Sec. 5-86. - Stormwater management design standards.

(a) Applicability. No person shall engage in any development activity that causes changes in the predevelopment rate, volume, quality, or direction of stormwater flow leaving the development site unless potentially significant off-site adverse impacts are managed by appropriate measures in accordance with the requirements of this section. No person shall change, or allow to be changed, the contour, topography, use, or vegetation cover of land owned or controlled by such person unless stormwater runoff and sedimentation are controlled. New point discharges of stormwater shall not be allowed unless such discharge is into an adequate and approved conveyance or watercourse of sufficient capacity at the time of discharge to convey such discharges. If a deficiency exists in the conveyance, then that deficiency shall not be increased. Design of stormwater management systems shall not allow off-site increases in rate or changes in course that are substantially different from predevelopment conditions. Increases in the discharge rate at which stormwater leaves a site shall not be allowed, unless such discharge is into an approved master facility. In closed basins, increases in the volume of stormwater leaving a site shall not be allowed, unless such discharge is into an approved master facility. (b) Exemptions. The following practices shall be exempt from the requirements of this section: (1) Single-family, two-family or three-family structures; (2) As necessary for bona fide agricultural uses other than silviculture projects; or (3) As related to accessory home gardening and customary routine landscape maintenance; or (4) For soil or ground cover disturbance in connection with permitted removal of an individual tree, in which case the disturbance shall be limited to that necessary to remove the stump. (c) Water quality treatment standards. (1) Generally. Stormwater shall be treated in accordance with the provisions of subsection (c)(2) below, before it is discharged off-site, unless the stormwater is approved for discharge into an approved master stormwater treatment facility permitted for the site. All treatment facilities shall be designed and constructed so as to remain completely functional for the intended treatment purposes during a 25-year return frequency storm. Water quality treatment shall be provided as a part of all development activity that requires a stormwater application under this chapter and is consistent with the redevelopment provisions of article V. (2) Stormwater water quality standard. The following stormwater water quality treatment measures shall be used in the city. The drainage area for determining treatment volumes shall include all areas draining to the facility (on-site and off-site). a. Wet detention. The wet detention treatment volumes shall be, at a minimum, the runoff from the first three inches of rainfall, or as option, for sites with drainage areas less than 100 acres, the first 1.5 inches of runoff. No more than half of the volume may be discharged in the first 60 hours. b. Off-line retention. Off-line retention treatment volume shall be at least the first 0.75 inch of runoff. The treatment volume shall again be available within 72 hours following a storm event. c. On-line retention or detention with filtration. For on-line retention, or detention with under-drain filtration, the treatment volume shall be at least the first 1.125 inches of runoff. Retention basins shall again provide the capacity for the required treatment volume of stormwater within 72 hours following the storm event. Detention basins with filtration systems shall again provide the capacity for the specified treatment volume of stormwater within 72 hours following a storm event. d. Special site constraints. If site constraints require another method of water quality treatment, such other method may be approved by the director if it provides treatment of at least the first 1.125 inches of runoff. (3) Additional pre-treatment for intensive land uses. Additional pre-treatment shall be required for any new land use or change of land use that involves, as a principal activity, the sale or handling of petroleum products; the repair, maintenance, or cleaning of motor vehicles; the outside storage of fertilizers; or the production, distribution, or use of any hazardous material regulated by any state, federal, or local government agency with jurisdiction and shall include a separate and distinct stormwater management system to treat the runoff from those areas where such activities are conducted. It shall provide intensive pre-treatment and removal of such products or pollutants from the runoff prior to discharge into the stormwater treatment system serving the other areas of the site. However, if in the opinion of the director, the principal activities identified above are conducted and managed in a manner that does not pose a risk of such products or pollutants from commingling with the off-site stormwater runoff, then additional pre-treatment is not required. (4) Runoff buffers. For sites that will contain less than 10,000 square feet or ten percent of impervious surface, whichever is less, runoff buffers may be allowed. Runoff buffers are alternatives to stormwater treatment facilities. They shall utilize landscaped buffers or urban forest areas as a means of treating runoff. The applicant shall demonstrate that no adverse impacts will result and that the purposes and standards of this section are met. (d) Rate control standards. (1) Generally. On-site peak post-development stormwater discharge rates shall not exceed the peak predevelopment discharge rates for all intensities, durations, and return frequencies up to and including the 25-year storm period. The stormwater analysis shall demonstrate that total post-development discharges and stages shall not exceed the capacity on any downstream link, or if a level of service deficiency exists, it shall not be increased. The critical duration storm shall be considered that duration storm that produces maximum rates for any given frequency. When new development or redevelopment is occurring on a site, the analysis of pre-development runoff shall use the current site conditions. These rate control requirements shall not apply to discharges made to off-site stormwater facilities as provided for in subsection (h) of this section or to discharges directly into waterbodies which are of sufficient size to receive the discharges with negligible adverse effects. Stormwater software models shall be acceptable to the director. (2) Limits of analysis. The upper limit of a downstream conveyance analysis is defined as the boundary of all areas contributing hydrologically to the lower limit. The lower limit of the analysis shall generally be defined as the point along the downstream conveyance where the peak runoff rate from the site, during predevelopment conditions, is 2.5 percent of the total flow in the conveyance. If a level of service deficiency has been identified further downstream, the lower limit may be extended through the deficiency. Prior to submitting a conveyance analysis, the limits of analysis must be discussed and formally agreed to by the director. (3) Exemptions. The following exemptions shall apply: a. Discharges made to off-site stormwater facilities, as provided for in subsection (h) of this section, or b. Discharges directly into water bodies of sufficient size to receive the discharges with negligible adverse effects. (4) Restricted surface discharge analysis. In lieu of providing a downstream analysis, a stormwater management facility may be designed for restricted discharge. The post-development discharge is restricted to the critical duration two-year predevelopment rate for all duration and return frequencies up to and including the 25-year, 24-hour storm event. The total required detention volume shall again be available within 90 hours following a rainfall event. In this case, the lower limit of the analysis is defined as the point where concentrated discharge leaves the site. At the discretion of the director, a conveyance analysis shall be required if problem areas have been identified downstream. (5) Rate control and conveyance level of service standards. The adopted level of service standards shall be used as the basis for determining the availability of the facility capacity, and the system demand generated by development. In instances where an off-site deficiency currently exists, the deficiency shall not be increased as the result of any development or land use change. The design and construction of stormwater management systems shall be consistent with the following minimum level of service standards: a. One-hundred-year critical storm event. 1. No flood water in new buildings or existing buildings. 2. Overland flow capacity available for all flow in excess of capacity of underground and open channel conveyance systems. b. Twenty-five-year or less critical storm event. 1. No flood water more than six inches deep in local roads, parking lots, or other non-street vehicular or pedestrian use areas. 2. No flood water in one driving lane each direction of collector streets. No flood water in two driving lanes each direction of arterial streets. 3. Underground pipelines may be designed for lesser magnitude storms, provided an overland conveyance is provided. The open channel conveyance shall be designed for the full 25-year storm. 4. The post-development discharge rate from the site shall not exceed the predevelopment discharge rate. c. Ten-year or less critical storm event. 1. No flood water in one driving lane of local roads. 2. No flood water in driving lanes of any road other than a local road. 3. Underground conveyance not overflowing in business and commercial districts. d. Five-year or less critical storm event. 1. No flood water in the driving lanes of any roadways. 2. Underground conveyances not overflowing in residential districts. e. Two-year critical storm event. The post-development discharge rate from the site shall not exceed the predevelopment discharge rate. (e) Volume control standards in regulated closed basins. (1) Generally. A closed basin is defined as any naturally depressed portion of the earth's surface for which there is no natural outlet for runoff other than percolation, evaporation, or transpiration. A closed basin shall be regulated if it can be shown that cumulative increases in runoff volume from potential development patterns will cause an adverse impact on the frequency, duration, or extent of flooding. This determination shall be based on a hydrologic analysis. Regulated closed basins shall comply with the following requirements. (2) Volume control standards. Runoff volumes within regulated closed basins in excess of the predevelopment runoff volume shall be retained for all storm events up to a 100-year, 24-hour duration storm, with the following exceptions: a. Regulated closed basins that "overflow" or "pop-off" shall provide volume control for all 24-hour duration storm events up to the frequency of the storm that naturally over-flows the basin. b. If multiple development sites are located within the closed basin, said excess volume may be discharged to an approved regional retention facility located within the closed basin, pursuant to subsection (h) of this section. (3) One-hundred-year storm event flood elevation. On-grade structures or other development activity shall not be allowed below the 100-year flood elevation except those which are approvable under this chapter, and relate to landscaping, stormwater management, sidewalks, roads, and outside passive recreation facilities. All property of the applicant located within the 100-year storm event floodplain shall be encumbered with a conservation easement. This easement shall be dedicated to the city. The conservation easement shall prohibit all uses which violate this restriction. (4) Inter-basin transfers. Transfer of stormwater runoff from a closed basin to another drainage basin, shall not be allowed except when either conditions a. and c., or b. and c. identified below are met: a. The inter-basin transfer is necessary for a public sector project, or a private/public joint venture, either of which must benefit a broad segment of the community; b. The inter-basin transfer mitigates an existing stormwater problem; c. An assessment has been made, to the satisfaction of the director, indicating minimal negative impacts to the receiving watershed relative to water quality, quantity, and rate of discharge. The assessment of impact to the receiving watershed shall be a detailed study. This study shall address the specific impacts of the immediate development activity proposed, and the potential cumulative impact on the receiving watershed and waterbodies that would result from continued inter-basin transfers within the watershed. (f) Stormwater management facilities design standards. All stormwater systems shall be designed using the latest edition of the Florida Department of Environmental Protection's Florida Development Manual, or other methods as approved by the director, to prevent violations of state water quality standards. (1) Retention facilities. An analysis shall be performed to confirm the stormwater retention facility retains the required volume of runoff as required by this section. Retention facilities in regulated closed basins shall be designed in accordance with the closed basin standards specified in subsection (e) of this section. Retention facilities with no outlet or downstream conveyance that are not in regulated closed basins shall be designed in accordance with closed basin standards. It shall be demonstrated that the total required retention volume shall be available within 90 hours following a rainfall event. As an alternative, a continuous hydrologic simulation over an extended rainfall period selected by the director may be analyzed to demonstrate that retention requirements are met. Compliance with the above requirements can be demonstrated through one of the following three methodologies: a. Option 1. On the basis of the soil infiltration rates listed below, demonstrate the total required retention volume is recovered within 90 hours. The soil texture class used for the above analysis shall be the more restrictive of either the proposed bottom of the retention facility elevation or that of a deeper stratum of lower permeability. The USDA soil texture class shall be based on a particle-size distribution analysis of soil borings indicative of the retention pond area. Soil borings shall be conducted to a minimum depth of 20 feet below the proposed bottom of the retention facility and identify subsurface strata variations. USDA Soil texture class | Infiltration rate (Inches per hour) Sand | 4.74 Loamy Sand | 1.18 Sandy Loam | 0.43 Loam | 0.26 Silt Loam | 0.13 Sandy Clay Loam | 0.06 Clay Loam | 0.04 Silty Clay Loam | 0.04 Sandy Clay | 0.02 Silty Clay | 0.02 Clay | 0.01 b. Option 2. On the basis of a subsurface geotechnical analysis of each proposed retention facility, demonstrate the total required retention volume is recovered within 90 hours. This alternative is virtually the same as option one, however infiltration rates are acquired through a geotechnical analysis. The determination of infiltration rates shall be based upon an infiltration analysis using "undisturbed" soil borings or a double-ring infiltrometer test (conducted per A.S.T.M.) at or below the bottom of the proposed retention facility. In either case, a soil boring shall be conducted to a minimum depth of 20 feet below the bottom of the proposed retention facility. A geotechnical report, prepared and certified by a licensed professional engineer qualified to do such a report, pursuant to Florida Statutes 471, shall address the following: 1. What is the saturated soil infiltration rate below the retention facility? 2. Do confining layers exist below the proposed retention facility that will restrict infiltration? 3. Is groundwater mounding likely to occur in the retention facility? 4. Report the recommended "design" infiltration rate to be used for the design of the proposed retention facility. The recommended "design" infiltration rate should consider impacts from construction operations, groundwater mounding and long term operation of the retention facility. c. Option 3. On the basis of a subsurface geotechnical analysis (see Option 2) demonstrate the functionality of the retention facility through a continuous hydrologic simulation. The analysis shall clearly demonstrate that the increase in runoff volume above the predevelopment condition is retained within the on-site stormwater facility. Additionally, the rate of discharge shall not exceed predevelopment rates for all duration and return frequencies up to and including the 25-year critical duration storm. The continuous hydrologic simulation can be accomplished by developing a stage/storage/infiltration relationship based on the proposed retention facility configuration and reported design infiltration rate, as determined in Option 1 or 2. This relationship can be used to model the retention facility over an extended period of rainfall. The rainfall record to be used in the analysis will be provided by the city. (2) Filter systems. Side bank filters shall be utilized. Bottom filters or mounded filters may be approved if it can be demonstrated that there is absolutely no other alternative. (3) Side slopes. The side slopes of detention and retention facilities shall be sodded and the perimeter of all open-air stormwater management facilities with side slopes greater than 4:1 shall be landscaped pursuant to subsection (f)(8) of this section. If any part of a stormwater facility utilizes retaining walls or grades steeper than 4:1, that portion of the facility shall be surrounded by green, brown or black vinyl coated fencing at least four feet in height. If the retaining wall extends at least four feet above the ground level on the high side, no fence is required. A certified stability analysis shall be provided for all ponds with cut slopes greater than 2:1, fill slopes greater than 3:1. (4) Overflow systems. Stormwater detention and retention facilities shall include overflow design features as necessary to minimize the risk of any significant adverse impacts caused by overtopping during storms up to and including 100-year storm events. There shall be at least one foot of freeboard above the peak stage of the 100-year critical storm event and below the top of the pond. (5) Fifty-year design life. Major structural components, including but not limited to pipelines, culverts, retaining walls, and channel linings, shall be designed and constructed to have a minimum 50-year design life. (6) Ditches. Ditch side slopes shall be no steeper than 3:1, unless paved, in which case a 2:1 maximum slide slope will be allowed for depths greater than one foot and 1:1 for depths up to one foot. Ditches may be seeded and mulched if the peak velocity of stormwater is from 0 to 2.5 feet per second. They shall be sodded if the velocity is 2.5 to 4.0 feet per second. They shall be paved if the velocity is greater than 4.0 feet per second. However, sodding may be allowed for velocities from 4.0 to 5.5 feet per second if sod is lap-staked and joint staggered. Alternate stabilization techniques may be allowed provided it is demonstrated that ditch integrity is maintained. Peak stormwater velocities shall be calculated on the basis of the 25-year critical duration storm event. (7) Retaining walls. The height of all retaining walls (excluding stem walls constructed as part of a building foundation) shall not exceed 15 feet. Multiple retaining walls may be allowed for terracing. The distance between retaining walls shall be, at a minimum, twice the height of the wall that is abutting the area and higher than the area. A building permit shall be obtained for all retaining walls, as required by the Florida Building Code. In addition, when retaining walls are utilized they shall be constructed of finished concrete, concrete block, natural rock or architectural concrete block. Raw concrete block walls shall be provided with an approved vegetative cover capable of achieving 80 percent wall coverage within three years from the time of planting. Painting or staining shall not be considered an architectural finish. (8) Landscaping requirements. The perimeter of all open-air stormwater management facilities shall be landscaped with one shrub per three linear feet. Shrubs shall comply with the planting requirements set forth in subsection 5-85(m)(7) and shall be located on the outside of the fence, if a fence is required. (9) Stormwater management facility design requirements for landscape credit. Stormwater management facilities can be counted towards the landscaping requirements in subsection 5-85(d) as follows: a. When the size of all lots, parcels or sites involved in the development total between zero and two acres. The stormwater management facility can be counted toward the landscaping requirements, provided the facility is designed in a manner that integrates it into the landscape theme to the maximum extent feasible and provided the requirements in subsections (f)(10) and (11) of this section are met. b. When the size of all lots, parcels or sites involved in the development total over two acres. The stormwater management facility can be counted toward landscaping requirements as follows: 1. Wet detention ponds. A credit in the amount of 100 percent of the pond area, provided the pond meets the requirements set forth in subsections (f)(10) and (11) of this section. 2. Dry retention/detention ponds. A credit in the amount of 100 percent of the pond area for side slopes of 4:1 or flatter along at least 50 percent of the pond perimeter and a credit of 50 percent of the pond area for side slopes greater than 4:1, provided the pond meets the minimum standards set forth in subsections (f)(10) and (11) of this section. (10) General criteria for stormwater management facility design. a. The stormwater management facility shall be designed and constructed using predominantly non-angular, freeform, curvilinear contouring that functions to visually integrate the facility into the overall landscape design for the site to the greatest extent possible. b. Planting specifications and species for stormwater management facility landscaping shall be suitable for individual pond characteristics of soil, slope, aspect, hydroperiod and microclimate and approved by the growth management biologist. c. The pond area shall be the area encompassed by the pond's maximum contour line. (11) Plant material requirements. a. Wet detention facilities. 1. Pond perimeter. Appropriate species of aquatic plants, as approved by the growth management biologist, shall be placed so as to provide a continuous planting along 80 percent of the perimeter defining the pond's mean high water level within two years of planting. 2. Pond area. Planting specifications and species for stormwater management facility landscaping shall be suitable for individual pond characteristics of soil, slope, aspect, hydroperiod and microclimate, and approved by the growth management biologist. b. Dry detention/retention facilities. 1. All swales and berms shall be sodded. 2. Appropriate species of shrubs and understory trees shall be grouped so as to provide an aesthetically pleasing appearance, as determined by the growth management biologist. Planting specifications and species for stormwater management facility landscaping shall be suitable for individual pond characteristics of soil, slope, aspect, hydroperiod and microclimate and approved by the growth management biologist. (12) Use of sediment sumps. Sediment sumps shall be located at all points of concentrated inflows into the pond. (g) Stormwater management facilities maintenance design provisions. (1) Generally. All stormwater management facilities shall be operated and maintained in accordance with the following: a. Any operation and maintenance plans provided in the application for an environmental management permit, b. The requirements and conditions of any other permit which authorized construction of the facility, and c. The stormwater management facility operating permit. Failure to do so shall be a violation of this chapter. If the facilities are of a temporary nature, or if they do not have an operation and maintenance plan, they shall be maintained in a condition that will assure the proper functioning. They shall function for the purpose installed and be consistent with the objectives of this chapter. (2) Provisions for maintenance. The design and construction of all facilities shall include adequate provisions, including easements and rights-of-ways, to accommodate maintenance activities for the proper operation of the facility. (3) Required disclaimers. Any project for which stormwater management is provided by a system or facility not maintained by the city shall contain the following statement on the plans: "The City of Tallahassee is not responsible for the maintenance, upkeep or improvement of any stormwater management facility utilized by the land described herein. Title to this property carries with it the requirement that the current and all subsequent owners or their authorized agent obtain a Stormwater Management Facility Operating Permit from the City. The owner of this property shall be legally responsible, jointly with other owners using the facility and based on pro rata share, for compliance with all stormwater management facility operating permit maintenance and operation requirements, as well as all other permit conditions." (h) Regional stormwater management facilities. (1) Use of regional stormwater facilities. When stormwater runoff is discharged into a regional stormwater management facility the following criteria shall be met: a. Stormwater conveyances and stormwater management systems shall be designed and constructed to function after all uphill properties draining to the master facility have been developed. When actual construction of master facilities is required, costs shall be apportioned on a pro rata basis, based on impervious area, among the users of the facility. Prior to adoption of a master stormwater management system plan, the easements for such facilities shall be required. The design of conveyances is not required at this time. The size of the easements and the design of required facilities shall be sufficient to account for the increased rate of stormwater runoff anticipated after all uphill property is developed. Should the intended use for the uphill property not be known, the design shall presume maximum impervious areas allowed; b. The facilities shall be constructed and maintained in accordance with the requirements of this article; c. Adequate provision shall be made for acquisition, construction, operation, and maintenance costs of the facilities; d. Written authorization from the owner allowing use of the facility will be required. All information related to the proposed use of the facilities shall be provided by the applicant as part of the permit application; e. Water quality discharge requirements shall be provided by the regional facility, or by some other approved treatment facility into which discharge shall enter. f. Evidence of capacity of the facility demonstrating that there is capacity available for the applicant, and that capacity is being dedicated and reserved for the applicant. g. Whenever practical, necessary, and in the public interest or as part of an approved master stormwater management system, the city may acquire land and construct stormwater management systems. The design, land acquisition, construction, operations and maintenance costs for these facilities shall be funded through stormwater utility fees. Where feasible, the director may allow or require that individual developments utilize capacity in such public facilities as an alternative to constructing on-site stormwater facilities required by this chapter. In such an instance, a one time capacity charge shall be paid by the development entity which is proportional to the capacity required. When the city requires that a development use an off-site public facility, the capacity charged shall not be greater than the cost which would be incurred by the development entity for the construction of an adequate on-site facility. Operations and maintenance costs for such dedicated capacity shall be funded through routine stormwater utility fees. h. When regional/multi-site retention or detention is required, pursuant to this subsection, the local government having primary jurisdiction over the site shall ensure that: 1. Design of the facility and related systems is consistent with the provisions of this article; 2. Use of the facility is available to as many current and future development sites as practical; and 3. An equitable cost-sharing arrangement is available for the acquisition, construction, and maintenance costs of the facility. i. All existing developed areas not in compliance with state and local water quality discharge requirements, including sites which might otherwise be in compliance as a result of exemptions in Chapter 62-25, Florida Administrative Code, relating to existing systems, discharges, and pollution loads shall be addressed through a government administered regional water quality retrofit program. The objective of the retrofit program is to provide stormwater quality treatment capacity to existing sites which were never previously provided with capacity. Retrofit program objectives may be addressed in multi-purpose stormwater facility projects which address other objectives such as flood attenuation or treatment capacity for future development. 1. Implementation of the retrofit program shall be based upon a basin-by-basin management plan approved by the commission. Priorities for various basins and sub-basins shall be established based on review of available technical information. 2. The city shall identify, acquire, and construct suitable regional water quality facilities capable of controlling and treating the stormwater volumes, rate, and quality. 3. The retrofit program shall be funded from the stormwater utility fee. Subsequent to the actual construction of retrofit facilities, recipients of stormwater utility bills for properties served by a private stormwater management facility for which a final stormwater management operating permit has been issued, shall be eligible for partial credit on the stormwater utility fee. The credits shall be a percentage adopted by resolution by the commission as a part of the utility fee structure. Subsequent to implementation of such a credit program, application must be made to the director. The application shall be accompanied by documentation that the stormwater runoff from the eligible property is being conveyed to a stormwater management facility for which a valid final stormwater facility operating permit has been issued. (2) A development may use an off-site facility in-lieu-of constructing a detention or retention facility provided: a. Water quality standards for the stormwater discharge from the site as required in subsection (c) of this section are satisfied through provisions for actual treatment and not through any exemptions relating to modifications to existing systems or discharges which might otherwise be available under Chapter 62-25 of the Florida Administrative Code. b. If a regional stormwater management facility has been planned but does not yet exist, then interim facilities that attenuate to existing conditions shall be provided. c. If the redevelopment discharge rate is to be in excess of the discharge rate prior to redevelopment, then an adequate off-site conveyance must be available or must be provided by the applicant. (i) Discharge to sinkholes. Discharge of stormwater runoff into any active sinkhole shall conform to the following: (1) Runoff treatment. Runoff to be discharged directly into the sink shall be treated to comply with section 62-28.700(2), Florida Administrative Code, prior to discharge. (2) Discharge prohibitions. Projects involving intensive land uses shall not discharge any stormwater runoff into an active sink. (j) Stormwater standards for roadway projects. This section sets forth the stormwater management standards for roadway projects proposed by a governmental entity, or a non-governmental entity if the roadway project is required as an off-site improvement by a development order or permit. Roadway projects proposed by a non-governmental entity for on-site improvements (i.e. roadways proposed for a new subdivision) are not subject to the types of classifications set forth in this section. Roadway projects proposed by a non-governmental entity for on-site improvements are considered as part of any other development activity proposed for the project and must comply with the stormwater management requirements set forth in this section of this chapter. (1) Types of roadway projects. Roadway projects are classified as either major, type II minor, type I minor, or insignificant. The applicability and actual requirements of each type of roadway project are as follows: a. Major roadway project. Major roadway project is a roadway project proposed by a governmental entity, or a non-governmental entity if the roadway project is required as an off-site improvement by a development order or permit, that involves the construction of a new roadway or the redevelopment of an existing roadway if the redevelopment involves the addition of greater than two acres of impervious surface area or involves a project where the existing impervious surface area is greater than two acres and greater than 50 percent of the existing impervious surface area is removed. Major roadway projects shall comply with all applicable sections of this chapter. Major roadway projects shall not be eligible for the stormwater management retrofit exemptions contained in article V of this chapter. Stormwater treatment and rate or volume control shall be provided for all of the post project impervious surface area within the right-of-way. Peak post-development stormwater discharge rates shall not exceed peak pre-development discharge rates for all critical duration storms with return period frequencies up to and including the 25-year storm period. The analysis of pre-development runoff shall presume the site to be in a natural and undeveloped condition. For the purposes of complying with this subsection, phases or segments of a roadway project proposed under a common scheme shall be aggregated. b. Type II minor roadway project. Type II minor roadway project is a roadway project proposed by a governmental entity, or a non-governmental entity if the roadway project is required as an off-site improvement by a development order or permit, that involves the redevelopment of an existing roadway if the redevelopment involves the addition of greater than one acre of impervious surface area, but not greater than two acres of impervious surface area. New roadway projects do not qualify as a type II minor roadway project. New roadway projects must comply with the provisions set forth in subsection (j)(1)a. above. Stormwater treatment and rate or volume control shall be provided for any net additional impervious area. Peak post-development stormwater discharge rates shall not exceed peak pre-development discharge rates for all critical duration storms with return period frequencies up to and including the 25-year storm period. The analysis of pre-development runoff shall use the current site conditions. If an offsite regional facility to serve the entire roadway project is available, then the type II minor roadway project shall comply with the rate control, volume control, and water quality requirements of a major roadway project, as specified in article V. For the purposes of complying with this subsection, phases or segments of a roadway project proposed under a common scheme shall be aggregated. c. Type I minor roadway project. Type I minor roadway project is a project proposed by a governmental entity, or a non-governmental entity if the roadway project is required as an off-site improvement by a development order or permit, that involves the redevelopment of an existing roadway if the redevelopment involves the addition of greater than 3,000 square feet of impervious surface area, but not greater than one acre of impervious surface area. New roadway projects do not qualify as a type I minor roadway project. New roadway projects must comply with the provisions set forth in subsection (j)(1)a. above. type I minor roadway projects shall be considered type I redevelopment activity as set forth in section 5-113 of this chapter with respect to stormwater rate or volume control and stormwater treatment and shall comply with all other applicable sections of this chapter. For the purposes of complying with this subsection, phases or segments of a roadway project proposed under a common scheme shall be aggregated. d. Insignificant roadway project. Insignificant roadway improvement is any existing roadway redevelopment improvement which is proposed by a governmental entity, or a non-governmental entity if the roadway redevelopment project is required by a development order or permit as an off-site improvement, that is not exempt redevelopment, and does not meet the criteria of a major roadway project and involves the addition of 3,000 square feet or less of impervious surface area. Insignificant roadway improvements shall be exempt from the stormwater rate or volume control and stormwater treatment requirements, but shall comply with all other applicable sections of this chapter. For the purposes of complying with this subsection, phases or segments of a roadway project proposed under a common scheme shall be aggregated. (2) Compensating treatment, compensating rate control, and compensating volume control. For the purposes of complying with this section, the accepted engineering practice of providing compensating treatment, compensating rate control, or compensating volume control, within the same drainage basin as the roadway project, may be used to meet the treatment, rate control or volume control requirements of this chapter, provided there are no significant negative impacts on downstream flooding or problem areas. (3) Offsite regional facility. For the purposes of complying with this section, an offsite regional facility must be a permitted facility that provides rate (and/or volume) control and water quality treatment. The offsite regional facility will be considered available only if it meets the requirements of all applicable permitting agencies and will not delay the roadway project construction schedule. In addition, the offsite regional facility must meet the requirements of subsection (h) of this section. (k) Stormwater conveyance easements. (1) On-site easements. All new development shall include drainage easements for proposed post-development on-site watercourses to adjacent uphill property as necessary to ensure that parcels adjacent and uphill have access to the master stormwater management system. Such easements may be required to be dedicated to and maintained by the local governmental entity having primary jurisdiction over the site. (2) Off-site easements. If a newly concentrated flow or increased concentration of stormwater is discharged off-site into any conveyance other than a public drainage conveyance, or, a natural watercourse having defined banks, an adequate easement shall be obtained for the off-site conveyance. The local governmental entity with primary jurisdiction over the site shall require that such easements be dedicated to the public if the nature of the conveyance warrants its inclusion as a part of the master stormwater management system. (3) Acquisition of off-site stormwater easements. If an acceptable outfall as defined in this section is not available, and the nature of the discharge requires a conveyance which warrants its inclusion as part of a master stormwater management system, the applicant may petition the local governmental entity with primary jurisdiction over the site to seek condemnation of an appropriate easement to a practical point of discharge. If the local governmental entity elects to proceed with the requested condemnation, the applicant shall advance sufficient funds to cover its pro rata share of all costs associated therewith. Easements acquired through this process shall become public easements, and conveyances located within them shall be a part of the master stormwater management system. (4) Pass-through capability for stormwater run-off from uplands. Prior to adoption of a master stormwater management system plan, only the easements for stormwater conveyances and stormwater management facilities shall be required. The size of the easements and the design of required facilities shall be sufficient to account for the increased volume and rate of stormwater runoff anticipated after all uphill property is developed. Should the intended use for the uphill property not be known, the design shall presume the uses shown in the local government's land use plan. (l) Stormwater management facilities dedication. Stormwater management facilities shall be dedicated to the city when required by the director of public works. (m) Privately maintained underground stormwater management facilities. (1) Underground stormwater management facilities. Underground stormwater management facilities shall be authorized by the director when the applicant has demonstrated that positive non-mechanical outfall to an adequate off-site conveyance system is sufficient or it can be demonstrated that percolation through the underlying soils will allow the system to meet the recovery times provided in subsection 5-86(c). (2) Minimum design standards for all underground stormwater management facilities. Once the director has determined that use of underground stormwater management facilities are authorized, use of an underground stormwater management facility shall comply with the following conditions: a. The property owner shall obtain annual inspections and provide reports to the department in accordance with regulations and criteria promulgated by the department; b. An apparatus shall be incorporated into the system to capture trash and debris prior to discharge to attenuation or treatment cells; c. Underground cells shall have a minimum vertical clearance of 30 inches inside cells to allow for accumulation of sediments within the system unless an alternative can be justified to the satisfaction of the director; d. Underground storage cells with an impervious bottom shall have a positive slope to direct flows to discharge structures; e. Inspection portholes shall be provided at key locations to ensure that each entire cell is visible in its entirety. A remote/robotic camera system that makes each entire cell visible in its entirety may be provided in lieu of the inspection portholes; and f. In addition to the requirements of section 5-86, projects utilizing underground stormwater management facilities shall comply with applicable state stormwater management requirements.

(Ord. No. 04-O-02, § 2, Exh. 1(§ 4.6), 3-31-2004; Ord. No. 05-O-82, § 2, 11-22-2005; Ord. No. 06-O-42AA, § 7, 7-12-2006; Ord. No. 09-O-31AA, § 9, 10-29-2009; Ord. No. 12-O-14AA, § 7, 5-23-2012; Ord. No. 25-O-25AA, § 1, 11-19-2025)