Sec. 5-90. - Additional stormwater retention standards for the Lake Jackson Drainage Basin.

(a) This section shall apply only within the Lake Jackson Drainage Basin, as defined by the Tallahassee-Leon County geographical information system (GIS). (b) Volume control required. Runoff volumes in excess of the pre-development runoff volume shall be retained for all storm events up to a 100-year, 24-hour duration storm, except that if multiple development sites are located within the basin, the excess volume may be discharged from individual sites to an approved regional retention facility located within the closed basin as may be allowed under other subsections of this section and pursuant to subsection 5-86(h). (c) Redevelopment requirements: For properties north of I-10, pre-development runoff volume calculations shall be based on a natural condition with an allowable 50 percent credit for existing impervious surfaces. The existing impervious areas within the Activity Center (AC) zoning district, north of I-10 and within the Lake Jackson Basin, shall not be subject to this standard, except that newly created impervious area shall be subject to the requirements of subsection (b) of this section. Properties south of I-10, and existing impervious areas north of I-10 within the AC zoning district, are not subject to the requirements of this subsection, but shall be subject to the redevelopment standards of article V of this chapter. (d) Recovery of the retention volume shall comply with one of the following: Option (1): On the basis of a subsurface geotechnical analysis demonstrate the functionality of the retention facility through a continuous hydrologic simulation. The analysis shall clearly demonstrate that the increase in runoff volume above the predevelopment condition is retained within the on-site stormwater facility. Additionally, the rate of discharge shall not exceed predevelopment rates for all duration and return frequencies up to and including the 25-year critical duration storm. The continuous hydrologic simulation can be accomplished by developing a stage/storage/infiltration relationship based on the proposed retention facility configuration and reported design infiltration rate. This relationship can be used to model the retention facility over an extended period of rainfall. Option (2): One-half of the required pond volume shall be recovered within seven days, and the full volume shall be recovered within 30 days.

(Ord. No. 16-O-04, § 1, 9-28-2016)