For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 8.8.3 — Application

Code of Columbus, Georgia (Supp. No. 77, Update 1: codified through Ordinance No. 26-047, adopted September 22, 2026) · Columbus, Ga., Code § 8.8.3

Corpus is an independent public-information project, not the official City of Columbus website. Stable reference: corpuslaw.us/code/3edf14de-3ebe-4aec-a34f-03cfefcc75a7

Section 8.8.3. - Application.

A. A Permit shall be required from the City Engineer to work on any public right-of-way within the city. A copy of the approved permit shall be kept on site by the permittee or his contractor. Upon completion of the work the permittee shall notify the Department of Engineering by either faxing or mailing a copy of the front sheet of the permit application to the Department. B. Work done on Rights-of-Way that are not under the exclusive jurisdiction of the Columbus Consolidated Government from other agencies, when the following conditions apply: 1. Work done on a designated State or Federal Highway shall obtain a permit from the Georgia Department of Transportation or other appropriate agency. 2. Work done on roadways that are listed on the "Transportation Improvement Plan", or have received funds from the State or Federal Government for improvement, shall obtain permits from the Georgia Department of Transportation or other appropriate agency. 3. A courtesy copy of the approved permit issued by the other agency shall be forwarded to the Department of Engineering by the permittee, prior to beginning work. 4. All local and State Ordinances concerning construction practices, safety, erosion control, air quality and stormwater management shall be in effect regardless of whether the permit was issued by the Columbus Consolidated Government or another agency such as the Georgia Department of Transportation. 5. In some cases a separate permit over and above the permit for Work on Right-of-way may be required by the Columbus Consolidated Government regardless of who has jurisdiction over the immediate Right-of-way on which the work occurs because of the impact that the proposed work may have on other local ordinances. There are no exemptions from full compliance with all local ordinances regardless of whether a permit has been issued by the City. C. Work done within the limits of a new development, before the development is accepted by the City, shall be covered by the Development Permit. However should the work extend beyond the limits of that development onto existing public right-of-way, a Work on Right-of-Way Permit shall be required. The designer of the development has the option of indicating where work will extend beyond the limits of the development onto public right-of-way and thus have said work covered under the Development Permit. This coverage must be agreed to in advance of the issuance of a Development Permit. D. When a new development is accepted by the City and the right-of-way is opened to the public, then subsequent work done by anyone on the newly opened right-of-way will require a Work on Right-of-Way Permit. E. Application documents required are as follows: 1. Completed application, including an emergency number and local point of contact from the permittee. The point of contacts shall be available 24 hours a day, 7 days a week, including weekends and holidays. 2. The permittee shall provide a drawing showing the location of the proposed work with enough detail to quickly identify the exact limits of the proposed work. The application and the drawing must include a current address and distance from the nearest intersection. A database will be established using the address as one of the primary methods of location. F. A Traffic Control Plan must be attached or made a part of the permit by reference of a previously approved Traffic Control Plan in accordance with the appropriate Manual on Uniform Traffic Control Devices (MUTCD) layout of Temporary Traffic Control Devices as discussed below. 1. All temporary traffic control shall be set up in accordance with Part 6, of the MUTCD, current edition. 2. All Traffic Control Personnel (flaggers) shall have a current certification of training from the Georgia Department of Transportation or the National Safety Council. Proof of certification shall be maintained on the flagger's person while on the job. The City may check for current certification at any time. 3. The project foreman shall have a current certification of training from the Georgia Department of Transportation or the National Safety Council. Proof of certification shall be maintained on the foreman's person while on the job. The City may check for current certification at any time. 4. The project foreman shall insure that all traffic control devices are set up in accordance with the MUTCD, Current edition. A copy of the MUTCD section covering the Traffic Control setup shall be on site and in the possession of the project foreman at all times. 5. Improper setup of traffic control devices may result in citation of the project foreman or the permittee and immediate shut down of the project. G. Additional information including, but not limited to profiles, cross sections or any other information needed by the City to make a proper assessment of the situation before issuing a permit may be asked for by the Department of Engineering at any time. Such information shall be provided before a permit will be issued. H. The permittee shall note that coordination with the City Arborist has occurred and shall identify possible conflicts with existing trees on the drawing. It is the responsibility of the permittee to review the work site and indicate the presence of trees. I. Permits for work on right-of-way shall become void if work has not started within 90 days of the issue date of the permit. Any work started after the 90 days shall require a new application for permit. If work is begun after the permit expires and no new permit has been applied for then the work is considered "work without a permit" and appropriate citations or other enforcement may apply. J. Street Cuts Only. Work that is confined to the paved travel way shall require a separate Street Cut Permit describing the cut in the pavement. The minimum information shall be the size and location of each cut. (i.e. 10' × 6' cut in asphalt in front of 1212 12th Avenue). Work confined in the street may be permitted by using the "Street Cut Permit" application form, rather than the work on right-of-way application.

Ask a question about Columbus law

Corpus searches the Columbus sections it holds and shows the ones that match, with their citations. Free, no sign-in.