For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 5-89 — Additional standards for the Bradfordville Study Area

Code of General Ordinances of the City of Tallahassee, Florida (Supp. No. 75: codified through Ordinance No. 25-O-28, enacted December 10, 2025) · Tallahassee Land Development Code § 5-89

Corpus is an independent public-information project, not the official City of Tallahassee website. Stable reference: corpuslaw.us/code/480f2a97-6205-494c-a2d7-9db5b812ec08

Sec. 5-89. - Additional standards for the Bradfordville Study Area.

For those properties within the Bradfordville Study Area, these provisions shall be supplemented by the more stringent standards set forth in the Leon County Code of Ordinances, as reproduced below: Sec. 10-4.381. - Intent of Bradfordville standards. It is the intent of this subdivision to provide more stringent standards that will protect the unique natural features within the Bradfordville Study Area. The requirements of this subdivision are supplemental to the requirements of the Leon County Environmental Management Act (EMA). If there are any standards in any other part of the EMA which are more restrictive than the standards set forth herein, the more restrictive standards shall apply. The Bradfordville Study Area is that area so defined in the Bradfordville Sector Plan adopted by the Leon County Board of County Commissioners on July 11, 2000. Sec. 10-4.382. - Stormwater treatment standards within the Bradfordville study area. Stormwater runoff from new development in the Bradfordville study area shall meet the standards set forth in this section in addition to other standards within Article IV. (a) Stormwater runoff shall be treated to one of the following standards below: (1) Systems utilizing on-line dry retention only. A volume of runoff calculated as four inches times the total impervious area that will be situated on the site shall be retained on the site or in an approved master stormwater facility. This calculation can exclude the wetted area of the pond/stormwater facility. This volume of runoff shall be collected from the entire developed portion of the site and directed to on-line dry retention storage. Retention can occur in cisterns, ponds, shallow swales, landscaped areas, or natural areas. (2) Systems utilizing a combination of off-line dry retention and detention: a. Off-line retention shall be provided with a treatment volume calculated as two and one-half inches times the total impervious area on the site. b. Detention portion of system—In addition to the dry retention volume, one of the following detention options shall also be provided: 1. Dry detention systems will provide a treatment volume calculated as two inches times the total impervious area on the site, or 2. Wet detention system with a permanent pool volume equivalent to two and nine-tenths inches times the impervious area on-site. c. The calculation of the above volumes can exclude the wetted area of the stormwater facility. d. Runoff from the entire developed portion of the site shall be directed in sequence to each of the above facilities. (b) Drawdown requirements: (1) For on-line dry retention (subsection (a)(1) above), the entire treatment volume must recover within 72 hours. (2) For off-line dry retention (subsection (a)(2)a. above), the entire treatment volume must recover within 24 hours. (3) For dry detention systems (subsection (a)(2)b.1. above), the treatment volume must recover within 72 hours. Dry detention systems will not include underdrains but will utilize an orifice or V-notch weir for drawdown. The bottom of the drawdown device will be a minimum of six inches above the pond bottom. (4) For wet detention systems (subsection (a)(2)b.2. above), the bottom of the weir crest will be a minimum of 12 inches above the normal water level (seasonal high groundwater table elevation). (5) Regardless of the method of volume recovery, the entire retention volume must recover within the time frame established above unless an approved continuous analysis, using Tallahassee Airport rainfall data from January 1, 1959 to December 31, 1998, demonstrates that the total volume retained within the stormwater system over the 40-year period is greater than or equal to that retained by a dry retention system as set forth in subsection (1) based on the above described recovery times. For systems requiring a combination of retention and detention, this analysis shall only be used for the retention portion of the system. The detention portion of this combination system will still be required in full pursuant to subsection (a)(2)b. (c) For calculating the treatment volume required for pervious pavements and graveled areas, initially such surfaces shall be assumed to be 100 percent impervious, then deductions in the required treatment volume for such areas can be taken that is equivalent to: (1) The porosity of the pavement material times the thickness of the paving material times a safety factor of five-tenths. (2) If, and only if, the soils immediately underlying the pavement for a depth of 18 inches have a permeability of three inches per hour or greater, as demonstrated by on-site percolation tests, then a further deduction can be taken equivalent to the porosity of the soil strata times four inches times a safety factor of five-tenths. The above deductions will be allowed provided that the applicant specifically commits, in his stormwater operating permit, to regularly sweep/vacuum the area covered with pervious pavement and to verify the pavement's percolation capacity when the operating permit is renewed. (d) Groundwater table: (1) Where volume recovery is to be by percolation, groundwater mounding calculations to demonstrate recovery of the retention volume pursuant to the requirements set forth in subsection (b) above shall be required unless the applicant conclusively demonstrates by other engineering methods that pond recovery will not be adversely affected by an elevated groundwater table. If the bottoms of all retention areas intended to percolate stormwater are shown by soil borings to be less than three feet above the historical wet-season high water table, a mounding analysis shall be required. (2) For dry detention systems, the bottom elevation of the detention basin shall be a minimum of one foot above the historical seasonal high groundwater table. (e) Where volume recovery is to be by irrigation, the rate of land application shall not exceed one and one-half inches per week unless the applicant can conclusively demonstrate that the on-site soil conditions and vegetation warrant a higher application rate. Under no circumstances shall irrigation water be allowed to discharge from the irrigation-site. (f) The requirements in this section shall not preclude the applicant from voluntarily choosing to design and construct the on-line dry retention facility as an off-line facility. (g) Facility design standards. (1) Facility configuration: All on-line facilities shall have a flow-path-length to flow-path-width ratio of 2:1 or greater. The inlets and outlets shall be on opposite ends of the facility. If this is not possible, the effective flow length shall be increased by adding diversion barriers within the facility as necessary to provide this minimum flow length. (2) Retention ponds/areas shall have 4H:1V maximum side slopes on a sufficient length of the perimeter to allow adequate maintenance access to the bottom of the facility. If any of the side slopes are steeper than this, a security fence shall be placed completely around the perimeter of the facility and located exterior to the maintenance access ways. The fence shall not be required if the pond depth is less than 18 inches. (3) Wet detention ponds shall have 6H:1V maximum side slopes to two feet below the normal water level, then a maximum side slope of 2H:1V to the bottom. (4) Retention facilities shall have flat bottoms in order to maximize the surface area for percolation. (5) Maintenance access requirements: a. For every facility, the owner or developer shall provide, at a minimum, a 15 feet wide clear and stable access to the facility from the nearest "public" right-of-way or road. Such access shall be evidenced by a recorded reservation or grant of an easement, which shall run with the land, to the benefit of the county. b. For retention facilities with an overall depth greater than 18 inches, provide, at a minimum, a 15 feet wide clear, level and stable access around a sufficient portion of the perimeter of the facility, that is inside of any fences and external to the top-of-bank of the facility, to allow adequate maintenance from dry land. For retention facilities with an overall depth of 18 inches or less, provided the facility has side slopes of four horizontal to one vertical (or less) on at least one side of the facility, the applicant can provide the above access on the sloped side of the facility only. Any access required by the provisions of this subsection shall be evidenced by a recorded reservation or grant of an easement, which shall run with the land, to the benefit of the county. c. The minimum inside radiuses of all access ways shall be 20 feet. d. Personnel and mechanized equipment shall be provided to all inlet and outlet structures. e. If Leon County is proposed to be the maintenance entity for any stormwater management facility permitted under this section, either by dedication, or by reservation of an easement, or by any other process, the applicant shall submit the engineering design for the facility directly to the Leon County Department of Public Works for its review and approval as to the adequacy of maintenance access to the facilities. An environmental permit shall not be issued until the applicant demonstrates, in writing, the approval of the department of public works. (6) Skimmer/trash rack requirements: a. Trash/leaf traps with easy maintenance access shall be provided at key inlets and all outlets from a facility unless the applicant can conclusively demonstrate that it is not possible. b. All outlet structures shall have an oil skimmer that extends above and below any outlet structure opening. (7) Energy dissipation requirements: a. Energy dissipation devices sufficient to prevent erosion and resuspension of loose sediments shall be placed on all inlets to retention facilities. b. Energy dissipation devices sufficient to prevent downstream channel erosion shall be placed at the outlets of all retention facilities. (8) Stabilization of stormwater treatment facilities: All berms and side slopes shall be stabilized with pinned sod. Pond bottoms can be seeded and mulched. Restabilization by the contractor or owner shall be necessary until such time that the sod is fully rooted and otherwise well established. (9) Rate control as required in subsection 10-4.302 can be provided within any of the above water quality treatment facilities provided that the water quality treatment as required within this section is fully satisfied prior to any overflow/discharge from the facility. Sec. 10-4.383. - Wetlands within the Bradfordville Study Area. (a) Jurisdictional determination. The beneficial functioning of wetlands as areas for the natural storage and filtration of surface water runoff shall be protected, and shall be enhanced where functional degradation has occurred. Final determination of a wetland area, if in question, shall be made by the county administrator or designee based on a site inspection and the documentation of findings pursuant to the definition of a wetland in Chapter 62-340, F.A.C. (b) Boundary determination. Determination of the actual extent of a wetland area on a development site shall be made by a qualified professional retained by the applicant, based on soils analysis, botanical review surveying, or other standard engineering or environmental analysis practices, and subject to review and approval by the county administrator or designee. (c) Protection of topography and hydrocycle. Existing natural topography shall be maintained within wetland areas. No alterations shall be made within a wetland area to the natural fluctuation of water levels or flows unless such alterations are part of an approved stormwater detention or retention system, or unless such alterations are necessary for an approved utility system. In either case, such alterations are limited to wetlands which have been determined to be degraded to the extent that their ecological functions have been significantly and detrimentally degraded. As a condition of the use of such a wetland, the design of the overall wetland alteration shall result in the substantial re-establishment of the natural functioning of the undisturbed portion of the wetland as described in the 1988 DER Florida Development Manual Guide to Sound Land and Water Management, or its successor publication. Wetlands which have been cleared as the result of silviculture operations, wetlands which have been subjected to animal activity during agricultural operations, wetlands which have been disturbed through activities which are a violation of the Leon County Code, and as determined by the county administrator or designee, wetlands which may have their beneficial level of functioning restored through natural processes, will not be considered degraded for the purposes of this subsection. If none of these conditions apply, the county administrator or designee shall determine a wetland to be significantly and detrimentally degraded if at least four of the five following conditions apply: (1) No evidence of utilization by wildlife (mammals, aquatic birds, reptiles, amphibians, fish, and invertebrates) whose life cycles are dependent on wetland communities. (2) Vegetation if present is not indicative of a natural community type recognized in published scientific literature. (3) Greater than 75 percent of the vegetation is comprised of upland plant species or undesirable exotic species. (4) Evidence of draining, ditching, dredging, filling, or sediment deposition that has negatively impacted the hydrology of the feature. (5) Physical quality of soil is reduced as evidenced by pore size, rupture resistance, and structure. Sec. 10-4.384. - Best management practices for conservation and preservation areas. Best management practices shall be used in conjunction with all new development and all redevelopment in areas within designated canopy road corridors or within 50 feet of any floodplain, floodway, wetland, waterbody, natural watercourse, high quality successional forest, native forest, active karst feature, habitat area of any endangered, threatened, or special concern species, or any other environmentally sensitive area as identified in the Tallahassee-Leon County Comprehensive Plan, Conservation Element. Notwithstanding anything to the contrary in the definition of best management practices set forth in section 10-1.101, the best management practices for conservation and preservation areas within the Bradfordville Study Area are set forth below and are in addition to any other best management practices required by any provision of this Code: (1) Buffering, which shall include vegetated berms along the lower contours of lots, so as to provide or improve wildlife habitat and to improve water quality. Berms or buffers shall be vegetated with natural indigenous vegetation suitable for soil and hydrology of the site. (2) Restricted use of pesticides, herbicides, and fertilizers to those materials which have rapid decomposition characteristics, are labeled for aquatic use, and are used at the lowest possible label rates. Fertilizer constituents should have at least 50 percent slow release characteristics, be applied at the lowest labeled rate per application, be a non-phosphorous or low phosphorous analysis, and be formulated for good slope retention characteristics. (3) Preservation or revegetation of natural wetlands, floodways and watercourses. (4) Use of native, low-fertilization, and low-maintenance vegetation. (5) Regular maintenance and upgrading, as necessary, of septic tanks and approved discharges from washing machines and garbage disposals. (6) Soil conservation service approved conservation practices, including erosion and sediment control and water quality practices for all agricultural operations. Sec. 10-4.385. - Natural area requirements. Maintenance of natural areas. A management plan submitted as part of the environmental management permit application is required for all pre-development vegetation located on the site. No disturbance of any pre-development vegetation or soils shall be permitted prior to the approval of the management plan. Vegetation management shall be allowed for the purpose of integrating pre-development vegetation both visually and physically into the site's master landscape plan. Maintenance guidelines shall be required and provisions made for any supplemental planting, if additional plantings are desired. Approved maintenance activities include pruning of dead and hazardous tree limbs, planting, mulching, fertilization, and pest control. Mechanical methods which compact the earth or impair root systems, or the pruning of limbs greater than ten percent of the green mass of a tree are prohibited, unless otherwise allowed in an approved management plan. Activities that would result in a change in the vegetative composition of the forest community including removal of native species and replacement by invasive/exotics, or the removal of understory and ground cover are prohibited. Sec. 10-4.386. - Stormwater management facility landscaping. (a) Visual screen. A visual screen shall be placed around the entire perimeter of any detention or retention facility around which fencing is required pursuant to section 10-4.303. (b) Landscape area credit availability. As a design alternative, 100 percent credit can be given toward the 25 percent landscape area requirements of section 10-4.344 when stormwater retention facilities meet the minimum standards as follows: (1) Impoundment water depth is no deeper than 24 inches. (2) Sediment sumps are to be located at all points of concentrated inflows to the pond. (3) The pond area allowable for landscape credit shall be defined as the area encompassed by the pond's contour line at the spillway elevation. (4) Landscaping shall function to visually integrate the stormwater management system into the overall landscape design of the site. (5) The pond is landscaped in accordance with the following standards: a. Planting specifications. Species selected for stormwater management facility landscaping shall be suitable for individual pond characteristics of soil, slope, aspect and hydro period and micro climate. b. Plant material requirements. 1. Stormwater management facilities are to be landscaped with native species which are well suited to the use within the boundaries of a stormwater management facility, including fluctuating water levels, changes in hydro periods, and anthropogenic impact. Aquatic species which are listed as prohibited by the Florida Department of Environmental Protection cannot be used under any circumstances. (c) [Reserved.] (d) Total tree, shrub, and ground cover requirements within the stormwater management facility area shall be determined using the planting specifications in the "Environmental Design Guide," published by the City of Tallahassee, Growth Management Department, or its successor. (e) Creative design and spacing of trees, shrubs and ground covers is encouraged. (f) Plant material. No aquatic plants or plants which are classified as those requiring water on a continual basis for survival shall be permitted. Since dry retention ponds typically possess significant fluctuation in hydro periods, with the potential for extended dry periods, plants must be chosen which are adaptable to either dry or wet conditions, but capable of surviving and growing in either extended periods of inundation or extended periods of drought as referenced in the "Environmental Design Guide," published by the City of Tallahassee, Growth Management Department, or its successor. Other species may be used in dry retention ponds if there is scientific evidence of their adaptability. Creative design and spacing of trees, shrubs and ground covers is encouraged. (g) Swales and berms. All swales and berms shall be sodded. Sec. 10-4.387. - Topographic alterations. All projects involving alteration of the contour, topography, use or vegetative cover of land, shall comply with the "Florida Development Manual—A Guide To Sound Land and Water Management" published by the Florida Department of Environmental Protection. Sec. 10-4.388. - Notice of violation. Whenever the county administrator or designee determines that a violation of this article has occurred, the county administrator or designee shall immediately issue written notice to the person in violation, identifying the nature and location of the violation and specifying that remedial action is necessary to bring the violation into compliance. For purposes of this section, the person in violation shall include the owner of the site and any and all contractors, agents or other individuals actually violating any of the provisions of this article. The person in violation shall immediately, conditions permitting, commence remedial action and shall have three calendar days after receipt of the notice to correct erosion/sediment control violations, and seven calendar days after the receipt of the notice, or such longer time as may be specified in the notice, to complete all other remedial actions required to bring the activity into compliance with this article. Sec. 10-4.389. - Stop work order. (a) Warranting circumstances. The director shall have the authority to immediately issue a stop work order in any of the following circumstances: (1) When clearing or other development of land is being implemented without an approved environmental management permit. (2) Upon the failure of the permittee, or failure by the property owner if no permit exists, to take immediate corrective action when there is an apparent danger to life or property. (3) Whenever ongoing non-complying work is not immediately and permanently stopped upon receipt of a written or oral notice of violation. (4) Whenever tree protection measures have not been implemented or maintained and danger to protected trees exists or appears imminent. (5) Whenever remedial work required by notice of violation pursuant to section 10-4.388 or section 10-4.602 is not completed in the time period specified. (6) Upon failure to post a placard indicating existence of an approved environmental management permit. (7) Upon failure to have the approved environmental management permit and plans available on-site. (8) Upon the failure of the permittee, or failure by the property owner if no permit exists, to contain sediments on-site. (9) Whenever there are inadequate or improperly installed erosion and or sedimentation control devices on-site and written or oral notice of violation has been issued. (b) Content and scope. The stop work order shall specify the circumstances which have resulted in issuance of the order. It shall also direct that all work be stopped other than such remedial work as is deemed necessary to bring the project into compliance, or it may specify the cessation of specific work by functional nature, such as clearing, grading, roadway construction, building erection or utility construction. The order may apply to the entire project or to any geographical portions of the project which may be individually specified. Sec. 10-4.390. - Failure to comply after notice of violation or stop work order. If the person in violation, including the owner, fails to complete recommended remedial action within the time allowed, fails to take the recommended remedial action after the issuance of a stop work order under section 10-4.388 or section 10-4.603, or if any person continues any development activity in violation of a stop work order, the county administrator or designee shall refer such matter to a duly established code enforcement board or shall initiate any other enforcement action authorized by law. Sec. 10-4.391. - Immediate corrective actions. Whenever it is determined by the county administrator or designee that failure to maintain stormwater management facilities or erosion or sedimentation controls, or failure to conform to the provisions of this article or permit conditions, is resulting in danger or damage to life or property, the county administrator or designee require immediate corrective action. Sediment controls which are breached due to development activity, rain, or other factors shall be repaired within 24 hours of the breach. Initiation of any required clean-up activities, including authorized off-site work, shall commence within 24 hours and shall be completed within a time specified by the county administrator or designee. Failure to take such immediate corrective action when notified of the need for such action shall constitute a violation of this article. If immediate corrective measures are not taken by the permittee or owner and the state of development is such that there is a danger or hardship to the public, the county administrator or designee may enter upon lands, take corrective actions, and place a lien on the real property of such person or persons to recover the costs of the corrective measures; in addition, the county administrator or designee may revoke the operating permit or the environmental management permit, if either exists, pursuant to sections 10-4.604 or 10-4.605. Nothing in this section prohibits the institution of any lawsuit by the county or any property owner with standing for injunction or damages by reason of a breach of this section.

(Ord. No. 12-O-14AA, § 8, 5-23-2012)

Ask a question about Tallahassee law

Corpus searches the Tallahassee sections it holds and shows the ones that match, with their citations. Free, no sign-in.