§ 5-56 — Environmental management permit
Code of General Ordinances of the City of Tallahassee, Florida (Supp. No. 75: codified through Ordinance No. 25-O-28, enacted December 10, 2025) · Tallahassee Land Development Code § 5-56
Corpus is an independent public-information project, not the official City of Tallahassee website. Stable reference: corpuslaw.us/code/be1b6a8e-cbda-459b-b774-592f8a79e196
Sec. 5-56. - Environmental management permit.
(a) Applicability. (1) Generally. Except as set forth in subsections (2) and (3) below, prior to engaging in any development activity either the property owner or property owner's authorized agent proposing to engage in such activity shall first apply for and obtain an environmental management permit or obtain a permit waiver. The director shall make a final determination if a question arises as to whether an environmental management permit is required. Requests for approval of development activity shall be made through a completed environmental management permit application along with all required information, pursuant to this section and other applicable sections of this chapter. (2) Single-family, two-family or three-family structures. The construction of one single-family detached structure, one two-family structure (duplex), or one three-family structure (triplex) or any other development activity which in the opinion of the director, are associated with these types of structures (i.e. accessory structures, driveways, etc.), are not required to submit a separate application for an environmental management permit. In these cases, the submittal and approval of a building permit application will satisfy the requirements of this section, provided the following information is included with the building permit application: a. A general location map of the site upon which any and all portions of the development will be located; b. Two copies of a site plan drawn to an appropriate engineering scale to fit on 8.5" x 11", 8.5" x 14" or 11" x 17" size paper; c. Street name, lot dimensions, setback dimensions, north arrow and all easements and restrictions must be shown on the site plan; d. All protected trees (this generally includes 12" diameter or larger) must be shown on the site plan with an indication of whether they are to be removed or to remain; e. The proposed limits of clearing and placement of all sediment and erosion controls; f. All existing and proposed structures labeled accordingly; g. Existing and proposed two-foot contour lines; h. The corners of the lot and the location of the house have been clearly flagged on the lot; i. Grading or other methods of stormwater conveyance to an approved stormwater management facility. (3) Site investigation activities. Notwithstanding the above requirements, limited clearing of an essential access necessary to conduct site investigation activities (such as soil borings and topographic and boundary surveys) shall be permissible without obtaining an environmental management permit provided the boundaries of conservation and preservation areas are depicted and the location of the proposed soil borings are shown on a topographic map. However, if the clearing activity is of a nature that requires use of power equipment, then written notice shall be filed and approval obtained from the director at least 24 hours prior to commencing any such clearing activity. The notice shall identify the site location, the purpose, limits and nature of clearing activity proposed as well as the name, address and phone number of the owner of the site and of the person to be performing such clearing. (b) Required information. It is the responsibility of the applicant to provide sufficient information for the director to evaluate the environmental characteristics of the affected areas, the potential and predicted impacts of the proposed activity on the site, the surrounding and downstream property, and the effectiveness and acceptability of those measures proposed by the applicant for reducing adverse impacts. The applicant shall provide maps, charts, graphs, tables, calculations, design summary reports, photographs, narrative descriptions and explanations, and citations to supporting references, as appropriate to communicate the information required by this section. All application information required herein, and other information filed by the applicant to support the application, shall become part of the application. (c) Components of environmental management permit. An environmental management permit application shall consist of the following components: stormwater, landscaping, and tree removal. Most applications for an environmental management permit will contain all three components. However, depending on the characteristics of each property and proposed development activity, some applications may only contain one or two components. (1) Stormwater management component. a. Projects with no significant change in surface water runoff characteristics or projects with an existing stormwater management facility. Projects with no significant change in surface water runoff characteristics, as certified by a registered professional engineer or projects that have an existing stormwater management facility to meet the stormwater management development standards set forth in section 5-86 of this chapter, shall provide adequate technical data and analysis to the director including the following: 1. A general location map, a legal description of the site or sites upon which any and all portions of the development will be located, a tax parcel identification number, and evidence of ownership; 2. A statement expressing the intent and scope of the proposed project; 3. A site plan showing: a grading plan, which includes pertinent contours of the areas adjacent to the site; the limits of proposed clearing; sedimentation and erosion control plans; existing and proposed structures; slopes; existing wells; natural or constructed stormwater management features; and minimum finished floor elevations for all proposed building lots and any proposed buildings, all of which shall comply with ordinances regulating structures in flood hazard areas; 4. Information evidencing compliance with all applicable floodplain management and flood hazard ordinances; 5. The name, local address and telephone number of an individual who shall be designated as the stormwater management control officer for the property, who shall have adequate authority within the project administration to ensure compliance with this chapter and who shall be responsible, at a minimum, for the day-to-day operation, maintenance and management of all stormwater, erosion, and sedimentation control techniques on-site during all development phases; 6. If applicable, acceptable evidence from a registered professional engineer based on standard engineering practice demonstrating that no significant change in surface water runoff characteristics from the site will result from the proposed development activity; 7. Evidence of capacity in a master stormwater facility is available and that the capacity has been reserved for the development; 8. Evidence of capacity within a conveyance to the master stormwater facility. b. Projects with a proposed on-site stormwater management facility. Projects that are proposing to construct an on-site stormwater management facility or modify an existing stormwater management facility to comply with the stormwater management development standards set forth in section 5-86 of this chapter shall provide adequate technical data and analysis to the director including the following: 1. General location map, a legal description of the site or sites upon which any portion of the development will be located, a tax parcel identification number, and evidence of ownership; 2. Site plan including: A. Overall grading plan for the site showing existing and proposed contours, and including contours of the areas adjacent to the site, clearly defined and legible and the limits of proposed clearing; B. All improvements proposed, including buildings, pavement, sidewalks, and other similar structures, clearly shown and labeled, and existing pavement and structures shown and labeled; C. Minimum finished floor elevations for any proposed buildings, and for building lots, which shall comply with applicable ordinances regulating structures in flood hazard areas; D. Type(s) of ground cover on pervious areas (such as grassed, landscaped, bare, wooded), including both before and after development; E. Bottom elevations, dimensions, and cross sections for detention and retention areas; F. Detailed drawings and dimensions for outfall structures from detention facilities, including storm drain inverts and sizes; G. Pipe sizes, inverts, and inlet types for interior conveyance systems; H. Swale locations, dimensions, and side slopes, along with specific proposed methods of stabilization; I. All wells, drainage easements, and areas to remain natural associated with the site, both existing and proposed; and J. Applicable flood boundaries for sites lying wholly or partially within the 25-year and 100-year floodplains, with cross sections and all other information necessary to show compliance with all applicable ordinances regulating structures in flood hazard areas. 3. Stormwater management design report and supporting computations providing: A. A written summary design report providing a discussion of the conclusions determined from the hydrologic and flood routing computations, stage, storage, discharge, and complete storm event information indicating compliance with this chapter and other information in written, tabular and graphic form to convey the techniques and design criteria utilized to ensure compliance with the provisions of this chapter. B. All runoff hydrograph and routing plots and computations, to show compliance with section 5-86, for both pre-development and post development conditions. Stormwater retention facilities shall be designed to contain the difference between the pre-development and post-development volume of runoff. It will also be necessary to compute the time required for the design volume to filtrate the bottom and side areas of the retention pond. Required volume for detention shall be computed through a storage indication method to route stormwater peak flows through the facility in compliance with section 5-86. C. Hydraulic computations showing that the outlet discharge matches outflows used in the detention basin routing computations for various stage-discharge relationships. If the outlet is submerged, the outlet discharge should reflect the effects of outlet submergence. D. Hydraulic capacity computations and flow velocities for drainage conveyances, including ditches, swales, pipes, and gutters. Plan profiles for all open conveyances and pipelines, with energy and hydraulic gradients shown thereon. E. All computations associated with floodplain determination and effects of site development on flood elevation both on and off the site. 4. A drainage area map indicating: A. Total drainage areas off-site and on-site, with sub-areas delineated on a topographic or other suitable map, labeled to correspond to those used in stormwater runoff computations. A maximum of two-foot contour elevation intervals shall be used; and B. Flows leaving the site traced to a receiving water body, with notes indicating all generally known locations where flooding occurs along this route. 5. Additional descriptive information presented in a narrative form, including: A. Environmental and land use characteristics, including zoning, current and proposed land uses, proximity to wetlands, water bodies, water courses, or other sensitive environmental features, and natural land cover, including any protected trees located on the site; B. An erosion and sediment control plan which utilizes structural and best management practice techniques appropriate to the site to inhibit the occurrence of erosion and to control sedimentation which would otherwise result upon failure of the erosion and sediment control techniques; C. A construction schedule setting forth a sequence of development activities which limits, the extent of areas disturbed at any one time so as to prevent the occurrence of erosion; D. If there are to be stormwater management facilities on-site after completion of the project which require operating permits pursuant to section 5-58, an operations and maintenance plan meeting the requirements of section 5-58; E. Information regarding off-site impacts anticipated as a result of the proposed development and means by which such impacts are to be mitigated. 6. Specific statements, indicating whether floodplains, wetlands, or protected trees exist on the site. (2) Landscape component. A landscape plan shall be submitted upon application for an environmental management permit for any development activity requiring landscaping according to section 5-83 and section 5-85. The landscape plan shall be submitted to the director and shall include adequate technical data and analysis including the following: a. A general location map, a legal description of the site or sites upon which any portion of the development will be located, a tax parcel identification number and evidence of ownership; b. Existing and proposed structures; c. Number of parking spaces required and proposed; d. Square footage of vehicular use areas; e. Zoning of the site and zoning restrictions affecting site use and development, including PUD or DRI conditions; f. Adjacent land uses and zoning; g. Species botanical and common name, sizes of material by dimension and container size, quantity, location by dimension of all trees, shrubs, and landscape materials and notation containing species diversity; h. Credit sought to be claimed for preserved trees with supporting information; i. Locations and types of utility lines and dumpsters; j. A reforestation schedule; k. A maintenance plan including location of an irrigation system ; l. Landscape area as a percentage of total site area and identification of those areas on the plan; m. Stormwater management facility area and/or urban canopy area claimed for landscape credit as a percentage of total site area and identification of those areas on the plan; n. Urban forest area as a percentage of total site area, and urban forest area claimed for urban forest/landscape credit as a percentage of total site area, with location of all such areas identified on the plan; o. Total urban forest area and landscape area including credits as a percentage of total site area; p. Interior landscape area delineations and calculations; q. Number of landscape islands compared to the total square footage of vehicular use area; r. Existing and proposed grades; and s. North arrow. (3) Tree removal component. A tree removal plan shall be submitted upon application for an environmental management permit for the removal of any protected tree, as set forth in section 5-83 of this chapter. The tree removal plan shall be submitted to the director and shall include adequate technical data and analysis including the following: a. Canopy road tree protection zone and patriarch tree removal applications. 1. The permit application for removal of trees and vegetation in the canopy road tree protection zone must be accompanied by a mitigation plan, which shall include, at a minimum, the following: A. An analysis documenting the purpose that necessitates the tree removal and explaining why the project cannot be modified to avoid the need for the tree removal. B. Canopy Road Citizens' Committee Review is required when impact is proposed within the canopy road tree protection zone. The canopy road tree protection zone analysis shall 1) clearly document the purpose of the tree removal and shall include an explanation as to why the project cannot be modified so as to avoid the tree and or vegetation removal; 2) describe both the vegetation and the roadway section affected; 3) include characteristics such as understory density and species composition, opacity, tree species and their corresponding diameter at breast height; 4) indicate whether high bank areas are present. Provide other materials (photographs, cross sections, etc.) useful in assessing the impact of the proposed development activity on the existing canopy road tree protection zone. The mitigation plan must mitigate the visual and vegetation impacts identified in the canopy road tree protection zone impact analysis. Trees removed from the canopy road tree protection zone must be mitigated or compensated for through additional plantings or donation to a replanting fund. Canopy road tree protection zone mitigation shall include understory vegetation (shrubs and groundcover) replacement. C. A procedure to be used to mitigate the visual and vegetative impacts identified in subsection (c)(3)a.1. above. 2. All permits for removal of protected trees, or for pruning for the purpose of maintenance of utility lines, within the canopy road tree protection zone unless such activity is conducted under an approved general permit, and all permits for removal of patriarch trees, shall be obtained by making application to the director, providing the same material to be submitted for permits for other protected trees as set forth in subsection (c)(3)b. below. 3. Prior to issuance of a permit the director shall conduct an on-site inspection. 4. If a patriarch or canopy road tree protection zone tree which is proposed for removal is located on right-of-way or other property belonging to the city, any permit for removal shall be conditioned upon the applicant obtaining approval of the removal from the commission. b. All other protected trees. 1. Permits for removal of protected trees, other than patriarch trees or trees located within a canopy road tree protection zone, shall be obtained by making application for permit to the director. The application shall be accompanied by a written statement and an area map including at a minimum, the following: A. A written, detailed justification for the proposed removal of each protected tree, which shall reference each tree on the required area map by map number designation for each such tree; B. The locations and dimensions of all existing and proposed vehicular use areas and other improvements, including finished elevations for each; C. Significant natural site features; D. Existing and proposed site contours; E. Existing protected or required trees to remain on site, and protected trees proposed to be removed, shall be indicated by a number assigned to each tree and noting DBH, species and critical protection zone. Indication of the general location of the trees, including blocks of trees, may be acceptable depending on site conditions and provided that a listing of individual trees by species and size is submitted; F. Existing and proposed utilities, underground and overhead, and location of any other known man-made on-site features, such as underground tanks or old building foundations; G. Building and other setbacks; H. Protected trees on adjacent property which may be affected by proposed development activity within the critical protection zone of such trees; and I. All applicable land use requirements pertaining to property use or restrictions, including easements, zoning, rezonings, plat reviews, and development orders; c. On-site inspection. Prior to the issuance of a permit for tree removal or relocation, the director shall conduct an on-site inspection. (d) Review process. The property owner and/or applicant are responsible for submitting an environmental management permit application in the application forms prescribed by the city to the director or designee. The application shall contain the necessary narrative and graphic information to determine compliance with the development standards set forth in article IV of this chapter. The director shall review the application and approve, approve with conditions, or deny the application. In the event the applicant fails to submit a completed application or any required additional information within 90 calendar days of notification of insufficiency, the director of growth management shall consider the application to be withdrawn. For applications that do not propose to construct a stormwater management facility to comply with the stormwater management development standards set forth in section 5-86 of this chapter, the director shall render a decision no later than seven working days after the application is submitted. For applications that propose the construction or modification of a stormwater management facility to comply with the stormwater management development standards set forth in section 5-86 of this chapter, the director shall render a decision no later than 20 working days after the application is submitted. (e) Amendments. A request for changes to plans approved for a permitted site shall be made as an application for amendment to the applicable permit. Substantial changes, including significant increases in impervious area, changes in intended land use, modification of stormwater management systems, any change that constitutes a major modification to a site plan or subdivision, new phases of development, or other additions, shall not be treated as amendments, but shall require a new permit application. Additional information submitted with a request for permit amendment shall be adequate to fully document the nature of the proposed change and the effect it will have on all environmental aspects regulated by this chapter. All plans, reports, calculations, and other information affected by the proposed amendment shall be updated so as to maintain an accurate record of the development activity. Review time for any changes to plans approved for a permitted site shall be the same as specified for the review of a new application. An amendment to a site plan and/or an environmental management permit shall not automatically extend the expiration date. (f) Revocation of permits. (1) By director. The director may revoke any permit issued pursuant to this chapter, following notice in writing to the permittee and after providing the permittee an opportunity to respond to the notice, in either of the following circumstances: a. If the director finds that the permittee has continued with, or caused to be continued, any development activity on a site for which a permit was issued, except for specified remedial work required to bring the development into compliance with the approved permit and plans, while the site is under a stop work order which has not been reversed, canceled, or suspended pursuant to this chapter; or b. If the director finds that the approval of the permit was based on incorrect information furnished by the applicant for the permit. Based upon such a finding, however, the director may make reasonably necessary modifications to the conditions of a permit in lieu of revoking it. (2) By commission. Upon application to the director and following notice in writing to the permittee at least ten calendar days before a public meeting to consider the revocation, at which meeting the permittee shall be given an opportunity to be heard, the commission may revoke any permit issued pursuant to this chapter, if the commission finds, upon evidence presented to it: a. That significant changes have occurred since approval of the permit and that continuance of the development activity or continued operation of a stormwater management facility, as permitted, would be detrimental to the public health or safety, the environment, or the property of others; or b. That the permittee has exhibited a repeated or chronic failure to comply with the permit. (g) Fees. (1) Amount and when payable. A permit application fee, in the amount established by the commission by resolution, shall be paid at the time any application is submitted for approval, amendment, or extension of a permit required by this chapter. Governmental entities shall not be charged a fee for operating permits. (2) Fee exemption for property on the local register of historic places and zoned historic preservation. An exemption is hereby provided from the payment of fees for those properties located within any area zoned historic preservation overlay and on the local register of historic places, as set forth in the Land Development Code. The provisions shall not exempt such properties from the requirement of acquiring applicable permits under this section, but shall provide that those permits are issued without the assessment of the fees provided for in this chapter and established by resolution of the commission. (h) Expiration. (1) Generally. Environmental management permits issued subsequent to the enactment of this chapter shall run with the land regardless of ownership, and shall be valid for a period not exceeding 36 months, unless otherwise specified by the director for master planned subdivisions, planned unit development projects, or public sector linear infrastructure projects pursuant to subsection 5-126(b). Permits may be extended, by request of the applicant and approval of the director, for successive periods of time not to exceed 12 months each, provided the request for extension is made prior to the expiration of the prior approval and provided a building permit has been issued and construction of the development has commenced. After expiration, the applicant must resubmit an application for a permit and comply with all requirements in effect at the time of resubmitting. (2) Permits issued by Leon County. After the adoption of the ordinance from which this chapter derives, the director may recommend to the commission that part or all of the permitting and enforcement functions related to a project within the city corporate limits, currently administered by the Leon County Environmental Department, be assumed by the city growth management department. Action to assume a segment of the permitting and enforcement process or the entire process for a specific project shall be approved by a majority vote of the commission. Said assumption of the permitting and enforcement process may include, but shall not be limited to, issuing stop work orders and the imposition of the provisions of this chapter. (3) Phased development. a. Permit life. The director may extend the expiration period of the initial permit for a phased development project to minimize continual re-administration of identical permits, provided that the master development plan filed for the original permit is definite with regard to location of infrastructure, land use categories, roadways, and other significant plan elements for all phases of development. b. Easements. 1. As a condition of an environmental management permit for a phased development project, easements shall be dedicated upon all upland property on the site (regardless of phase), prior to construction of the initial phase, for all stormwater management facilities shown on the master site development plan filed with the permit application. Should the location of future stormwater management system facilities be so indefinite as to preclude easement dedication, deed restrictions shall be required for all property on which easements are not dedicated requiring the future granting of stormwater management facility easements as necessary to insure that upland parcels within the same master plan can be developed in accordance with the land uses indicated on the master site development plan. Power of enforcement of easements or deed restrictions shall be granted to the city and to the benefited property owners. 2. Conservation easements must be dedicated to the city prior to the final approval of the first phase of the development. c. Phase review requirements. Prior to commencing site development of any phases subsequent to the initial phase, the following requirements shall be met: 1. Any change from the original master development plan which is proposed for the upcoming phase must be fully documented, submitted as a plan amendment request, and approved by the director as being compatible with the original master development plan for which an environmental management permit was issued. The master development plan must also be updated to reflect the change. 2. The applicant must demonstrate that all stormwater management facilities necessary for full build-out of the upcoming phase either presently exist or will be constructed in the upcoming phase. If any necessary stormwater facilities already exist as a result of improvements installed in earlier phases of the project, documentation must be presented that the existing facilities were constructed as required by the permit and that capacity is available and has been dedicated to serve development of the upcoming phase. (i) Appeals. No administrative appeal process is set forth in this chapter or any other city ordinance for environmental management permits. However, any relief available under other applicable laws, including § 163.3215, Florida Statutes is available.
(Ord. No. 04-O-02, § 2, Exh. 1(§ 3.6), 3-31-2004; Ord. No. 06-O-42AA, § 3, 7-12-2006; Ord. No. 08-O-44AA, § 1, 7-9-2008; Ord. No. 09-O-31AA, § 4, 10-29-2009)
Ask a question about Tallahassee law
Corpus searches the Tallahassee sections it holds and shows the ones that match, with their citations. Free, no sign-in.