§ 316 — Engineering Permits, Final Engineering, and Roadway Plans

Code of the City of Miramar, Florida (Supp. No. 105: codified through Ordinance No. 26-10, adopted July 8, 2026) · Miramar Land Development Code § 316

Corpus is an independent public-information project, not the official City of Miramar website. Stable reference: corpuslaw.us/code/f5e3c9c5-8625-4f0e-a7aa-3f541b98895c

Sec. 316. - Engineering Permits, Final Engineering, and Roadway Plans.

316.1. Purpose. The review of engineering and subdivision plans by the city engineer and the issuance of the appropriate permits is required to ensure that all work is performed in conformance with generally accepted engineering standards and practices, and city specifications; and that all work is completed in a timely manner. 316.2. Final Subdivision Improvements Plan. 316.2.1. Filing. Prior to the issuance of an engineering construction permit, the applicant must submit a final detailed subdivision improvements plan in conformance with the city's plan review checklist. These plans shall show all information required for schematic improvements plans and all paving, grading, stormwater, drainage, water and sanitary sewer facilities to be provided by the applicant as part of the development. A final site plan shall be approved prior to approval of the final subdivision improvements plan. The applicant shall submit to the city the required signed and sealed plans which shall conform to the approved final plat and final site plan, the city's subdivision improvement standards and shall be 24 inches by 36 inches in size, to a scale of not more than one inch equals 50 feet, except where a smaller scale is approved by the city engineer. Appropriate security shall be provided for all public improvements. The engineer-of-record shall certify that the plans as submitted are in conformance with the approved site plan. The improvements plan shall include or be accompanied by the following: (1) A sealed current survey showing existing topography and existing improvements. The survey, at a scale of not be less than one inch equals 50 feet, shall include: a. Existing ground elevations on a grid system having a grid interval appropriate to the overall property; and b. Existing buildings, utility poles, underground utilities and other structures within 100 feet of the area included in the proposed plat; and c. Perimeter spot grades; and d. Certification that no dedications or improvements exist except as shown e. The survey shall be certified to and for reliance by the city and must be prepared by a registered and licensed Florida surveyor and mapper. The survey shall be current, meaning that the survey is no older than 180 days prior to the application (or brought up to date) and depicts current conditions on the subject property. Said survey shall be prepared in accordance with the minimum technical standards of F.S. § 472.027, and F.A.C. ch. 21HH-6, and attached as an exhibit to the application. (2) Engineering plans including, but not limited to: a. Locations, widths, profile elevations and types of all existing pavements, and type of pavement construction, such as rock base course, subgrade, pavers, asphalt, concrete, and pervious materials; and b. Locations and widths, centerline grades, and driveway locations of proposed street pavements, sidewalks, walkways and bike paths; and c. Location and description of proposed drainage structures, including length of exfiltration trenches, proposed finished floor elevations of building sites, gutters and inlets; and d. Direction of flow of gutters, ditches and swales and final disposition of stormwater; and e. Water distribution system, sewage collection system, lift stations, mains and the like; and f. Data on size and character of drainage area tributary to each inlet; latitude and longitude of all outfalls and culverts; percolation test data and design computations for runoff and sizing of drainage facilities; and g. Location and width of all existing and proposed easements for water, sewer, drainage and franchise utilities; and h. Typical sections of all proposed street pavements which shall include the following: 1. Width of pavement and crown slopes; and 2. Width and grade of gutters; and 3. Width and slope of shoulders; and 4. Width and grade of sidewalks; and 5. Side slopes to natural ground, including side ditches of canals, if any; and 6. Positions of right-of-way lines indicating existing and proposed dedication; and 7. Materials of road construction and other dimensions, such as thickness of base and surface course, conforming to city specifications. (3) Profile sheets showing proposed grades for street and stormwater drainage construction and water and sewer mains if requested by the city; and (4) An estimate of the cost of construction of all improvements shown on the improvements plan, sealed by a professional engineer registered in Florida; and (5) Final legal documentation acceptable to the city attorney ensuring perpetual maintenance of private roads, parking areas, drainage systems, common areas and landscaping within the adjacent public right-of-way; and (6) Wetland mitigation areas including grades; and (7) A plan which shows the relationship of landscaping to utilities and lighting; and (8) Any other information deemed necessary by the city engineer, utilities director or fire chief. 316.2.2. Review and Approval of Final Subdivision Improvement Plans. The city engineer shall review and approve the plans and accompanying cost estimate. 316.2.3. Modification of Design of Improvements. If at any time before or during the construction of the required improvements, it is demonstrated to the satisfaction of the city engineer that unforeseen conditions make it necessary or preferable to modify the location or design of such required improvements, the city engineer may approve modifications to the improvements plan. These modifications shall be within the spirit and intent of the commission's approval and shall not extend to the waiver or substantial alteration of the function of any improvements required by the city. Modifications shall substantially comply with an approved final site plan and/or final plat. The city shall issue any authorization in writing. The process for modification of approved plans shall be in the same manner as required by this section for the approval of the original plans. 316.2.4. Posting of Security. 316.2.4.1. Security Required. The applicant shall post a payment and surety bond, letter of credit drawn on a U.S. banking institution located in the state of Florida which institution is not an institution headquartered in a foreign nation, a cash escrow, or other security with the city in a form acceptable to the city attorney in the amount of 125 percent of the final estimated cost of construction of all required public improvements as approved by the city engineer. Improvements shall include, but not be limited to, roads, drainage, landscaping, irrigation, curb and gutter, sidewalks, lighting, and water and sewer utilities. This security shall be posted prior to the issuance of an engineering construction permit. The security shall be a guarantee that the improvements shall be made in accordance with approved plans and specifications. 316.2.4.2. Return of Funds. The original security may be reduced to 25 percent of the original amount, provided that: (1) The plat has been recorded; and (2) The required improvements are completed and ready for acceptance by the city; and (3) The release of liens have been received by the city; and (4) All required easements have been dedicated. The reduced security shall be continued for a period of one year (365 days) from the date of acceptance of the improvements by the commission to cover latent defects, maintenance and repairs. The owner/developer of the project shall in writing also warranty the improvements, and indemnify the city against the costs of removing, repairing, installing, and rehabilitation, all to cover latent defects, maintenance and repairs. 316.2.5. Construction of Improvements. 316.2.5.1. Inspection of Improvements. At least one day prior to commencing construction of required improvements, a pre-construction conference shall be scheduled and the applicant shall notify the city engineer in writing of the time when proposed to commence construction of such improvements. The construction permit shall not be issued until appropriate security, as described in section 316.2.4.1, has been posted by the applicant and accepted by the city, and all other necessary permits have been issued by applicable governmental entities. The developer shall, at its expense, and at no risk or expense to the city, retain the services of a registered and licensed Florida professional engineer for the purposes of providing necessary observation, directly or through an authorized representative, and certification to the city of the construction of public improvements to insure that construction is at all times in compliance with accepted construction practices and in compliance with the approved plans and specifications. The engineer-of-record shall keep accurate records of all required tests and inspection of public improvements. A copy of each field report shall be submitted to the city. 316.2.5.2. Proper Installation of Improvements. If the city finds upon inspection of the improvements that any of the required improvements have not been constructed in accordance with plans approved by the city engineer, the city may take action to stop construction or issuing further development permits. The city shall notify the applicant, and if necessary, the agency securing the applicant's performance, and shall take all necessary steps to preserve the city's rights under the security. 316.2.5.3. Completion of Improvements. The public improvements shown on the approved final subdivision improvements plans for that parcel or phase of construction, with the exception of the final lift of asphalt pavement and the permanent pavement markings, shall be completed and ready for acceptance by the appropriate governmental agencies prior to the first certificate of occupancy being issued by the building official for the parcel or phase of construction. 316.2.6. Engineering Construction Permit. No land development activity shall commence without first obtaining engineering plan approval, an engineering construction permit, and paying the appropriate fee(s) including: (1) Clearing and grubbing; and (2) Filling or excavation work; and (3) Road construction; and (4) Underground utility installation and/or rehabilitation; and/or any other related activity. 316.2.7. Engineering Excavation Permit. No excavation shall commence without first obtaining engineering plan approval of the excavation activity, an engineering excavation permit, and paying the appropriate fee. 316.2.8. Annual Permit for Mining, Quarrying or Excavation. An annually renewable engineering permit issued in accordance with the regulations of this Code shall not be transferable and shall be obtained prior to commencing any resource extraction activity pursuant to this Code. Said permit shall be renewed on the first day of each calendar year, subject to full compliance with all city requirements and regulations and the payment of any required fees. 316.2.9. Engineering Right-of-Way Crossing Permits. No right-of-way crossings that involve the cutting or removal of pavements shall commence without first obtaining plan approval, an engineering right-of-way crossing permit, and paying the appropriate fees. 316.2.10. Revocation of Engineering Permits. The city shall revoke any applicable engineering permit pursuant to any of the following situations: (1) Final plat approval has expired; or (2) The security posted with the city to guarantee the construction of the subdivision improvements is in default or has expired; or (3) Failure to commence engineering construction within one year (365 days) of the date of the engineering permit issuance and/or lapse of the engineering work on the site for a period of greater than ninety (90) days, after the one-year period, when there is no active city building construction permit in effect on the site; or (4) The absence of a designated developer's engineer-of-record for a period of seven (7) consecutive calendar days. Said engineer shall be as defined in F.S. ch. 471, representing the developer, in responsible charge of the permitted engineering work at all times. Any successive developer/builder's engineer for the job shall be able to document and produce, upon request, evidence that he or she has, in fact, repeated all the work done by the original engineer, per the requirements of chapter 61G15.27.001 of the Florida Administrative Code. The city engineer shall notify the developer in writing of the intention to revoke an engineering permit. The developer may appeal the decision to the city manager. 316.2.11. Roadway Plans Review by DRC. Roadway plans, which shall include all civil plans, as well as lighting and landscaping plans, shall be reviewed by the DRC. The city engineer and DRC Chair shall approve the roadway plans upon satisfaction of DRC representatives' comments and the payment of the review fee(s).

(Ord. No. 17-07, § 6, 11-14-16; Ord. No. 20-08, § 2(Exh. C), 3-18-20)