For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 8.8.10 — Resurfacing

Code of Columbus, Georgia (Supp. No. 77, Update 1: codified through Ordinance No. 26-047, adopted September 22, 2026) · Columbus, Ga., Code § 8.8.10

Corpus is an independent public-information project, not the official City of Columbus website. Stable reference: corpuslaw.us/code/f3cef49c-35f3-4750-9d3d-dcf31e7c2e77

Section 8.8.10. - Resurfacing.

A. The permittee may be required to resurface all or portions of roadway where work has been performed. Roadways that are identified on the "Reconstruction List" for the City shall not require resurfacing by the permittee. Roadways that are not listed on the "Reconstruction List" shall be resurfaced by the permittee when they meet the following criteria: 1. In a block where linear cuts, running parallel to the centerline of the street and where these cuts extend more than 30% of the entire block length, the permittee responsible for these cuts shall at their expense resurface the street within the block affected. 2. In a block in which 3 or more street openings are made by a single permittee, owner, developer or their designated contractor. The permittee, owner or developer responsible for these cuts shall, at their expense, resurface the affected area. The exact limits shall be determined by the Engineering Department. This shall apply to all streets not on the "Reconstruction or Resurfacing List." 3. The Reconstruction or Resurfacing List shall be furnished to all stake holders who request it annually. The list will contain a prioritized list of streets that the City hopes to resurface with in the coming 2 fiscal years. The list will for resurfacing at least 2 years in advance. Should priorities change the same stake holders will be notified by the City by receiving an updated list of the street priority. B. The resurfacing shall consist of a minimum of a one and one-half 1½ inch Type F (165 lbs/square yard) overlay of asphaltic concrete. Other mixes may be approved by the Engineer as needed. The resurfacing shall extend for the entire affected block length and shall be a minimum of one lane wide and a maximum the entire roadway width. The actual length of overlay may be adjusted at the discretion of the City Engineer. The resurfacing requirement may be waived if the street is programmed for Resurfacing or Reconstruction. C. Cutting of roadways within the first 2-year period following an overlay is prohibited without written permission of the City Engineer. Emergency cuts within a 2-year period on roadways that have been resurfaced may require the permittee to resurface a portion of that roadway at his expense. A cut shall be defined as excavation of the roadway surface that is a minimum of 2 feet by ½ the width of the travel lane. "Pot holing" for locations of underground utilities prior to trenchless installations are not considered cuts.

Ask a question about Columbus law

Corpus searches the Columbus sections it holds and shows the ones that match, with their citations. Free, no sign-in.