extends shall be staked so as to meet with the approval of the city engineer and said stakes shall be maintained in proper fashion at all times so that the final exterior boundary limits of excavation, slopes and grade levels may be easily determined and verified. Moving of any stake without the written permission of the city engineer shall be a violation of section 1-13, subjecting a violator to both a fine and/or a term in jail. 317.11. An annual inspection will be performed by the city and a report of any deviation from the approved permit shall be reported to the city manager. In conjunction with such inspection, the applicant shall present progress drawings of mining, quarrying and excavations, prepared and sealed by a registered surveyor and mapper, to substantiate their conformity to the approved site development plan. The annual progress drawing must contain or be accompanied by the following data: (1) Base line around the perimeter of the lake shall coincide with the top of the four to one slope and shall be clearly referenced to at least one lot line or land line; (2) Aerial photographs at a scale of one inch equals 300 feet; and (3) In areas where the deep cut line approaches within 100 feet of the baseline, cross section surveys will be required. Said cross sections shall be perpendicular to the baseline at 100 foot stations. 317.12. During the mining or quarrying operations the property shall be suitably posted, at intervals of 200 feet on the perimeter of the excavation-site, with warning signs denoting the operation and of such character as may be adequate to warning the public concerning possible hazards. 317.13. If the area in the surrounding neighborhood becomes substantially developed, as determined by the city, and if, in the opinion of the city engineer, the excavation then becomes hazardous to the surrounding area, the property shall be fenced. 317.14. Security shall be maintained on the premises during all daylight hours, including Saturdays, Sundays and legal holidays, when there are no workers on the premises. 317.15. Any public roads in the vicinity of the project used in connection with the project shall be so designated prior to use and shall be repaired and restored to their original conditions when, in the opinion of the public works director, they have deteriorated beyond normal wear and tear due to the operation of the project. The opinion of the public works director in connection with the repair and restoration of the public roads used in connection with the project shall be final. Use of any other public roads shall be grounds for revoking the conditional use. All access roads shall be continuously well sprinkled to minimize dust, provided such sprinkling shall not be required 500 feet or more from an improved public road. 317.16. Upon completion of the mining or quarrying and also when, in the opinion of the city engineer, there is a question that the excavation being done is not in accordance with the site development plans approved, a certified topographical survey showing elevations and cross-sections of the excavation shall be submitted upon request of the city engineer. 317.17. Muck or marl may be removed from the premises, provided that a sufficient amount is retained to landscape the property around the lake. 317.18. The conditional use approval granted under this section shall be granted only to the applicant, and such approval shall not be transferred to a subsequent owner following a transfer or ownership of the property, unless the commission has approved such transfer. 317.19. The city commission shall determine a starting date and a completion date during which time the mining, quarrying, resource extraction and removal of fill work shall be accomplished. 317.20. If mining, quarrying or excavation is discontinued for a period in excess of 180 days, the body of water created by such mining, quarrying or excavation shall either be fenced or sloped in accordance with the requirements of this Code provision. 317.21. Bonding and insurance is required. In order to insure compliance with all terms and conditions imposed, a cash or performance and payment surety bond shall be posted with the city clerk, payable to the city issued by a Florida licensed surety in a form acceptable to the city attorney, in the amount of $100,000.00. Before commencing the work, the bond or other form of security shall be posted prior to the commencement of any on-site activity or land disturbance. The bonds shall insure that during the operation and after discontinuation of the operation, all public roads shall be repaired and restored, a fence shall be installed if required, all sloping shall conform to the terms of this section and shall insure compliance with the approved site development plan and site reclamation plan. Every applicant or operator of any mining or quarrying operation shall be continuously insured with a commercial general liability insurance policy that does not exclude coverage for lake extraction, mining or quarrying, in an amount not less than $100,000.00 per person and up to $500,000.00 per occurrence against any liability arising from any activity or operation incidental to the operation. 317.22. The city clerk shall record a copy of any resolution granting conditional use approval for the purpose of mining, quarrying, resource extraction or removal of fill. The resolution shall be recorded in the public records of Broward County, Florida, and the applicant shall pay the costs of recordation. 317.23. The minimum distance between a lake and a right-of-way line or property line shall be as provided for in this subsection. These distances may be increased if it is determined through the review of excavation plans that the lake bank slopes will not be stable and the potential shifting of the finished lake banks would affect the development of adjacent property. These minimum distances shall include the required lake bank slopes provided for in this section. The minimum distance between a lake's deep cut line and an existing or planned right-of-way line, or an adjacent property line shall be 50 feet or the distance required to maintain the lake's angle of natural repose, whichever may be greater. If the adjacent road is curvilinear or a dead-end this minimum distance may be increased to provide additional safe recovery area between the lake and road. This minimum distance may be decreased provided the applicant can demonstrate that the reduction meets or exceeds the distance required by the lake's angle of natural repose or FDOT's minimum standards, whichever may be greater. 317.24. The applicants and operators of all mining or quarrying operations shall comply with all applicable federal, state, regional, county, city and other governmental laws, ordinances, rules, policies and regulations.

(Ord. No. 17-07, § 6, 11-14-16)