§ 7.12.10 — Materials and Installation
Code of Columbus, Georgia (Supp. No. 77, Update 1: codified through Ordinance No. 26-047, adopted September 22, 2026) · Columbus, Ga., Code § 7.12.10
Corpus is an independent public-information project, not the official City of Columbus website. Stable reference: corpuslaw.us/code/38f9a5ff-0b50-4449-abc5-128e0bf5b5b4
Section 7.12.10. - Materials and Installation.
A. Materials and Installation. Materials and installation requirements for storm sewer pipes shall conform to Georgia DOT standards or to the specifications of the Engineering Department. B. Construction Standards for Storm Drains. 1. All concrete pipe must be reinforced and meet AAS14TO M170. That which is used within the ROW must be Class III. Conditions such as shallow cover or depths that exceed 25 feet may require a higher class pipe. 2. Any storm drain structure over 3.5 feet must have steps per the Georgia DOT standards. 3. All pipe in storm drain structures shall be struck even with the inside wall. 4. Preformed joint sealer, which conforms to AASHTO M198 for Type B flexible plastic gaskets, shall be used in lieu of the mortar jointing method. 5. The interior surfaces of all storm drain structures shall be smoothed to an acceptable standard using mortar mixed to the manufacturer's specifications. 6. All frames, grates, rings and cover, etc., must conform to the standards set forth in the Georgia DOT specifications. The current Columbus standard for manhole ring and cover is the US Foundry 223 or equal. 7. Backfilling of trenches shall be accomplished immediately after the pipe is laid. The fill around the pipe shall be placed in layers not to exceed 6 inches with each layer being thoroughly compacted. All material shall have an in place density of 98%-modified proctor to a depth of 6 inches below the finished grade, and 95%-modified proctor at depths greater than 6 inches below the finished grade. Compaction requirements shall be attained by the use of mechanical compaction methods. Each layer of backfill shall be placed loosely and thoroughly compacted in place. 8. All backfill shall be nonplastic in nature, free from roots, vegetative matter, waste, construction material or other objectionable material. Said material shall be capable of being compacted by mechanical means and shall have no tendency to flow or behave in a plastic manner under the tamping blows. (A) Removal. Material deemed by the Engineer as unsuitable for backfill purposes shall be removed and replaced with selected backfill material. (B) Water. Water shall not be permitted to rise in trenches that are not backfilled after the pipe has been placed.
Ask a question about Columbus law
Corpus searches the Columbus sections it holds and shows the ones that match, with their citations. Free, no sign-in.