Sec. 5-63. - Post-construction inspection, certification, and warranty for stormwater management facilities.
Prior to requesting a final inspection by the director pursuant to subsection 5-62(4), the permittee shall cause his registered engineer, or other person legally qualified to practice engineering under the exemptions established in Chapter 471, Florida Statutes, personally to inspect the facilities and certify as provided for in (1) below, those portions of the work for which engineering services were required for the obtaining of an environmental management permit. Normally, this engineer should be the engineer involved in the design and permit application work. If the improvements are of a nature which would prevent the engineer from certifying the correct installation with only a final review, the permittee shall ensure that the certifying engineer is adequately involved during construction to provide final certification of the facility as a whole. The certifying engineer shall also accompany the director during the final inspection of the project. (1) Record drawing and compliance report. Prior to requesting a final inspection or as part of an operating permit application, the permittee's engineering representative shall prepare and submit two complete sets of record drawings and shall certify on such plans that the facilities shown thereon have been constructed in the manner indicated. The certifying engineer shall additionally prepare and submit a report with the record drawings, which shall be entitled stormwater management plan compliance report, and in which the engineer shall make the determination of whether the stormwater management system, as constructed and shown on the record drawing, is in substantial compliance with the environmental management permit application. All substantial variations, including additions to or omissions from the approved plan, must be clearly identified in this report. The engineer shall address the effect of such variation on the intent of the original plan. If a variation substantially alters the resulting stormwater management facility performance from the intent of the original plan, the engineer shall identify what modifications and improvements are required to bring the project into substantial compliance with the approved plan. The report shall include all information required for adequate review of the conclusions made therein, and shall be certified by the engineer. For the purposes hereof, substantial variation shall include the following: a. An increase of more than five percent impervious areas; b. An increase of more than five percent of directly connected impervious areas; c. Significant alterations to the stormwater system, including holding ponds, conveyance systems, or discharge methods or locations; d. Significant changes to design, grade or additional fill or excavation which may affect runoff; e. Additional utilities or structures; f. Non-permitted removal of protected trees and notable variations in landscaping and required urban forest areas; and g. Reserved. h. Any change which conflicts with any state or local regulation. (2) Post-construction inspection. The director shall inspect the work and shall either approve it or notify the applicant in writing in what respects there has been a failure to comply with the requirements of the approved permit. The notice of completion and certificate of occupancy for the development project shall be withheld pending correction of all items not in compliance. Any portion of the work which does not comply shall be promptly corrected by the applicant, within a time period set forth by the director, or the applicant shall be subject to penalty provisions of subsection 5-142(g). (3) Certification as warranty. The permittee, through certification by his engineer that the stormwater management system is in substantial accordance with the permitted stormwater management plan and environmental management permit, shall be deemed to warrant the improvements certified, as follows: a. Warranty obligations. Should the stormwater management system improvements fail prematurely or not function as represented in the initial application for the environmental management permit, then the original permittee, even if the property has thereafter been transferred, shall perform any and all necessary maintenance or make whatever additional modifications, replacements or new improvements which are necessary to bring the stormwater management system into compliance with the representations made when applying for the initial environmental management permit. b. Warranty period. If the warranted facilities are dedicated to a local governmental entity, the warranty period shall commence with the formal dedication of the facilities and shall run for a period of one year. If the warranted facilities are to be maintained by others, the warranty shall commence with the issuance of a notice of completion by the director and shall run for a period of one year. c. Warranty enforcement. Prior to dedication of any facility to a local governmental entity and prior to issuance of a notice of completion by the director, the permittee shall execute a formal warranty agreement to ensure the fulfillment of all warranty obligation.
(Ord. No. 04-O-02, § 2, Exh. 1(§ 13.13), 3-31-2004)