§ 5-88 — Sediment and erosion control standards
Code of General Ordinances of the City of Tallahassee, Florida (Supp. No. 75: codified through Ordinance No. 25-O-28, enacted December 10, 2025) · Tallahassee Land Development Code § 5-88
Corpus is an independent public-information project, not the official City of Tallahassee website. Stable reference: corpuslaw.us/code/6dfe7cad-283f-4903-a92a-62897733ff3e
Sec. 5-88. - Sediment and erosion control standards.
The sediment and erosion control plan. The sediment and erosion control plan is a document to be submitted as part of every environmental management permit application. It shall indicate the type and location of the best management practices to be implemented on the development site in order to minimize erosion and prevent sediment from leaving the site. Failure to properly execute the sediment and erosion control plan or any condition of the permit as it relates to sediment and erosion control shall result in immediate issuance of a "stop work" order that shall remain in effect until the site is stabilized and brought into compliance as determined by growth management staff. This plan shall contain all pertinent information for review and implementation, such as a narrative, map, site plan, construction details, and calculations. The plan shall be adhere to the following requirements: (1) Sequence of construction. The sequence of construction shall require the immediate installation of the best management practices. This shall be followed by construction of the stormwater master facility or temporary sediment traps with a stone outlet structure (in the absence of a stormwater master facility), and prior to clearing the site in phases. Any discharge from these facilities or temporary sediment traps shall meet the state and federal requirements for turbidity and pollutant loading. (2) Vegetation. a. Retain existing vegetation by minimizing disturbance and identifying (flagging) limits of clearing. b. Immediately reestablish vegetation on all denuded areas that will not be covered with buildings or pavement. (3) Divert runoff away from denuded areas. Construct pipes or channels to intercept potentially erosive flows and route them to a well-protected outlet such as a storm drain or lined channel. Dikes and ditches shall be used at the base of disturbed slopes to protect downstream areas by diverting sediment-laden runoff to a sediment trap or stormwater management facility. Dikes and swales shall be constructed completely around disturbed areas to prevent clean runoff from entering the area and also to prevent silt-laden runoff from escaping before being de-silted. (4) Length and steepness of slopes. The use of benches is encouraged as a means to control erosion. Benches at least five feet in width shall be established at not more than 15-foot vertical intervals on all cut or fill slopes to control drainage or debris; except that, where only one terrace is required, it shall be at mid-height (six—nine feet). Swales shall be constructed at the top of all slopes with greater than 15-foot vertical intervals, and on all benches as required to stabilize the slope. (5) Lowering runoff velocity. Keep runoff velocities low by minimizing flow path lengths, constructing channels with gentle gradients, and lining channels with rough surfaces. (6) Trap sediment on-site. Install sediment basins or traps, straw bale dikes, or silt fences below denuded areas so that runoff will be detained long enough for suspended sediment to settle out. Locate sediment barriers above sensitive areas, public streets and adjacent properties. All silt fence shall be, at a minimum, type IV silt fence, as specified in the FDOT design standards. Temporary sediment basins or traps shall be located in low points below disturbed areas, or in swales and small drainage-ways, and above the stormwater management facility. Gravel construction entrances shall be located at all locations where construction equipment or vehicles exit the site. (7) Inspect and maintain control measures. Prior to and during construction, the permittee shall implement and maintain all erosion and sediment control measures (best management practices) required to retain sediment on-site and to prevent violations of state water quality standards. The permittee shall promptly correct any erosion or sediment accumulation that causes adverse impacts to the water resources. Failure to properly execute the sediment and erosion control plan or any condition of the permit as it relates to sediment and erosion control shall result in immediate issuance of a "stop work" order that shall remain in effect until the site is stabilized and brought into compliance as determined by growth management staff. Sediment accumulations in the system from construction activities shall be removed immediately to prevent loss of storage volume. All practices must be in accordance with the guidelines and specifications in Chapter 6 of the Florida Land Development Manual: A Guide to Sound Land and Water Management (Florida Department of Environmental Regulation 1988), latest edition, and the Florida Stormwater, Erosion, and Sedimentation Control Inspector's Manual, latest edition, both of which are hereby incorporated by reference, unless a project-specific erosion and sediment control plan is approved as part of the approved environmental permit, in which case the practices must be in accordance with the plan. (8) Stabilization measures. Any site or portion thereof where work is not being performed, and which remains cleared for over 14 days, shall be stabilized through the establishment of appropriate vegetative ground cover. All disturbed areas shall be permanently stabilized through the establishment of appropriate vegetative ground cover upon completion of development activities on the site. (9) Site specific conditions may require additional best management practices. During any phase of construction or operation, to prevent erosion or control sediment, beyond those specified in the erosion and sediment control plan, the environmental inspector may require the applicant to provide additional best management practices, or revise the sediment and erosion control plan as necessary, in accordance with the specifications in Chapter 6 of the Florida Land Development Manual: A Guide to Sound Land and Water Management (Florida Department of Environmental Regulation 1988). (10) Projects discharging to wetlands. For a project that will be discharging directly to a wetland, waterbody, or watercourse, an applicant must provide reasonable assurance that construction activities will not cause sedimentation and that filtration of runoff will occur prior to discharge into these features. It is presumed that this standard will be met if, in addition to implementation of the plan, any one of the following criteria is met: a. A minimum 50-foot width of undisturbed vegetation must be retained landward of the feature. During construction, runoff (including turbid discharges from de-watering activities) must be allowed to sheet flow across this undisturbed vegetation as the natural topography allows. Concentrated or channelized runoff from construction or alteration areas must be dispersed before flowing across this undisturbed vegetation. Limited disturbance necessary for the construction of outfall structures may occur within this area of undisturbed vegetation. b. Construction of the following perimeter controls at all outfall points to the feature must be completed prior to the start of any construction activities: 1. Stormwater master facility meeting the requirements of section 5-86; and 2. Sedimentation trap or basin located immediately upstream of the stormwater discharge facility referred to above; and 3. Spreader swale to reduce the velocity of discharge from the stormwater facility to non-erosive rates prior to discharge. These perimeter controls must be maintained routinely and operated throughout construction or alteration of the entire system; and 4. Sediment basins shall be constructed for all development activities prior to any soil disturbance within the proposed area to be developed. The location of the sediment basins shall be selected such that they provide maximum storage benefit and maximum protection to the wetlands. Sediment basins shall be constructed in accordance with the Florida Stormwater, Erosion, and Sedimentation Control Inspector's Manual, latest edition; and 5. The minimum required volume for the sediment storage zone shall be calculated as 68 cubic yards per acre of contributing area; and 6. The basin configuration shall be such that flow length is equal to at least two times the flow width. The length, width and depth of the sediment basin shall be measured at the stone outlet sediment trap (described below). The maximum contributing area to a single sediment pond shall not exceed 150 acres; and 7. Dewatering of the pond shall be provided by means of a stone outlet sediment trap similar to the one shown on page 6-357 of the Florida Department of Environmental Protection Florida Development Manual. The outlet sediment trap shall be constructed of No. 57 stone or other media providing comparable filtration. Minimum sediment trap width shall be four feet, and it shall extend from the sediment basin bottom to the top elevation of the settling zone. The minimum length shall be hydraulically designed to pass the average flow, Q, through the settling zone depth. Darcy's equation shall be used to determine the hydraulic capacity of the stone outlet sediment trap. In areas where sediment ponds cannot be constructed, alternate sediment capture systems must be designed. An example of where this might occur is a wetland road crossing where the only place to locate a sediment pond would be in the wetland and it is determined the pond would result in unacceptable wetland damage. Alternate sediment capture systems are not to be used when sediment ponds are feasible as ponds are more reliable. When an alternate sediment capture system is proposed, engineering analysis and design must show an ability to capture 0.02 mm (medium silt) at a hydraulic loading of no less than 0.5 cubic feet per second per acre of contributing area. Such proposals must specify maintenance requirements necessary to keep the alternate system functional. Construction or alteration of limited scope necessary for outfall structures may occur within this area of undisturbed vegetation. In determining whether construction or alteration is of "limited scope necessary", pursuant to the presumptive criteria above, the director shall require that the area of disturbance be minimized and that the length of time between initial disturbance and stabilization of the area also be minimized. 8. Sediment and erosion controls for properties with severe grades. Properties containing severe grade areas shall install a "heavy duty silt barrier" for sediment and erosion control. The "heavy duty silt barrier" shall consist of a double row of Type IV silt fence (as referenced in the Florida Department of Transportation's "Roadway Traffic Design Standards" and the Florida Department of Environmental Regulation's "The Florida Development Manual: A Guide to Sound Land and Water Management"). One row shall be placed at the toe of the slope. The other row shall be placed ten feet beyond the toe. The silt fence placed beyond the toe shall be a silt barrier that consists of a Type IV silt fence supported by "hogwire" fence. Wooden posts shall be six foot long and four inches in diameter to support the "hogwire" fence. A continuous row of erosion control devices shall face the toe of the slope. All silt fences and hogwire fences shall be trenched and extended six inches below grade. Wooden posts shall be installed eight feet on-center on the downhill side of the trench. The director may approve an alternative sediment and erosion control plan if it is demonstrated by the applicant that such alternative provides a higher level of protection. 9. Certification. These management practices shall be designed and certified by a professional registered in the state with the necessary expertise in the fields of hydrology, drainage, flood control, erosion and sediment control, and stormwater pollution control. Registered professionals shall be professional engineers licensed under F.S. ch. 471, professional landscape architects licensed under F.S. ch. 481, or professional geologists licensed under F.S. ch. 492, who have the referenced skills. The registered professional shall furnish the contractor with information pertaining to the construction, operation and maintenance of the erosion and sediment control practice.
(Ord. No. 04-O-02, § 2, Exh. 1(§ 4.8), 3-31-2004; Ord. No. 13-O-21, § 3, 10-23-2013)
Ask a question about Tallahassee law
Corpus searches the Tallahassee sections it holds and shows the ones that match, with their citations. Free, no sign-in.