§ 5-57 — General permit
Code of General Ordinances of the City of Tallahassee, Florida (Supp. No. 75: codified through Ordinance No. 25-O-28, enacted December 10, 2025) · Tallahassee Land Development Code § 5-57
Corpus is an independent public-information project, not the official City of Tallahassee website. Stable reference: corpuslaw.us/code/607bdb49-171f-412f-b8af-985ec7181d89
Sec. 5-57. - General permit.
(a) Introduction. A general permit authorizes governmental agencies, public or private utilities or telecommunication companies to undertake limited development activities or routine daily maintenance activities. (b) Scope and applicability. The issuance of a general permit does not waive any other requirements of this chapter. Any activity other than one of those enumerated below shall be undertaken only upon issuance of an environmental management permit: (1) New construction or reconstruction of overhead electric lines or overhead electric distribution lines not to exceed 5,000 feet in road rights-of-way owned by, or dedicated to the public. (2) New construction or reconstruction of overhead electric lines, overhead electric distribution lines or service lines (drops) not to exceed 3,000 feet when constructed in areas other than on public road right-of-way. (3) New underground service lines that do not extend more than 500 feet beyond public road right-of-way boundary lines. (Private) (4) New construction or reconstruction of underground electric lines, water and gas distribution lines, sanitary sewers and force mains, and underground telecommunications and cable television lines not to exceed 3,000 feet in road right-of-ways owned by, or dedicated to, the public, nor exceeding 500 linear feet beyond the right-of-ways for such roads. (5) Relocation of existing utilities required for development activity for which an approved environmental management permit has been obtained, but only when such relocation is performed concurrently with the permitted development activity and is consistent with the approved site plan. (6) The construction or reconstruction of stormwater conveyance systems not to exceed 1,000 feet in length or more than five structures. (7) The maintenance, construction, or reconstruction of sidewalks, curbs, milling or resurfacing existing roadways, or other similar activities, as determined by the director. (8) City, county, state, Blueprint 2000 or federal public works maintenance and/or construction activity that would not cause a net increase of 3,000 square feet or more of impervious area, with the exception of sidewalks. (9) Maintenance of existing parks and recreation facilities and landscape installations within the public rights-of-way, including minor landscape installations of 5,000 square feet or less, irrigation system installations within park boundaries and landscaped areas within the public rights-of-way, 1,000 square feet or less of additional impervious surface area, or other routine maintenance activities necessary to restore parks and recreation facilities or landscape installations within the public rights-of-way to original construction conditions or to meet current code requirements. (10) Routine daily maintenance of existing facilities or non-routine emergency maintenance requiring immediate response to protect public health, safety, and welfare. (11) Routine roadway, shoulder, ditch, stormwater facility maintenance, and rehabilitative activities necessary to restore such facilities to original construction conditions or to meet current code requirements. (12) Vegetation management for all existing overhead distribution or service lines within the right of way not to exceed 15 feet in width beyond the public right-of-way or easement. (c) Exceptions. The following activities and activities not listed in subsection (b) above are not authorized under the scope of a general permit and shall require the issuance of a separate environmental management permit: Development activity in a conservation or preservation area as addressed in section 5-81. If a conservation or preservation area is encountered for newly proposed or relocated utilities etc., both a natural features inventory and an environmental impact analysis are required. An environmental management permit shall follow the environmental impact analysis. Routine maintenance activities for existing utilities may be allowed provided they do not interfere with the beneficial functioning of the conservation or preservation area. Prior to undertaking maintenance activities, the applicant shall contact the senior environmental inspector and environmental biologist for review and approval of proposed activities. Removal of protected trees as addressed in section 5-83. Directional boring or rerouting of the utility is recommended and may be required in order to minimize impact to protected trees. (d) Required information. The applicant is responsible for submitting a general permit in the application forms prescribed by the director. The application shall contain the narratives and other information sufficient to evaluate the specific details of the routine procedures, authorized by the general permit. The information shall consider the environmental characteristics of the affected areas, the potential and predicted impacts of the proposed activity and the effectiveness and acceptability of those measures proposed by the applicant for reducing adverse impacts. In the event the applicant fails to submit a completed application or any required additional information within 90 calendar days of notification of insufficiency, the director of growth management shall consider the application to be withdrawn. The applicant shall provide, but shall not be limited to the following: (1) A scope and a narrative describing the activities to be undertaken. (2) Specific details and a description of the procedures anticipated to be authorized by the general permit. (3) Personnel responsible for overseeing that the requirements are followed. (4) Details and descriptions regarding sediment and erosion control measures and best management practices are to be used to prevent potential environmental impacts (5) Details and descriptions regarding tree protection techniques. (6) Design criteria and supportive calculations. (e) Amendments. Changes to the procedures manual shall be requested as permit amendments and must be approved by the director prior to implementation. The director may revoke the general permit and require that environmental management permits be obtained, as applicable, should procedural violations occur.
(Ord. No. 04-O-02, § 2, Exh. 1(§ 3.7), 3-31-2004; Ord. No. 08-O-44AA, § 2, 7-9-2008)
Ask a question about Tallahassee law
Corpus searches the Tallahassee sections it holds and shows the ones that match, with their citations. Free, no sign-in.
