§ 7.12.5 — Minimum Stormwater Management Standards
Code of Columbus, Georgia (Supp. No. 77, Update 1: codified through Ordinance No. 26-047, adopted September 22, 2026) · Columbus, Ga., Code § 7.12.5
Corpus is an independent public-information project, not the official City of Columbus website. Stable reference: corpuslaw.us/code/9ad7540f-7a45-42be-ac7f-fa51b2e6ba80
Section 7.12.5. - Minimum Stormwater Management Standards.
The following standards are the minimum stormwater management performance requirements for new development or redevelopment sites falling under the applicability criteria above. A detailed technical explanation of each minimum standard is provided in the Georgia Stormwater Management Manual, Volume 2, Section 1.2. A. Use of Better Site Design Practices for Stormwater Management. Site designs should preserve the natural drainage and treatment systems and reduce the generation of additional stormwater runoff and pollutants to the fullest extent practicable. B. Stormwater Runoff Quality. 1. All stormwater runoff generated from a site shall be adequately treated before discharge. Stormwater management systems (which can include both structural stormwater controls and better site design practices) must be designed to remove 80% of the average annual postdevelopment total suspended solids (TSS) load and be able to meet any other additional watershed- or site-specific water quality requirements. 2. It is presumed that a stormwater management system complies with this performance standard if: (A) It is sized to capture and treat the prescribed water quality treatment volume, which is defined as the runoff volume resulting from the first 1.2 inches of rainfall from a site; and (B) Appropriate structural stormwater controls are selected, designed, constructed, and maintained according to the specific criteria in this Manual. (C) Runoff from hotspot land uses and activities is adequately treated and addressed through the use of appropriate structural stormwater controls and pollution prevention practices. C. Stream Channel Protection. Stream channel protection shall be provided by using all of the following three approaches: 1. 24-hour extended detention storage of the 1-year, 24-hour return frequency storm event; 2. Erosion prevention measures such as energy dissipation and velocity control; and 3. Preservation of the applicable stream buffer. D. Overbank Flood Protection. Downstream overbank flood protection shall be provided by controlling the post-development peak discharge rate to the predevelopment rate for the 25-year, 24-hour return frequency storm event. If control of the 1-year, 24-hour storm (Minimum Standard #3) is exempted, then overbank flood protection shall be provided by controlling the post-development peak discharge rate to the predevelopment rate for the 2-year through the 25-year return frequency storm events. E. Extreme Flood Protection. Extreme flood protection shall be provided by controlling and/or safely conveying the 100-year, 24 hour return frequency storm event such that flooding is not exacerbated. Existing and future floodplain areas should be preserved as possible. F. Downstream Analysis. A downstream hydrologic analysis shall be performed to determine if there are any additional impacts in terms of peak flow increase or downstream flooding while meeting Minimum Standards A through E. This analysis shall be performed at the outlet(s) of the site, and downstream at each tributary junction to the point(s) in the conveyance system where the area of the portion of the site draining into the system is less than or equal to 10% of the total drainage area above that point. G. Groundwater Recharge. Annual groundwater recharge rates should be maintained to the extent practicable through the use of nonstructural methods. H. Construction Erosion and Sedimentation Control. Erosion and sedimentation control practices shall be utilized during the construction phase or during any land disturbing activities. I. Minimum Standard #9 - Stormwater Management System Operation and Maintenance. The stormwater management system, including all structural stormwater controls and conveyances, shall have an operation and maintenance plan to ensure that it continues to function as designed. J. Minimum Standard #10 - Pollution Prevention. To the maximum extent practicable, the development project should [shall] implement pollutant prevention practices and have a stormwater pollution prevention plan. K. Minimum Standard #11 - Stormwater Management Site Plan. The development project shall prepare a stormwater management site plan for local government review that addresses Minimum Standards A through J.
Ask a question about Columbus law
Corpus searches the Columbus sections it holds and shows the ones that match, with their citations. Free, no sign-in.