For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 5-58 — Stormwater management facility operating permit

Code of General Ordinances of the City of Tallahassee, Florida (Supp. No. 75: codified through Ordinance No. 25-O-28, enacted December 10, 2025) · Tallahassee Land Development Code § 5-58

Corpus is an independent public-information project, not the official City of Tallahassee website. Stable reference: corpuslaw.us/code/7efbe764-fdac-4282-ae88-3b066c18bc5b

Sec. 5-58. - Stormwater management facility operating permit.

(a) Scope. Subsequent to construction of a stormwater retention or detention facility, no stormwater management facility shall be utilized until a stormwater management operating permit application meeting the requirements of this section as applicable, has been submitted, the required application fee has been paid, and such application has been approved by the director, except that the following facilities shall not be required to obtain an operating permit: (1) Facilities which have as their primary function the conveyance of stormwater and which specifically are not required by their permit or otherwise to provide for water quality treatment, flood attenuation, or volume retention; (2) Facilities in existence on February 1, 1982, which have not been modified since that time; (3) Prior to the time of a final inspection as provided for in subsection 5-62(d), facilities under construction which are part of a development plan authorized by an environmental management permit issued pursuant to this chapter and temporary facilities which are part of an erosion and sediment control plan for such a development site. (b) Permittees. When a stormwater management facility operating permit is necessary pursuant to the above requirements, the following individuals or entities shall be responsible for obtaining such permit and for insuring compliance with the requirements and conditions stipulated as a part thereof and with this chapter: (1) Facilities constructed or modified subsequent to adoption of this chapter. The owner of the property or property owner's association shall be named as "permittees" in the permit application. Once issued, the operating permit and the concurrent obligations shall transfer to the successors in interest of such permittees. If a facility for which an operating permit is required receives commingled stormwater from multiple parcels which either are not under a single ownership or were developed specifically for resale, the owners of all such parcels shall create, as their joint agent, a stormwater management facility property owners' association, which shall be duly registered as a corporation with the Florida Secretary of State. In such instance, the operating permit shall be issued to the property owners' association and such association shall be the permittee, although the individual owners shall remain liable on a pro rata basis for all costs relating to the facility. A neighborhood home owners' association, which exists for purposes supplemental to the permitting of a stormwater facility, may function as the stormwater management facility property owners' association provided the home owners' association is organized in such a manner as to meet the requirements established in this chapter for stormwater management facility property owners' associations. (2) Facilities constructed prior to adoption of this chapter. When a facility existed on the effective date of this chapter, and is not significantly modified subsequent thereto, the permittee shall be those persons or their legal successors in title, in whose interest the County or the Department of Environmental Protection (under the provisions of chapter 62, Florida Administrative Code) originally issued a permit. Once issued, the operating permit and the concurrent obligations shall transfer to subsequent legal successors in interest. If such an existing facility receives commingled stormwater from multiple private parcels which either are not under a single ownership or were developed specifically for resale, the owners of all such private parcels shall create a stormwater management facility property owners' association to act as their joint agent. The operating permit shall then be issued to the stormwater management facility property owners' association and such association shall be the permittee, although the individual owners shall remain liable on a pro rata basis for all costs relating to the facility. A neighborhood home owners' association may function as the stormwater management facility property owners' association under the conditions provided for in subsection (b)(1) above. If any pre-existing legal agreements exist which absolve an owner from responsibility for a facility receiving stormwater from their property, and these are presented to the director in written form, such an owner may not be required to participate in the stormwater management facility property owners' association. In such an instance, the individual or entity which accepted the responsibility for the facility in place of such owner shall instead be required to be a participant. (3) Government operated facilities. Notwithstanding subsections (b)(1) and (2) above, if a facility is constructed by or has been properly dedicated to a governmental entity, the permittee shall be that governmental entity. (c) Permit conditions. In addition to any explicit special conditions outlined in the operating permit, an implicit condition of all permits is that the permittee shall operate and maintain the facility in a manner consistent with the representations made in the application for the permit which authorized construction of the facility, and with the requirements of this chapter and other applicable local, state and federal regulations. (d) Expiration and renewal of operating permits. Operating permits shall expire three years subsequent to issuance or renewal. The permittee shall apply to the director for a permit renewal three months prior to expiration of the permit, as provided in subsection (i). (e) Stormwater management facility capacity accounting records. A record of total facility capacity, the capacities dedicated to individual sites, if any, and remaining available total facility capacity, must be maintained by the permittee if: (1) The facility is not exempt from operating permit requirements under this section, and (2) Some portion of the stormwater management facility capacity is to be utilized for stormwater from future development on multiple sites which are not residential use lots in a master planned subdivision. (f) Applications for stormwater facility operating permits. (1) Facilities constructed or modified subsequent to adoption of this chapter. Operating permits are required prior to final inspection and post-construction certification as provided for in section 5-62. The applicant shall be the permittee specified in subsection (b) of this section. The following information shall be required in the operating permit application: In the event the applicant fails to submit a completed application or any required additional information within 90 calendar days of notification of insufficiency, the director of growth management shall consider the application to be withdrawn. a. A property parcel map showing the location and tax parcel numbers of each parcel for which an owner is required, under subsection (b) of this section, to either obtain an operating permit or maintain membership in a stormwater management facility property owners' association. b. If the permit is to be issued to an individual or entity other than a stormwater management facility property owners' association, a listing of the names and addresses of all applicants with cross-references to the property parcel map identifying every parcel owned by each applicant. c. If the permit is to be issued to a stormwater management facility property owners' association, a copy of the articles of incorporation and pertinent bylaws, which have been approved by the director as meeting the requirements of Section 62-25.027, Florida Administrative Code, and other local government requirements if any, and which have been recorded in the Official Record Books of Leon County; a list of the names, addresses, and telephone numbers of all association members and officers; and a certificate of good standing for the association, issued by the Florida Secretary of State evidencing the formal establishment of the association. d. A narrative description of the facilities to be permitted. Multiple facilities which were constructed under a single environmental management permit may be permitted by the city under one operating permit, as practical. e. A general location map which indicates the relative location in the city and in the watershed of the facilities to be permitted, the property tax parcel numbers, and the names and addresses of the current owners of all parcels on which facilities are located, the limits of the drainage basin contributing to the facilities and the number of acres contributing runoff to each of the facilities. f. Information regarding operating capacities of the facilities, demonstrating that such capacities are not greater than those specified in the application for an environmental management permit unless approved design modifications were made in which event new calculations shall be provided. g. An operation and maintenance plan, including identification of an individual who shall be designated facility operator, and who shall be responsible for the day-to-day operation, maintenance and management of the facilities. The address and telephone number of the facility operator shall be provided. The plan shall clearly define how funding and supervision is to be provided and shall include an acceptable operation and maintenance outline specifying operating procedures and possible required facility adjustment, routine intermittent and annual maintenance including exercising of valves, cleaning of weirs and trash racks, mowing, dredging, replacing filter media and underdrains as applicable, and all other activities required to ensure that the facility performs as designed. Such an outline must include estimates of equipment required, man hours and crew size, schedules and an estimate of long term annual cost. (g) Renewal of operating permits. Operating permits shall be renewed every three years. The permittee shall apply to the director for a permit renewal at least three months, but not more than six months, prior to expiration of the permit. Late applications for operating permits renewal shall be subject to twice the normal fee. Renewal shall be granted by the director when each of the following conditions are met: (1) Inspection by the director, or sampling at the facility, confirms that all components are in good working order, that the facility is free of debris or excessive sediment deposits and is well stabilized, and that the facility is meeting or exceeding the design performance criteria specified in the environmental management permit and this chapter. Facilities for which no Environmental Management Permit was issued to authorize construction shall meet the facility performance criteria specified in Chapter 62-25, Florida Administrative Code. (2) If the operating permit being renewed was issued to an individual or entity other than a stormwater management facility property owners' association, the applicant submits updated records providing the names and addresses of current property owners who are required to maintain an operating permit under this ordinance. This list, through cross-referencing to the property parcel map filed with the original operating permit application, shall identify every parcel owned by each individual applicant. (3) If the operating permit being renewed was issued to a stormwater management facility property owners' association, the applicant provides a current list of the names, addresses and telephone numbers of all association members, the names of all association officers, any changes made in the association bylaws subsequent to issuance of the previous operating permits, and a current certificate of good standing for the association issued by the Florida Secretary of State. (4) The applicant provides the name, address and telephone number of the individual responsible for day-to-day operation, maintenance and management of the facility and who shall be designated as facility operator. (5) The applicant presents up-to-date stormwater facility capacity accounting records if maintenance of such records is required under subsection (e) of this section. (6) The applicant agrees to make such modifications, improvements, or operation or maintenance changes necessary to meet the requirements of this chapter. (h) Applications by governmental entities for operating permits. When a facility is to be operated and maintained by a governmental entity, an operating permit shall be issued upon submission by the governmental entity of evidence that the facility is to be maintained as a part of an overall plan of maintenance for the master stormwater management system. The plan must conform with the standards of this chapter, and evidence of compliance with state water quality standards must be provided. Such a permit shall be renewed provided the governmental entity submits evidence of continued performance of required maintenance under the overall system maintenance plan.

(Ord. No. 04-O-02, § 2, Exh. 1(§ 3.8), 3-31-2004; Ord. No. 09-O-31AA, § 5, 10-29-2009)

Ask a question about Tallahassee law

Corpus searches the Tallahassee sections it holds and shows the ones that match, with their citations. Free, no sign-in.