§ 311 — Community Appearance Board
Code of the City of Miramar, Florida (Supp. No. 105: codified through Ordinance No. 26-10, adopted July 8, 2026) · Miramar Land Development Code § 311
Corpus is an independent public-information project, not the official City of Miramar website. Stable reference: corpuslaw.us/code/469c175b-f5ea-415d-a730-ad8bacd19fe6
Sec. 311. - Community Appearance Board.
311.1. Community Appearance Board Review Required. Applications for site plan approval and site plan amendment approval where buildings and structures and proposed to be built or modified, shall be accompanied by an application for CAB review. CAB and CAB revision application forms, along with all established and required fees and cost recovery deposits, documents, and plans, shall be submitted to the city by the applicant to the department. While the DRC reviews the proposal for the technical merits of the site plan layout and conformance with the Code and established engineering and life safety standards, the CAB will review the same proposal for its aesthetic merit and its conformance with the established architectural and site design standards. The CAB consulting architect and landscape architect meet with the applicant's design professionals to critique the design of the proposal with respect to its site layout, amenities, architectural design of all buildings and structures, landscaping and hardscape, lighting and signage. 311.2. Exempt Development. The following activities that are defined as "exempt" shall not require submission of a site plan to the CAB pursuant to this section. Furthermore, the director's determination on exemption status shall be recognized for the following to either be subject to CAB review or to department's staff review (CAB Revisions) for minor amendments: Proposed construction for accessory structures that do not violate any specific provision of the Land Development Code may be exempt from CAB review, but subject to the established design standards. 311.3. General CAB Application Requirements. Refer to Sec. 310.3. 311.4. CAB Submission Requirements. CAB-New Construction, CAB-Renovation, and CAB-Revision application forms, along with all established and required fees, documents, and plans, shall be submitted to the city by the applicant to the community and economic development department. An application for CAB review shall include all of the drawings required in the department's Site Plan Submittal Requirements document. The Site Plan Submittal Requirements is a part of the city of Miramar's Land Development Process and Procedures Manual (rev. 2016). The manual may be revised from time to time by resolution of the city commission. 311.5. Final CAB Application Filing. A final site plan shall only be filed following a determination by the CAB that the preliminary site plan is in substantial conformance with the land development code. A final site plan, incorporating the CAB's recommendations, shall be approved by the city commission prior to issuance of any building permit. TABLE 5 COMMUNITY APPEARANCE APPROVAL PROCESS APPLICATION TYPE | EXEMPT 1 | REVISION (STAFF APPROVAL) | CAB APPROVAL | CITY COMMISSION RESIDENTIAL PROPERTY Single-family residence | ✓ Duplex | ✓ Triplex | ✓ 4 or more residential units within the TOC | ✓ New construction of single-family subdivision | ✓ | ✓ New construction of multi-family residential community (outside TOC) | ✓ | ✓ Increasing building footprint which does not increase the originally approved total floor area of the structure in excess of 50% | ✓ Increasing building footprint increases the originally approved total floor area of the structure in excess of 50% or that changes the nature of the development | ✓ | ✓ Installation of guardhouse and/or security gates meeting vehicular stacking requirements | ✓ Relocation of swimming pools on individual lots | ✓ Relocation of community swimming pools and site amenities | ✓ Additions/renovations to individual single- or dual-family or triplex residences | ✓ Relocation of parking spaces, drive aisles and driveways | ✓ Addition to existing sites of parking spaces | ✓ Addition/relocation of dumpster/compactor enclosures | ✓ Modifications of stairs or elevations of decks, porches, terraces, trees, hedges and fencing | ✓ Addition to existing sites of awnings, canopies or ornamental structures | ✓ Accessory uses which do not increase plot coverage of the principal structure on individual lots | ✓ Accessory uses which do not increase plot coverage of the principal structure for a community | ✓ NON-RESIDENTIAL PROPERTY Compliance Plan (no increase in building footprint) 2 | ✓ Cure Plan as a result of government takings which include façade renovation | ✓ New construction of commercial development | ✓ | ✓ New construction of industrial development | ✓ | ✓ New construction of community facilities | ✓ | ✓ New construction of city facilities | ✓ | ✓ Addition to existing sites of awnings, canopies or ornamental structures | ✓ Relocation of commercial swimming pools | ✓ Relocation of parking spaces, drive aisles and driveways | ✓ Addition/relocation of dumpster/compactor enclosures | ✓ Modifications of stairs or elevations of decks, porches, terraces, ramps, landscaping and/or fencing | ✓ Addition to existing sites of parking spaces | ✓ Increasing building footprint which does not increase the originally approved total floor area of the structure in excess of 50% | ✓ Increasing building footprint increases the originally approved total floor area of the structure in excess of 50% or that changes the nature of the development | ✓ | ✓ Construction of a new non-residential accessory structure | ✓ Renovation of buildings with no increase to building footprint (outside TOC) 2 | ✓ Renovation of buildings with an increase to building footprint 2 | ✓ Site plans in conjunction with a conditional use application | ✓ | ✓ Installation of guardhouse and security gates that meets vehicular stacking requirements | ✓ APPLICABLE TO ALL PROPERTY The deposit and contouring of fill on land that does not require resource extraction and removal of fill from site 3 | ✓ Land clearing activity done in compliance with a valid land clearing permit issued pursuant to this Code and a City Engineering Permit 3 | ✓ New construction/renovation of mixed-use development within TOC | ✓ New construction of mixed-use development outside of TOC | ✓ | ✓ Re-approval of Expired Site Plan approved by Commission | ✓ | ✓ Re-approval of Expired Site Plan approved by DRC | ✓ TELECOMMUNICATIONS FACILITIES Tower on City property | ✓ | ✓ Tower on private property | ✓ | ✓ Co-location of antennas on City property 4 | ✓ | ✓ Co-location of antennas on private property 4 | ✓ Distributed Antennas Systems (DAS) on public property 5 | ✓ Repair and maintenance of telecommunication sites subject to building permit 4 | ✓ 1 in all cases, shall be exempt from site plan review and subject to building and/or engineering permit review, provided that code requirements are met 2 subject to CAB approval, and in the case of Compliance Plans, Commission approval of funding 3 may be subject to Commission approval of a Conditional Use application per Section 319 4 includes rooftop mounted antenna systems 5 subject to City Code Article IV provisions 311.6. Community Appearance Board (CAB). The CAB shall require that the proposed development satisfies the following criteria: The CAB shall evaluate the proposal as it relates to conformance to the requirements of this land development code, and shall consider conformance with the character of the surrounding area, general layout of the site, architectural design of the structures, and whether the development as presented will enhance the quality of life in the city. The proposed development shall comply with: (1) The goals, objectives, policies and other applicable requirements of the city's comprehensive plan and Community Design Plan (CDP); and (2) The established architectural design standards and precedents; and (3) The aesthetic character of the surrounding properties. 311.7. City Commission Review. Except for plans qualified for exemption of the companion site plan amendment application, or as a minor community appearance revision, upon a determination by the department's planning staff, that the proposal complies with the review criteria and all applicable code provisions, the CAB application will be scheduled for review by the city commission and will be placed on the quasi-judicial portion of the city commission agenda for final city commission action in tandem with the related site plan application. Action by the Commission shall consist of one of the following: (1) Remand the proposal back to the CAB for review and recommendation; or (2) Continue or table the plan in order to obtain additional information; or (3) Approve, approve with conditions, or deny the plan. 311.8. Review Procedures for Amendments And Revisions. 311.8.1 Review Procedures for Amendments: (1) The CAB may either approve, approve with any reasonable conditions, limitations or requirements, disapprove, or postpone consideration of any application pending submittal of additional information which may be required to make a determination. The CAB shall submit the decision in a written report to the applicant. The report shall be provided to the applicant and kept on file in the department. (2) A CAB approval of the plan for development final without city commission review and determination, unless appealed by an adversely affected person. (3) If the plan is denied by the CAB or the applicant disagrees with conditions set forth on the approval, the applicant may appeal the decision to the city commission pursuant to the appeal process of this chapter. (4) Any adversely affected person may appeal the decision of the CAB pursuant to the appeal process of this chapter. The adversely affected party must file a notice of appeal, in a form approved by the city attorney, with the city clerk within fifteen (15) days of the CAB determination. 311.8.2 Review Procedures for Revisions: CAB plan revisions may be filed with the department for minor modifications to the approved plan or to existing construction. The scope of the proposed revisions is limited to the following: • Building footprint modifications that do not alter previously approved site functionality • Addition/elimination/relocation of accessory structures that do not alter previously approved site functionality • Alteration of landscaping or signage Department staff will review the application to determine if the proposed revisions do not compromise existing conditions, or a previously approved site layout. The director shall have the discretion based on the above guidelines to determine whether a proposed revision requires full or administrative site plan review. The applicant may appeal the decision of the director to the commission within 15 days of the decision, pursuant to the appeal procedure of this chapter. The decision of the city commission shall be final and binding upon the applicant. Staff shall either approve or deny the application or approve with conditions or after modifications are implemented. If an applicant is denied such approval, then the applicant may request a review by the full CAB, after paying the fee for a minor site plan amendment application. If the CAB denies the request, then the applicant may appeal to the city commission, pursuant to the appeal procedure of this chapter. The decision of the city commission shall be final and binding upon the applicant. 311.9. Approved Plans. Revised plans will be submitted to the department. Upon a finding that the plans are in conformance with the Code, the previous city commission approval or previous CAB approval as outlined in this section, the plans shall be considered for approved by the CAB. All building permit plans shall conform to the approved plans. Approved plans shall be signed and sealed by the professional preparing them. The issuance of temporary and final certificates of occupancy (TCOs and COs) is subject to zoning approval to ensure conformance with the CAB approved plans, after post-construction, on-site inspections have been completed and approved by department officials. 311.10. Reserved. 311.11 Community Appearance Board (CAB) review approval for development Proposals within the Transit Oriented Corridor (TOC) land use. 311.11.1 All proposed development within the TOC is subject to CAB review and approval. These CAB applications shall be exempt from city commission approval at a public hearing, in accordance with section 310.13.3.
(Ord. No. 17-07, § 6, 11-14-16; Ord. No. 18-01, § 2(Exh. B), 11-1-17; Ord. No. 20-08, § 2(Exh. C), 3-18-20)
Ask a question about Miramar law
Corpus searches the Miramar sections it holds and shows the ones that match, with their citations. Free, no sign-in.
