§ 102.2 — INSPECTIONS REQUIRED
Atlanta City Code (Code of Ordinances, Part II) (Supp. No. 108, Update 1: codified through Ordinance No. 2026-37 (26-O-1511), enacted September 30, 2026) · Atlanta Land Development Code, App. A, ch. I, § 102.2
Corpus is an independent public-information project, not the official City of Atlanta website. Stable reference: corpuslaw.us/code/cbf3f2f3-dda8-44fe-b5a1-67aecdc77787
102.2. - INSPECTIONS REQUIRED.
(a) Inspections required under the provisions of this Code shall be made by the Director. Upon presentation of proper credentials, the Director may enter, at reasonable times, any building, structure or premises in the City of Atlanta, Georgia, to perform any duty imposed by this Code. The Director is hereby authorized and directed to enforce all provisions of this Code, and is hereby invested with all police power necessary for the purpose of issuing subpoenas and copies of charges for the prosecution of any person or persons as may be charged with any violations of this or other ordinances of the City of Atlanta, Georgia. (b) All construction, alteration, repair, installation, erection, removal, demolition, uses, locations, and maintenance of equipment, appliances or systems for which a permit has been issued as prescribed in this Code shall be subject to inspection by the Director. (c) Work requiring a building permit shall not be commenced until the permit holder or agent shall have posted the building permit card in a conspicuous place on the front of the premises. The permit shall be protected from the weather and located in such a position as to permit the Director to conveniently make the required entries thereon. This permit card shall be maintained in such a position by the permit holder until the Certificate of Occupancy has been issued by the Director. (d) The Director upon notification from the permit holder or agent, shall make the following inspections of buildings and such other inspections as may be necessary, and shall either approve that portion of the construction as completed or shall notify the permit holder or agent wherein the same fails to comply with the law: Foundation Inspection: To be made after trenches are excavated and forms erected. Frame Inspection: To be made after the roof, all framing, fire-blocking and bracing is in place, all concealed wiring, all pipes, chimneys, ducts and vents are complete. Final Inspection: To be made after the building is completed and ready for occupancy. (e) Work shall not be done on any part of a building or structure beyond the point indicated in each successive inspection without first obtaining the written approval of the Director. Such written approval shall be given only after an inspection shall have been made of each successive step in the construction as indicated by each of the foregoing three inspections. (f) Reinforcing steel or structural framework of any part of any building or structure shall not be covered or concealed in any manner whatsoever without first obtaining the approval of the Director. (g) In all buildings where plaster is used for fire protection purposes, the permit holder or agent shall notify the Director after all lathing and backing is in place. Plaster shall not be applied until the approval of the Director has been received (See Chapter X). (h) The Director may require that the owner or agent employ a special inspection service on large or special buildings or work. The special inspection service shall be qualified and approved by the Director. Reports in writing of all code violations and other information required by the Director shall be submitted.
Ask a question about Atlanta law
Corpus searches the Atlanta sections it holds and shows the ones that match, with their citations. Free, no sign-in.